Cumberland County · Dickinson Township · #2948
Gilbert Pest Control office facility
Dickinson Township, PA · 4,966 sq ft non-residential, office
In short: Gilbert Pest Control office facility is an office development in Dickinson Township, Cumberland County, PA. It would add 4,966 sq ft of non-residential space. Its estimated construction value is about $1.5M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Preliminary/final land development plan: county review report filed for county review (December 17, 2024). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
A 1.8-acre tract in Dickinson Township is to be developed into an office facility with parking and a stormwater management area, about 4,966 sq ft.
Official description: The purpose of this plan is to develop an existing 1.8 acre tract to create an office facility with associated parking and stormwater management facility.
- Plan type
- Preliminary/final land development plan: county review report
Project history
- 2025-05-23 · Land sold to Threecg LLC for $138K · Cumberland County parcel records
- 2024-12-17 · #2948 · Preliminary/final land development plan: county review report · 4,966 sq ft
The full picture AI research · Nov 4, 2026
A 1.8-acre piece of land in Dickinson Township, Cumberland County, is planned for a small office building of about 4,966 square feet. The plan also includes a parking area and a stormwater basin. A stormwater basin is a low area that collects rainwater so it drains off slowly. County records name the project as a Gilbert Pest Control office facility.
The county records show the plan was filed for review on December 17, 2024. The records do not say what is on the site now, though a tract of this size is probably undeveloped or lightly used.
Searches found no news coverage, township meeting item, builder page, business listing or permit record that clearly matches this project. Nothing online shows approval, construction or opening, so this summary rests on the county facts alone.
What it could mean nearby
- A building of about 5,000 sq ft would likely bring modest daily traffic from staff and service vehicles, but no traffic study was found.
- The stormwater area is meant to manage runoff from the new roof and parking, though the records give no details on how well it would work.
- A small office would likely add a limited number of jobs, but no staffing figures were found.
Where it stands
County records show the plan was filed for review on 2024-12-17 and give no later decision. In Pennsylvania, the township planning commission and then the supervisors usually review a plan like this, followed by permits and construction if it is approved.
- Dec 17, 2024 Plan filed for county review
Planning terms explained
- Land development plan
- A formal plan showing a proposed building, parking, utilities and drainage on a piece of land, which the township reviews before work can start.
- Stormwater management area
- A basin or similar feature that collects rain runoff from roofs and pavement and releases it slowly to limit flooding and pollution.
- Non-residential square footage
- The floor area of buildings used for something other than housing, such as offices.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 4, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: Township planning commission and supervisors' meetings usually take public comment on land development plans, and agendas are posted on the Dickinson Township website, but no meeting item for this project was found.
In Pennsylvania, Dickinson Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Dickinson Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Dickinson Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Dickinson Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $1.5M
- ~16 roofing squares (assumes 3 stories)
- ~12 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- 445 Allen Road - Dennison Court0.4 mi · 3,600 sq ft non-residential, industrial · South Middleton Township · filed 2025-05-01
- Carlisle Steel Outdoor Storage0.5 mi · 1,500 sq ft non-residential, industrial · South Middleton Township · filed 2026-11-20
- Sheetz Store #263 Rebuild0.9 mi · 6,872 sq ft non-residential, retail & commercial · Carlisle Borough · filed 2026-04-14
- WellSpan Carlisle1.0 mi · 47,096 sq ft non-residential, institutional · South Middleton Township · filed 2024-01-23
- Lot-line revision, West Pennsboro Township1.1 mi · lot line change · West Pennsboro Township · filed 2025-05-05
- The Learning Experience1.4 mi · 10,000 sq ft non-residential, school · South Middleton Township · filed 2026-09-01