Cumberland County · West Pennsboro Township · #2974 · Solar farms tracker

Mountain Melody Solar

West Pennsboro Township, PA · other

In short: Mountain Melody Solar is a development project in West Pennsboro Township, Cumberland County, PA. As of November 24, 2026, it is approved according to web research. Latest record: A summary of the township board meeting reports that the supervisors approved the preliminary/final land development plan for Mountain Melody Solar in March… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved A summary of the township board meeting reports that the supervisors approved the preliminary/final land development plan for Mountain Melody Solar in March 2025, with park-fee conditions. · web research checked Nov 5, 2026 · source AI research
  1. Proposed
  2. In reviewFeb 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

An approximately 3 MW ground-mounted solar energy system on a 91.36-acre parcel in West Pennsboro Township, with solar arrays, access roads and site improvements.

Official description: This project proposes the installation of a +/- 3MW ground mounted principal solar energy system across 1 parcel that is comprised of a total of 91.36 acres. This project includes the construction of an SES (Solar Energy System) with associated solar arrays, access roads, and other necessary improvements to the site.

Plan type
Preliminary/final land development plan: county review report

Project history

  • 2025-02-06 · #2974 · Preliminary/final land development plan: county review report

County review letter →

County plan review office →

The full picture AI research · Nov 5, 2026

Mountain Melody Solar is a roughly 3-megawatt solar farm planned on a 91-acre parcel in West Pennsboro Township, near Newville. It would have rows of ground-mounted solar panels, access roads and related site work. Power would feed the electric grid.

A local-government summary reports that the township supervisors approved the combined preliminary and final land development plan in March 2025. They required about $58,000 in park and recreation fees. The same summary says the panels would cover about 28 acres, and the developer plans to return the land to farmland when the panels are retired.

No source was found showing construction, permits or operation. The county record stops at the February 2025 filing, which is earlier than the township approval.

What it could mean nearby

Where it stands

A township-level summary reports that the supervisors approved the plan in March 2025, so the project is past the review stage shown in county records. Next steps usually include state stormwater and other permits, then construction and connection to the grid. No source confirming these was found.

Around the web

Planning terms explained
Land development plan
A detailed site plan that a township reviews before major construction, covering layout, access, drainage and fees.
Preliminary/final approval
A single vote that grants both the first-stage and last-stage plan approvals together.
Park and recreation fees
A payment a developer makes to the township to support parks, in place of or in addition to setting land aside.
Ground-mounted solar
Solar panels on frames anchored in the ground, rather than on rooftops.
Megawatt (MW)
A unit of power; 3 MW is enough to supply roughly several hundred homes, depending on conditions.

Researched by AI from public sources on Nov 5, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The West Pennsboro Township supervisors decided the land development plan; residents can raise concerns at their public meetings or by contacting the township office, which lists agendas and minutes on its website.

In Pennsylvania, West Pennsboro Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find West Pennsboro Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.