Cumberland County · Dickinson Township · #3074
Peach Glen Agricultural Project
Dickinson Township, PA · 41,690 sq ft non-residential, agricultural
In short: Peach Glen Agricultural Project is an agricultural project in Dickinson Township, Cumberland County, PA. It would add 41,690 sq ft of non-residential space. Its estimated construction value is about $8.3M, a rough estimate from its size. As of November 24, 2026, it is approved. Latest record: Board of Supervisors: final plan, approved (May 6, 2026). What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
A new agricultural building, the demolition and replacement of an existing agricultural building, and new gravel and concrete access drives in Dickinson Township. Stormwater will be handled by infiltration and detention basins on site, and the project totals about 41,690 square feet.
Official description: The project involves the construction of a new agricultural building, the demolition and replacement of an agricultural building, and gravel/concrete access drives. Stormwater will be managed onsite via infiltration/detention basins.
- Plan type
- Preliminary/final land development plan: county review report
Project history
- 2026-05-06 · Board of Supervisors · Final plan · Approved · source
- 2026-05-06 · Board of Supervisors · Financial security · Approved · source
- 2026-04-08 · Planning Commission · Land development plan · Recommended approval · source
- 2025-11-12 · Planning Commission · Final plan · source
- 2025-09-03 · #3074 · Preliminary/final land development plan: county review report · 41,690 sq ft
The full picture AI research · Nov 8, 2026
Wagner Family Farms is proposing to replace old farm buildings on a property off Georgetown Road in Dickinson Township. The plan, called Peach Glen Agricultural Project, tears down older poultry and hog barns. It then builds a new barn for about 40,000 egg-laying hens on the north side and a rebuilt hog barn on the south side. It also adds gravel and concrete drives and stormwater basins that soak up and hold back rain runoff. The new buildings total about 41,690 square feet.
A meeting-summary site reports the township supervisors unanimously approved the land development plan and some waivers on May 6, 2026. The township's own approved agenda for that date lists the project's final land development plan and its financial security estimate. The agenda does not show the vote. No news coverage, opposition, builder page, permit or construction record was found online.
What it could mean nearby
- A 40,000-hen barn and a hog barn could bring odor and truck traffic for nearby neighbors. The records do not say how much.
- New gravel and concrete drives will change how vehicles enter and leave the farm.
- Infiltration and detention basins are planned to manage rain runoff on site.
- The county records show no new homes.
Where it stands
The supervisors reportedly approved the final land development plan on May 6, 2026, according to a meeting-summary site. The township's agenda confirms the item was scheduled but not the vote. Next come the financial security for site work, stormwater and other permits, and then construction. Note: The county records stop at 'in review' (2025-09-03), but a meeting-summary site and the township's May 2026 agenda show the plan reached the supervisors for final action, reportedly approval, on May 6, 2026.
- May 6, 2026 Supervisors' agenda lists the final land development plan and financial security estimate; a meeting-summary site reports unanimous approval with waivers
- Apr 8, 2026 Township planning commission agenda lists the land development plan under new business
- Sep 3, 2025 County review report filed on the preliminary/final land development plan
Who's behind it
Wagner Family Farms · The applicant and owner named in a meeting summary. No company website or other projects were found.
Around the web
- 5/6/2026 BOS Approved AgendaDickinson Township · May 6, 2026Lists the Peach Glen Agriculture Project final land development plan and financial security estimate under plan review/conditional use hearings. The agenda text was read only through search-result snippets, because the PDF could not be read directly.
- Agenda 4/8/26Dickinson Township · Apr 8, 2026Planning commission agenda lists the Peach Glen Agriculture Project land development plan under new business. The agenda text was read only through search-result snippets.
- Township approves Wagner Family Farms Peach Glen plan including 40,000-layer hen barn and stormwater controlsCitizen PortalMeeting summary that, per the fact-check, reports unanimous approval of the plan and waivers, names the applicant and shows the 40,000-hen barn and rebuilt hog barn. The page could not be opened directly, so it was not independently read.
Planning terms explained
- Land development plan
- A detailed site plan the township reviews and approves before major new building or site work can start.
- Waiver
- Permission to skip or modify a specific township design rule for a project.
- Financial security
- Money or a guarantee the owner posts to make sure the approved site work gets finished.
- Infiltration basin
- A shallow basin that lets rain runoff soak into the ground.
- Detention basin
- A basin that holds stormwater temporarily and releases it slowly.
Researched by AI from public sources on Nov 8, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Dickinson Township Board of Supervisors decides land development matters at its public meetings, and the township office can say whether any further hearings or permit steps remain.
In Pennsylvania, Dickinson Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Dickinson Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Dickinson Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Dickinson Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $8.3M
- ~416 roofing squares (assumes 1 story)
- ~104 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Lot additions on 3.9-acre tract, Dickinson Twp0.6 mi · lot line change · Dickinson Township · filed 2025-07-24
- 120 Peach Glen Road0.8 mi · subdivision (use not stated) · Dickinson Township · filed 2025-12-16
- Lot reconfiguration in Dickinson Township1.0 mi · lot line change · Dickinson Township · filed 2026-07-27
- 8-lot single-family subdivision in Dickinson Township1.0 mi · 8 homes, single-family homes · Dickinson Township · filed 2026-10-20
- Lot addition in Dickinson Township1.5 mi · lot line change · Dickinson Township · filed 2025-10-08
- Lot addition of ~2 acres to residential lotsame area · lot line change · Huntington Township · filed 2024-02-21