Cumberland County · Upper Frankford Township · #3111
Poultry operation in Upper Frankford Township
Upper Frankford Township, PA · 36,524 sq ft non-residential, agricultural
In short: Poultry operation in Upper Frankford Township is an agricultural project in Upper Frankford Township, Cumberland County, PA. It would add 36,524 sq ft of non-residential space. Its estimated construction value is about $7.3M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Preliminary/final land development plan: county review report filed for county review (November 17, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
A new poultry operation in Upper Frankford Township with a 76 by 406 ft poultry barn, manure storage, an egg room, a gravel driveway and pads, and stormwater controls. The project totals about 36,524 sq ft.
Official description: New poultry operation inclusive of one poultry barn (76'x406'), manure storage (30'x60'), egg room (60'x60'), gravel driveway and pads, and associated stormwater management controls.
- Plan type
- Preliminary/final land development plan: county review report
Project history
- 2025-11-17 · #3111 · Preliminary/final land development plan: county review report · 36,524 sq ft
The full picture AI research · Nov 5, 2026
A new poultry (egg) operation is proposed in Upper Frankford Township, a rural area in northern Cumberland County. County records describe one poultry barn measuring 76 by 406 feet, plus manure storage, an egg room, a gravel driveway and pads, and stormwater controls. In total the project covers about 36,524 square feet of buildings and paved areas.
The plan was filed for county review on 2025-11-17. No developer website, news coverage, township meeting item, hearing notice, listing or state permit page could be tied to this project. No evidence was found that construction has started or finished, so the county record is the only source on its status.
Agricultural projects like this usually need a plan review for local rules and a stormwater and manure-handling review before building begins.
What it could mean nearby
- Truck traffic for feed delivery, egg pickup and manure hauling would likely use the new gravel driveway, but no traffic study was found.
- Manure storage and stormwater controls are part of the plan, so runoff and odor management are likely points of local interest.
- The number of jobs, birds and any buyer of the eggs are not stated in the records found.
Where it stands
The county shows the plan as filed for review on 2025-11-17. Usual next steps are review comments from the county and township, any required stormwater or manure-management approvals, then permits before construction.
- Nov 17, 2025 Plan filed for county review
Planning terms explained
- Land development plan
- A formal site plan showing new buildings, driveways and utilities that the township and county review before building.
- Stormwater controls
- Features such as basins or swales that slow and clean rainwater running off roofs and paved areas.
- Manure storage
- A structure or pad that holds poultry waste until it can be used as fertilizer or hauled away.
- NPDES permit
- A state-administered permit covering stormwater runoff from construction sites, and for larger animal operations, wastewater and manure.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 5, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: Residents can contact the Upper Frankford Township supervisors and planning commission, which handle local review of land development plans, and ask about meeting dates and comment opportunities.
In Pennsylvania, Upper Frankford Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Upper Frankford Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Upper Frankford Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Upper Frankford Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $7.3M
- ~365 roofing squares (assumes 1 story)
- ~91 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Residential lot subdivision, Upper Frankford Twp0.1 mi · lot line change · Upper Frankford Township · filed 2025-06-23
- Newville Dollar General0.4 mi · 10,640 sq ft non-residential, retail & commercial · Upper Frankford Township · filed 2024-03-28
- Lot line change, Upper Frankford Township0.4 mi · lot line change · Upper Frankford Township · filed 2025-03-05
- 4220 & 4277 Enola Road0.4 mi · lot line change · Upper Frankford Township · filed 2025-07-30
- Poultry operation, Upper Frankford Township0.9 mi · 58,464 sq ft non-residential, agricultural · Upper Frankford Township · filed 2025-05-30
- Lot-line subdivision in Upper Frankford Township1.4 mi · lot line change · Upper Frankford Township · filed 2024-09-23