Cumberland County · Mount Holly Springs Borough · #3137
Pole building for vehicle and equipment storage
Mount Holly Springs Borough, PA · 1,944 sq ft non-residential, warehouse & storage
In short: Pole building for vehicle and equipment storage is a warehouse and storage development in Mount Holly Springs Borough, Cumberland County, PA. It would add 1,944 sq ft of non-residential space. Its estimated construction value is about $253K, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Preliminary/final land development plan: county review report filed for county review (December 17, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
A 1,944 sq ft pole building in Mount Holly Springs Borough for storing four work vehicles and sign-assembly equipment.
Official description: The purpose of this plan is to obtain approval for the construction of a pole building, which will be used for the storage of four work vehicles and sign assembly equipment.
- Plan type
- Preliminary/final land development plan: county review report
Project history
- 2025-12-17 · #3137 · Preliminary/final land development plan: county review report · 1,944 sq ft
The full picture AI research · Nov 5, 2026
A 1,944-square-foot pole building is proposed in Mount Holly Springs Borough, Cumberland County. A pole building is a simple, open-span structure on posts. County records say it would store four work vehicles and sign-assembly equipment.
The county shows a plan filed for review on December 17, 2025. No developer website, news story, meeting item, listing or business page was found that clearly concerns this site. The current condition of the site, and whether work has started, could not be confirmed online.
The building is small, similar to a large garage. Proposals like this are usually reviewed for stormwater runoff, setbacks and driveway access.
What it could mean nearby
- The records give no traffic figures. Four work vehicles suggest only light, occasional trips.
- The records do not mention new homes, jobs, schools or utility changes.
Where it stands
County records show the plan filed for review on 2025-12-17, and no later action was found online. Next steps are usually comments from the county and borough, then a borough decision and a building or zoning permit.
- Dec 17, 2025 Plan filed for county review
Around the web
- Planning CommissionMount Holly Springs BoroughShows that the borough Planning Commission advises Borough Council on local planning matters; it lists no item for this project.
Planning terms explained
- Pole building
- A simple building whose roof and walls are supported by large posts set in the ground.
- Land development plan
- A site plan showing a proposed building, parking, drainage and access, which the borough reviews before approval.
- Stormwater
- Rain runoff from roofs and paved areas, which new construction must manage.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 5, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Mount Holly Springs Borough Council and Planning Commission handle local plan and zoning matters, and residents can comment at their public meetings, whose agendas are posted on the borough website.
In Pennsylvania, Mount Holly Springs Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Mount Holly Springs Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Mount Holly Springs Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Mount Holly Springs Borough's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $253K
- ~19 roofing squares (assumes 1 story)
- ~4 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Mount Tabor AME Church lot line adjustment0.7 mi · lot line change · South Middleton Township · filed 2024-04-24
- 3 & 5 Teejay Drive0.8 mi · lot line change · South Middleton Township · filed 2026-02-20
- 433 Zion Road1.1 mi · office · South Middleton Township · filed 2025-06-05
- Lot addition, South Middleton Township1.3 mi · lot line change · South Middleton Township · filed 2024-05-24
- Vitro Architectural Glass Float Line 1 expansion1.3 mi · 9,000 sq ft non-residential, industrial · South Middleton Township · filed 2024-12-30
- Lot line adjustment on Sandbank Road1.4 mi · lot line change · Dickinson Township · filed 2024-03-19