PlannedNearby

Cumberland County · Monroe Township · #3158

Meadows of Ashcombe

Monroe Township, PA · 98 homes, single-family homes

In short: Meadows of Ashcombe is a single-family home development in Monroe Township, Cumberland County, PA. It would add 98 homes. Its estimated construction value is about $54.9M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Preliminary subdivision plan: county review report filed for county review (February 9, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

In review Preliminary subdivision plan: county review report filed for county review · Feb 9, 2026 · source
  1. Proposed
  2. In reviewFeb 2026
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: a planning commission recommendation, then a vote by the town's governing body.

About this project

A 98-lot single-family detached community on 117.4 acres in Monroe Township, built in three phases with 3 open space lots and public water and sewer.

Official description: The Meadows of Ashcombe is a proposed a single family detached residential community following the Township’s Open Space Development Standards (minimum 45% open space). The subject property is 117.4 acres and is located within the Suburban Residential Zoning District (R1). The project is proposed in the three phases with a total of 98 single-family detached dwelling lots and 3 open space lots proposed. Public sanitary sewer and water shall serve the project. A fee in-lieu-of land dedication is proposed to satisfy Township recreation requirements.

Plan type
Preliminary subdivision plan: county review report

Project history

  • 2026-02-09 · #3158 · Preliminary subdivision plan: county review report · 98 lots/units

County review letter →

County plan review office →

The full picture AI research · Nov 8, 2026

Meadows of Ashcombe is a proposed neighborhood of 98 detached single-family homes on about 117 acres in Monroe Township, Cumberland County. It would be built in three phases. The plan includes 3 open space lots and would connect to public water and sewer.

The county's plan-review page lists two filings. A county review report on the overall preliminary plan is dated 2026-02-09. A second report, dated 2026-10-09, covers a final plan for Phase 1 only. A final plan comes after the preliminary plan, so the project has moved forward since February.

No developer website, home listings, news coverage of construction, or township meeting records were found. Nothing online shows work on the ground. An older Cumberlink article about a tabled plan for a similarly named development appears to date from around 2022. Its paywall blocked reading it, so it can't be tied to the 2026 filings.

What it could mean nearby

Where it stands

The county has filed review reports on both the preliminary plan (2026-02-09) and a Phase 1 final plan (2026-10-09), so formal review is still under way. The Phase 1 final plan must be approved by the township and recorded before building permits and construction usually begin.

Around the web

Planning terms explained
Preliminary subdivision plan
The first detailed plan for dividing land into lots, reviewed before a final plan is approved.
Final subdivision plan
The last plan version, which must be approved and recorded before lots can be sold or built on.
County review report
Comments from the county planning staff on a plan. The township makes the decision.
Open space lot
Land set aside in a development and not used for homes.
Phase
One stage of a project that is built in sections.

Researched by AI from public sources on Nov 8, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Monroe Township supervisors decide on subdivision plans after the township planning commission reviews them. Residents can comment at those public meetings, and the township office can confirm the dates.

In Pennsylvania, Monroe Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Monroe Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

From the filings read by AI

Estimated construction value: $54.9M

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →