# Foust Machine and Tool

Hampden Township, PA · 3,600 sq ft non-residential, industrial

In short: **Foust Machine and Tool** is an industrial development in Hampden Township, Cumberland County, PA. It would add 3,600 sq ft of non-residential space. Its estimated construction value is about $468K, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Board of Commissioners: plan discussion (July 2, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Board of Commissioners: plan discussion · Jul 2, 2026 · [source](https://www.hampdentownship.us/Government/board%20of%20commissioners/July%202%20BOC%20agenda.pdf?t=202607011645450)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Land development approval is sought for a 60-by-60-foot addition, about 3,600 sq ft, to the existing machine shop in Hampden Township.

Official description: The intent of this plan is to get land development approval to construct a 60'x60' addition to the existing machine shop

- **Plan type:** Plan: county review report

## Project history

- **2026-07-02** · Board of Commissioners · Plan discussion · [source](https://www.hampdentownship.us/Government/board%20of%20commissioners/July%202%20BOC%20agenda.pdf?t=202607011645450)
- **2026-06-11** · Planning Commission · Preliminary/final plan · [source](https://www.hampdentownship.us/Government/planning%20commission/2026/Agenda/June%2011,%202026%20Planning%20Commission%20Meeting.pdf?t=202606050817370)
- **2026-05-14** · #3187 · Plan: county review report · 3,600 sq ft

[County review letter →](https://www.cumberlandcountypa.gov/DocumentCenter/View/55326/Foust-Machine-and-Tool-Review-Report-PF-LD-2026-05-14)

[County plan review office →](https://www.cumberlandcountypa.gov/5139/Subdivision-Land-Development-Activity-Ma)

## The full picture AI research · Nov 5, 2026

Foust Machine and Tool, an existing machine shop in Hampden Township, Cumberland County, wants to build an addition. The addition would measure 60 by 60 feet, which is about 3,600 square feet. That is roughly the footprint of a large two-car garage, doubled.

The township is being asked for land development approval. That is the formal review a municipality does when a site's buildings or paving change in a significant way. The shop is already in operation, so the addition would enlarge an existing industrial use. It would not create a new one.

No news coverage, township agenda or minutes, developer web page, listing or permit record about this project was found. Nothing found shows opposition, a hearing, or work on the ground. The description here rests on the county record alone.

### What it could mean nearby

- The addition is small, so any change in traffic or noise would probably be modest. No traffic study or neighbor comments were found.
- The shop could add floor space for equipment or work. No jobs figure or tenant announcement was found.
- Stormwater runoff and the amount of paved area are usually checked during land development review. No details were found.

### Where it stands

The county's last record, dated 2026-05-14, shows the plan was filed and is in review. Next steps usually are review comments from the township and county, possible revisions, a decision by the township supervisors, and then building permits. No later records were found.

- **May 14, 2026** Plan for the 60-by-60-foot addition filed for county review

### Who's behind it

Foust Machine and Tool

Planning terms explained

- **Land development:** A formal township review required when a property gets a new building, an addition or major site changes.
- **Addition:** New floor area attached to an existing building.
- **Industrial use:** Land or buildings used for making, repairing or processing goods, such as a machine shop.
- **Stormwater:** Rain and melted snow that runs off roofs and paved areas and must be managed so it does not flood neighbors.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 5, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Hampden Township's planning commission and board of commissioners usually review land development plans at public meetings. Residents can ask the township office for the meeting dates and comment there, but no specific hearing was found.

In Pennsylvania, Hampden Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Hampden Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Hampden Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Hampden Township's meeting agendas →](https://www.google.com/search?q=Hampden+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$468K**

- ~36 roofing squares (assumes 1 story)
- ~9 tons of cooling (rule of thumb 400 sq ft/ton)

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Salem Meadows Townhomes](https://plannednearby.com/x/cumberland-2915) — 0.7 mi · 40 homes, townhomes · Hampden Township · filed 2024-09-13
- [Lehman Volvo](https://plannednearby.com/x/cumberland-2929) — 0.9 mi · 3,500 sq ft non-residential, retail & commercial · Hampden Township · filed 2024-10-30
- [7 Brew Beltway Commons Development Plan](https://plannednearby.com/x/cumberland-7-brew-beltway-commons-development-plan) — 1.2 mi · 787 sq ft non-residential, restaurant · Hampden Township · filed 2026-11-17
- [Walmart Store 1886 pickup expansion](https://plannednearby.com/x/cumberland-walmart-store-1886-pickup-expansion) — 1.4 mi · 3,567 sq ft non-residential, retail & commercial · Silver Spring Township · filed 2024-08-26
- [Wesley United Methodist Church subdivision](https://plannednearby.com/x/cumberland-wesley-united-methodist-church) — 1.5 mi · lot line change · Mechanicsburg Borough · filed 2025-07-15
- [The Residences on Trindle](https://plannednearby.com/x/cumberland-the-residences-on-trindle) — 1.5 mi · 61 homes, apartments · Hampden Township · filed 2024-08-16

[See everything nearby on a map →](https://plannednearby.com/near#40.23425,-77.00461,Hampden%20Township)

---

Source page: https://plannednearby.com/x/cumberland-3187

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.