Cumberland County · Hampden Township · #3097
5117 E. Trindle Road
Hampden Township, PA · 20,000 sq ft non-residential, retail & commercial
About this project
A land development for a new 20,000 sq ft commercial building, with parking, stormwater areas, utilities and landscaping, in Hampden Township.
Official description: This land development plan is for the proposed construction of a commercial building and the associated site features such as parking, stormwater management areas, utilities and landscaping.
The full picture AI research · Nov 1, 2026
A land development plan has been filed with Cumberland County for a new commercial building of about 20,000 square feet at 5117 E. Trindle Road in Hampden Township. The plan also includes parking, stormwater areas, utility connections and landscaping.
The county record does not say who will occupy the building or what kind of business it will be. It also does not describe what is on the site now. No news coverage, township meeting documents, hearing notices or developer pages were found that are clearly about this site. Nothing was found on opposition or approvals.
A land development plan is the formal package a township reviews to confirm that a new building meets local rules for layout, access, drainage and utilities before construction can start.
What it could mean nearby
- Traffic and access: a 20,000 sq ft commercial building would likely add vehicle trips on E. Trindle Road, a busy route. The township's review usually covers driveway placement and access, but no traffic details were found.
- Stormwater: the plan includes stormwater areas, which are meant to manage rain runoff from the new roof and paved surfaces.
- Utilities and landscaping: the plan includes utility connections and landscaping, which usually means public utilities will serve the site and plantings will be added.
Where it stands
A land development filing was recorded with the county on 2025-10-21. Township planning review usually comes next. Typically that means the planning commission reviews the plan, then the elected supervisors vote on approval, and construction permits follow. No township decisions were found online.
- Oct 21, 2025 Latest county filing for the land development
Want to weigh in? Hampden Township's planning commission and board of commissioners normally review land development plans at public meetings. Residents can usually comment there, and the township office can confirm the meeting dates and agendas.
Planning terms explained
- Land development
- A formal plan for building on a site, which the township reviews for layout, parking, drainage and utilities.
- Stormwater
- Rain and melted snow that runs off roofs and paved areas and must be collected and managed so it does not flood neighbors.
- Planning commission
- A local advisory board that reviews development plans and recommends action to the elected governing body.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $4.0M
- ~200 roofing squares (assumes 1 story)
- ~50 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →