Cumberland County · Silver Spring Township · #2935
HJ Towing and Recovery, Inc.
Silver Spring Township, PA · 17,800 sq ft non-residential, industrial
About this project
A new 17,800 sq ft building and parking lot are planned at the company's existing Silver Spring Township facility, along with a stormwater system. About 6 acres will be disturbed.
Official description: Construction of a new 17,800 sq. ft. building along with the associated parking lot at their existing facility located in Silver Spring Township, Cumberland County. A stormwater management system, which includes an infiltration basin, underground conveyance piping for the roof drains, and two (2) vegetated collection channels will also be constructed on site. Total construction associated with this project will disturb approximately six (6) acres.
The full picture AI research · Nov 1, 2026
HJ Towing and Recovery, Inc. plans to add a new 17,800-square-foot building at its existing facility in Silver Spring Township, Cumberland County. That is roughly the size of several large houses combined. The plan also includes a new parking lot and a stormwater system. Stormwater systems collect and slow rainwater runoff from paved and roofed areas.
About 6 acres of ground will be disturbed during construction. The company already operates on the site, so this appears to be an expansion of an existing business and not a new use of vacant land.
No news coverage, township meeting records, or company pages specific to this project were found online. Details such as how the building will be used, the exact location, and the approval status could not be confirmed beyond the county filing from November 2024.
What it could mean nearby
- Construction on about 6 acres could mean temporary noise, dust and truck traffic near the site.
- A new parking lot and building add paved surface, which is why a stormwater system is included to manage runoff.
- Because this expands an existing facility, the county records do not suggest new homes or schools would be affected.
Where it stands
The county record shows a filing dated November 4, 2024, but no approval or decision was found online. Projects like this usually go through township planning review and stormwater and erosion-control approval before construction starts.
- Nov 4, 2024 Latest filing recorded in county planning records
Want to weigh in? Land development plans are typically reviewed by the Silver Spring Township planning commission and board of supervisors, whose public meetings accept comment; check the township's website for current agendas.
Who's behind it
HJ Towing and Recovery, Inc. · A towing and recovery company that operates an existing facility in Silver Spring Township, Cumberland County.
Planning terms explained
- Land development
- A formal township review of plans to build new buildings or parking areas on a property.
- Stormwater system
- Basins, pipes or other features that collect rainwater from roofs and pavement and release it slowly.
- Disturbed acres
- The area of ground that will be dug up, graded or otherwise altered during construction.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.3M
- ~178 roofing squares (assumes 1 story)
- ~44 tons of cooling (rule of thumb 400 sq ft/ton)