Cumberland County · North Middleton Township · #3228
Lehman's Landing - Phase 3
North Middleton Township, PA · 57 homes, townhomes
About this project
A land development plan for 57 townhomes with private access drives, parking and stormwater facilities in North Middleton Township. The design follows the previously approved preliminary plan for Lehman's Crossing.
Official description: Land Development Plan for the construction of 57 townhomes along with associated privately owned access drives, parking areas and stormwater facilities. Design is consistent with the previously reviewed and approved Preliminary Plan for "Lehman's Crossing"
Filing history
- 2026-09-01 · #3228 · Submission · 57 lots/units
The full picture AI research · Nov 2, 2026
County records describe a land development plan for 57 townhomes in North Middleton Township, near Carlisle. The plan is Phase 3 of Lehman's Landing. It includes private access drives, parking areas and stormwater facilities, which are basins and pipes that manage rainwater runoff. The county summary says the design follows a preliminary plan that was approved earlier for Lehman's Crossing.
Earlier phases of Lehman's Landing are already being built and sold. Ryan Homes markets three-bedroom townhomes with one-car garages there, on Debra Lane about 2 miles from downtown Carlisle. The sales page does not mention phases or say how many homes the full community will have. No news coverage, meeting minutes or opposition to Phase 3 were found. Ryan Homes has not been confirmed as the Phase 3 builder.
What it could mean nearby
- Adds 57 more homes to an existing townhome neighborhood, so more households will use the same local roads.
- Private access drives mean the community, not the township, would normally maintain the internal streets.
- Stormwater facilities are part of the plan to manage runoff from new pavement and roofs.
- Townhomes advertised in the community start at roughly $230,000 to $275,000, which adds to the area's lower-priced housing.
Where it stands
A land development plan was filed with the county, with the latest filing on 2026-09-01. Plans like this are usually reviewed by the township and county planners and then voted on by the township supervisors. Construction permits follow once the plan is approved.
- Sep 1, 2026 Latest county filing for the Phase 3 land development plan
Want to weigh in? The North Middleton Township Planning Commission and Board of Supervisors would normally review the plan at public meetings, and residents can comment there or through the township office.
Who's behind it
Ryan Homes (marketing the existing Lehmans Landing townhomes; its role in Phase 3 is unconfirmed) · Ryan Homes is a national homebuilder that sells townhomes and single-family homes in many regions.
Around the web
- Lehmans LandingRyan HomesShows the existing Lehmans Landing townhome community on Debra Lane near Carlisle, which is open and selling, with no mention of phases.
Planning terms explained
- Land development plan
- A detailed site plan showing buildings, drives, parking and utilities that a municipality must approve before construction.
- Preliminary plan
- An earlier approval stage that sets the overall layout before the final detailed plan is approved.
- Stormwater facilities
- Basins, pipes and similar features that collect and slow rainwater runoff from a site.
- Private access drives
- Internal roads owned and maintained by the community rather than the public.
Researched by AI from public sources on Nov 2, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $21.1M
- ~798 roofing squares
- ~57 HVAC systems
- ~57 kitchens / 114+ bathrooms
- ~114,000 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →