Cumberland County · Lower Allen Township · #3202
Liberty Forge Final Phase 1
Lower Allen Township, PA · 53 homes, subdivision (use not stated)
About this project
Final Phase 1 of Liberty Forge, splitting the site into two lots separated by Lisburn Road, with 53 units planned on Lot 2 in Lower Allen Township.
Official description: For the subdivision of for the Liberty Forge into Lot 1 and Lot 2 being separated by Lisburn Road and for the development of 53 units on Lot 2.
Filing history
- 2026-06-22 · #3202 · Submission · 53 lots/units
The full picture AI research · Nov 1, 2026
Liberty Forge Final Phase 1 is a subdivision plan that splits the site into two lots. Lisburn Road runs between them. County records show 53 homes planned on Lot 2. The records do not say what type of homes they will be.
The name matches the Liberty Forge golf property, which is in Lower Allen Township and extends into neighboring Upper Allen Township. A secondary news summary reports a housing plan was submitted to the county planning office for that golf course. It gave no unit count or developer, and the county filing could not be tied to it with certainty. A trade-press article reports that the township rejected a zoning change for condominiums on the same property years earlier.
No township agenda, minutes or developer page about this phase was found.
What it could mean nearby
- Lot 2 is across Lisburn Road from Lot 1, so road access and crossings are likely to be reviewed.
- 53 new homes would add traffic and demand for utilities and school capacity, but no studies were found.
- If the golf course land is being converted, open space and recreation use could change.
Where it stands
The county received a final-plan filing on 2026-06-22. Final plans are normally reviewed by the county planners and then the township, and approval usually comes before building permits are issued. No approval or decision was found online.
- Jun 22, 2026 Latest county filing for Final Phase 1
Want to weigh in? The Lower Allen Township governing board normally decides on final subdivision plans, and residents can usually comment at its public meetings.
Around the web
- Lower Allen Twp. denies Liberty Forge developmentCentral Penn Business JournalReports an earlier rejection of a zoning change for condominiums at the Liberty Forge golf property.
Planning terms explained
- Subdivision
- Dividing land into separate lots so each can be built on or sold.
- Final plan
- The last detailed plan a municipality approves before construction can proceed.
- Lot
- A defined parcel of land created by a subdivision plan.
- Zoning change
- An amendment to local rules about what can be built on land.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $29.7M
- ~1,696 roofing squares
- ~53 HVAC systems
- ~53 kitchens / 106+ bathrooms
- ~148,400 sq ft of finished living space