PlannedNearby

Cumberland County · Dickinson Township · #3074

Peach Glen Agricultural Project

Dickinson Township, PA · 41,690 sq ft non-residential, agricultural

About this project

A new agricultural building, the demolition and replacement of an existing agricultural building, and new gravel and concrete access drives in Dickinson Township. Stormwater will be handled by infiltration and detention basins on site, and the project totals about 41,690 square feet.

Official description: The project involves the construction of a new agricultural building, the demolition and replacement of an agricultural building, and gravel/concrete access drives. Stormwater will be managed onsite via infiltration/detention basins.

Filing history

  • 2025-09-03 · #3074 · Submission · 41,690 sq ft

State agencies' comment letter (PDF) →

County plan review office →

The full picture AI research · Nov 1, 2026

The Peach Glen Agricultural Project would put up a new agricultural building and tear down an existing farm building to replace it. Together the work totals about 41,690 square feet of non-residential space. The plan also includes new gravel and concrete driveways to serve the buildings. The site is in Dickinson Township, Cumberland County.

Rain runoff would be handled on site. The plan calls for infiltration basins, which let water soak into the ground, and detention basins, which hold water and release it slowly.

The county records do not say who will use the buildings. A search found a Dickinson Township Planning Commission agenda dated April 8, 2026. It lists a "Peach Glen Agriculture Project Land Development Plan" under new business. The agenda is only a list of topics. No minutes, news coverage, opposition or approval decision turned up.

What it could mean nearby

Where it stands

The county's latest filing is dated 2025-09-03. The township Planning Commission had the land development plan on an April 2026 agenda. No approval decision was found online. Typically the Planning Commission reviews the plan and advises, then the township supervisors vote on approval, and permits follow.

Want to weigh in? The Dickinson Township Planning Commission reviews the plan, and the township supervisors decide. Residents can comment at their public meetings, and agendas are posted on the township website.

Around the web

Planning terms explained
Land development plan
A detailed plan showing new buildings, driveways and utilities that the township reviews before construction.
Infiltration basin
A shallow, planted or gravel area that lets stormwater soak into the ground.
Detention basin
A basin that temporarily holds stormwater and releases it slowly to prevent flooding downstream.
Planning Commission
An appointed township board that reviews development plans and advises the elected supervisors.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $8.3M