Poultry barn and egg room in Penn Township

Penn Township, PA · 63,700 sq ft non-residential, agricultural

About this project

A proposed 100' x 600' poultry barn and a 60' x 60' egg room, with driveways, turnarounds, and stormwater controls including a bio-retention basin and a sediment basin.

Official description: Ron Tritt proposes one 100'x600' poultry barn and one 60'x60' egg room along with associated driveways and turnaround areas. Stormwater Controls include conveyance swales, one Bio retention basin and a sediment basin.

Filing history

  • 2025-10-06 · #3090 · Submission · 63,700 sq ft

State agencies' comment letter (PDF) →

County plan review office →

The full picture AI research · Nov 1, 2026

A farm in Penn Township, Cumberland County, has filed plans for a large poultry barn, about 100 feet wide and 600 feet long, plus a separate 60-by-60-foot egg room. Together the buildings add roughly 63,700 square feet. The egg room is where eggs would be handled and stored.

The plans also show driveways, turnaround areas for trucks, and stormwater controls. Those include a bio-retention basin and a sediment basin, which hold and filter rain runoff so it does not wash soil or pollutants onto neighboring land.

No news coverage, township agenda, hearing notice, developer website or state permit specific to this project was found. The county's records did not say who the operator is, what the land is used for now, or how many birds the barn would hold.

What it could mean nearby

Where it stands

The county filing dated 2025-10-06 is the latest record found. Land development plans like this are usually reviewed by the county planning office, which only advises, then by the township, which decides on approval. Stormwater and erosion-control permits are usually handled separately.

Want to weigh in? The Penn Township supervisors and planning commission would normally decide on the plan, and residents can usually comment at their public meetings. The township office can confirm meeting dates.

Planning terms explained
Land development
A formal township review of a plan to build new buildings or large structures on a property.
Bio-retention basin
A shallow, planted basin that collects rain runoff and lets it soak in and be filtered.
Sediment basin
A temporary pond that catches soil washed off during construction so it does not reach streams or neighbors.
Egg room
A building or room where eggs from the barn are collected, washed, sorted and stored.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $12.7M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →