Cumberland County · Shippensburg Township · #2866
Shippensburg Townhomes
Shippensburg Township, PA · 26 homes, townhomes
About this project
A subdivision and land development plan proposes 26 single-family attached townhome units in four buildings on an existing residential lot in Shippensburg Township, Cumberland County, with 58 parking spaces.
Official description: The purpose of this Subdivision & Land Development Project is to develop and construct four townhomes totaling 26 units (Single Family Attached) on the existing residential lot (Single Family Detached). Stormwater management is being provided for the 2 thru 100 year/24 hour runoff. 58 total parking spaces are being provided with 6 of those being reserved for guest parking.
Filing history
- 2024-06-10 · #2866 · Submission · 26 lots/units
The full picture AI research · Nov 1, 2026
A subdivision and land development plan on file with Cumberland County proposes 26 single-family attached townhomes in Shippensburg Township. Attached townhomes share side walls with their neighbors. The homes would sit in four buildings, with 58 parking spaces for residents and visitors.
The site is an existing residential lot. The county record doesn't say what is on the lot today, who the developer is, or whether the homes would be sold or rented.
No news coverage, township meeting records, developer page or opposition was found that clearly concerns this project. The description here rests on the county filing alone.
What it could mean nearby
- 58 parking spaces for 26 homes works out to about 2.2 per home. That suggests the plan intends to park most vehicles on site.
- 26 new households would add some daily traffic on nearby roads. The records found don't include a traffic study or say which road would provide access.
- The plan would add 26 homes to the local housing supply. Records found don't say what the homes would cost or whether they would be rented.
Where it stands
The plan was last filed with the county on 2024-06-10. Whether the township has approved it is unknown. Plans like this usually get a county planning review and then township planning commission and supervisor review. After approval, the developer must meet engineering and permit requirements before construction starts.
- Jun 10, 2024 Latest filing of the plan in county planning records
Want to weigh in? The Shippensburg Township Board of Supervisors normally makes the final decision after the township planning commission reviews the plan. Residents can usually comment at those public meetings, and agendas are posted on the township website.
Planning terms explained
- Subdivision and land development plan
- A detailed site plan submitted to the municipality for review. It covers how a property is divided or built on, including buildings, parking, roads and utilities.
- Single-family attached
- Homes for one household each that share one or more walls with the next home, like townhouses.
- Planning commission
- A volunteer local board that reviews development plans and advises elected officials.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $9.6M
- ~364 roofing squares
- ~26 HVAC systems
- ~26 kitchens / 52+ bathrooms
- ~52,000 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →