[Centre County](https://plannednearby.com/c/centre-pa/) · [Walker Township](https://plannednearby.com/c/centre-pa/walker-township) · #PAD140121 · [Solar farms tracker](https://plannednearby.com/topics/solar-farms/)

# Confer Solar Project

Walker Township, PA · industrial

In short: **Confer Solar Project** is an industrial development in Walker Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: Construction stormwater permit (earth disturbance) authorized (July 8, 2026). What usually happens next: site work and construction.

Stage: Permitted · Construction stormwater permit (earth disturbance) authorized · Jul 8, 2026 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=874450)

Usually next: site work and construction.

## About this project

A commercial solar project in Walker Township, Centre County, has a construction stormwater permit application on file with the state DEP.

- **Applicant:** [CONFER I LLC](https://plannednearby.com/f/confer-i-llc)
- **Plan type:** Construction stormwater permit (DEP)
- **Land use:** Commercial or industrial
- **Status:** Site active

## Project history

- **2026-07-08** · #PAD140121 · Construction stormwater permit (DEP)

[DEP site record (eFACTS) →](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=874450)

## The full picture AI research · Nov 6, 2026

The county record is a state construction stormwater permit (an earth-disturbance permit) for a site in Walker Township, filed under the company name Confer I LLC. The record lists the use only as "industrial." The permit was authorized on 2026-07-08.

A Walker Township planning agenda from November 2024 names the same company in a land development plan for the Confer Solar Project. It describes a 20-megawatt solar facility on a property off Heritage Lane. This is probably the same project, but no source ties the permit to that plan directly. Solar sites are often classed as industrial, which would fit the record.

No developer page, news story, listing or construction notice was found for this site. A 22-megawatt solar array by a different company is planned in Walker Township for local governments. No source links it to Confer I LLC. What is on the ground today is not confirmed.

### What it could mean nearby

- Site grading and construction traffic are likely while the earth-disturbance permit is active, but no traffic study was found.
- A solar facility usually adds few permanent jobs and little ongoing traffic. That assumes the permit is for the solar project, which is not confirmed.
- The stormwater permit requires erosion and runoff controls during construction.

### Where it stands

The state stormwater permit was authorized on 2026-07-08, so site work may legally start. No certificate of occupancy or completion appears in the records. Next steps are usually site work, building or electrical inspections, and connection to the power grid.

- **Jul 8, 2026** Construction stormwater permit (earth disturbance) authorized
- **Nov 20, 2024** Walker Township planning commission agenda listed a final land development plan for the Confer Solar Project, a proposed 20-megawatt solar facility

### Who's behind it

CONFER I LLC · A company named on the filing and on the 2024 township agenda for the Confer Solar Project. No official website or other projects were found.

### Around the web

- [Confer Solar I (PJM-AE2-001) — Project Summary](https://www.infrasure.ai/project/pjm-ae2-001-confer-solar-i) — InfrasureA third-party grid-queue tracker lists a 20 MW Confer Solar I in Centre County as suspended, so it is unverified and no construction status is shown.

Planning terms explained

- **Construction stormwater permit:** A state permit that allows soil to be disturbed on a construction site, provided runoff and erosion are controlled.
- **Earth disturbance:** Grading, clearing or digging that exposes soil.
- **Land development plan:** A detailed site plan the township reviews before a project can be built.
- **Certificate of occupancy:** An official sign-off that a finished building is safe to use.
- **Megawatt (MW):** A measure of how much power a solar facility can generate at its peak.

Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Land development plans go through the Walker Township planning commission and supervisors with Centre County planning staff review, and residents can comment at their public meetings. The stormwater permit has already been issued by the state.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Walker Township.

- DEP lists permit applications in the [Pennsylvania Bulletin](https://www.pacodeandbulletin.gov/), usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Walker Township planning commission or governing body meeting when the plan is on the agenda.

[Find Walker Township's meeting agendas →](https://www.google.com/search?q=Walker+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [234 Shady Farm Lane: 21-lot subdivision](https://plannednearby.com/x/centre-102-26) — 0.7 mi · 20 homes, single-family homes · Walker Township · filed 2026-10-20
- [30-lot subdivision, 27 single-family lots](https://plannednearby.com/x/centre-54-26) — 0.7 mi · 27 homes, single-family homes · Walker Township · filed 2026-05-19
- [Mark's Custom Meats retail building](https://plannednearby.com/x/centre-153-25) — 1.6 mi · retail & commercial · Walker Township · filed 2026-05-19
- [Mount Nittany Medical Center Bellefonte building](https://plannednearby.com/x/dep-886277) — 2.4 mi · institutional · Gregg Township · filed 2026-02-18
- [Pike Rd & Madison Ave Waterline](https://plannednearby.com/x/dep-871911) — 4.9 mi · government & utilities · Walker Township · filed 2025-09-02
- [Storage buildings in Miles Township](https://plannednearby.com/x/dep-875242) — 5.5 mi · industrial · Miles Township · filed 2024-09-15

[See everything nearby on a map →](https://plannednearby.com/near#40.94440,-77.62001,Walker%20Township)

---

Source page: https://plannednearby.com/x/dep-874450

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
