[Centre County](https://plannednearby.com/c/centre-pa/) · [Miles Township](https://plannednearby.com/c/centre-pa/miles-township) · #PAD140117

# Storage buildings in Miles Township

Miles Township, PA · industrial

In short: **Storage buildings in Miles Township** is an industrial development in Miles Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued Apr 16, 2025 (April 16, 2025). What usually happens next: site work and construction.

Stage: Permitted · State construction stormwater permit issued Apr 16, 2025 · Apr 16, 2025 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=875242)

Usually next: site work and construction.

## About this project

A stormwater permit filing for storage buildings in Miles Township, Centre County, submitted by a property owner.

- **Plan type:** Construction stormwater permit (DEP)
- **Land use:** Commercial or industrial
- **Status:** Site active

## Project history

- **2025-04-16** · State construction stormwater permit issued Apr 16, 2025 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=875242)
- **2024-09-15** · #PAD140117 · Construction stormwater permit (DEP)
- **2024-09-15** · State construction stormwater permit application received Sep 15, 2024 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=875242)

[DEP site record (eFACTS) →](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=875242)

## The full picture AI research · Nov 6, 2026

County records show a stormwater permit filing for storage buildings in Miles Township, Centre County. A property owner submitted it, and the county classes the project as industrial. Miles Township is a rural area in the Brush Valley, and Rebersburg is its main village. The records give no building count, size, address or tenant.

The state construction stormwater permit was issued on April 16, 2025. This kind of permit is required when a building project disturbs a large area of ground. It sets rules for controlling runoff and erosion while the site is built.

No developer website, news story, township meeting record, property listing or business listing was found for this project. Whether construction has started or the buildings are open is not known from public sources.

### What it could mean nearby

- Construction traffic and some added vehicle trips are possible, but no traffic study or access details were found.
- The permit requires erosion and runoff controls during construction, which matters for nearby streams and neighbors downhill.
- Job and tax effects are unknown, since no tenant or operator was identified.

### Where it stands

The state construction stormwater permit was issued on April 16, 2025. No certificate of occupancy or completion appears in the records, and no source shows whether building has started. Construction normally follows the permit, then inspections and use of the buildings.

- **Apr 16, 2025** State construction stormwater permit issued
- **Sep 15, 2024** Latest county filing for the project

Planning terms explained

- **Stormwater permit:** A state permit that sets rules for controlling muddy runoff and erosion from a construction site.
- **Certificate of occupancy:** A municipal document confirming a finished building is safe to use.
- **Earth disturbance:** Digging, grading or clearing land, which triggers stormwater rules once it passes a size threshold.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Residents can contact the Miles Township supervisors and the Centre County Conservation District, which helps review stormwater permits, but no specific hearing or comment period was found.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Miles Township.

- DEP lists permit applications in the [Pennsylvania Bulletin](https://www.pacodeandbulletin.gov/), usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Miles Township planning commission or governing body meeting when the plan is on the agenda.

[Find Miles Township's meeting agendas →](https://www.google.com/search?q=Miles+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Am Logging Headquarters](https://plannednearby.com/x/dep-882617) — 3.1 mi · office · Millheim Borough · filed 2025-08-18
- [Mount Nittany Medical Center Bellefonte building](https://plannednearby.com/x/dep-886277) — 4.1 mi · institutional · Gregg Township · filed 2026-02-18
- [Pike Rd & Madison Ave Waterline](https://plannednearby.com/x/dep-871911) — 4.9 mi · government & utilities · Walker Township · filed 2025-09-02
- [Confer Solar Project](https://plannednearby.com/x/dep-874450) — 5.5 mi · industrial · Walker Township · filed 2026-07-08
- [234 Shady Farm Lane: 21-lot subdivision](https://plannednearby.com/x/centre-102-26) — 5.7 mi · 20 homes, single-family homes · Walker Township · filed 2026-10-20
- [30-lot subdivision, 27 single-family lots](https://plannednearby.com/x/centre-54-26) — 5.9 mi · 27 homes, single-family homes · Walker Township · filed 2026-05-19

[See everything nearby on a map →](https://plannednearby.com/near#40.92833,-77.51722,Miles%20Township)

---

Source page: https://plannednearby.com/x/dep-875242

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
