# MKG single-family subdivision

Bushkill Township, PA · single-family homes

In short: **MKG single-family subdivision** is a single-family home development in Bushkill Township, Northampton County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued Sep 9, 2025 (September 9, 2025). What usually happens next: site work and construction.

Stage: Permitted · State construction stormwater permit issued Sep 9, 2025 · Sep 9, 2025 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=875667)

Usually next: site work and construction.

## About this project

A single-family residential subdivision in Bushkill Township, Northampton County, filed by MKG Estates LLC for a construction stormwater permit.

- **Applicant:** [MKG ESTATES LLC](https://plannednearby.com/f/mkg-estates-llc)
- **Plan type:** Construction stormwater permit (DEP)
- **Land use:** Residential subdivision
- **Status:** Site active

## Project history

- **2025-09-09** · State construction stormwater permit issued Sep 9, 2025 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=875667)
- **2024-10-11** · #PAD480223 · Construction stormwater permit (DEP)
- **2024-10-11** · State construction stormwater permit application received Oct 11, 2024 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=875667)

[DEP site record (eFACTS) →](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=875667)

Map pin is approximate.

## The full picture AI research · Nov 6, 2026

MKG Estates LLC proposes a single-family subdivision in Bushkill Township, Northampton County. Township documents place it on Lahr Road and East Douglasville Road. They list about 20 lots (one document says 19) in the Rural Residential zoning district, with a new cul-de-sac off Dontas Road.

The township planning commission recommended conditional approval of the preliminary plan in September 2024. Township minutes from May 2025 show the supervisors approved the preliminary plan with conditions. These included signed and notarized plans, corrected soil information under the stormwater basin, and answers to comments from the engineer and regional planners. In August 2025 the supervisors tabled a follow-up resolution for the project. The state construction stormwater permit was issued in September 2025.

No builder website, home listings or news coverage were found, and no evidence of construction or completed homes turned up.

### What it could mean nearby

- The plan adds a new cul-de-sac street off Dontas Road and a right-of-way for that road, so local access and traffic would change.
- A stormwater infiltration basin is part of the plan, so runoff from the new lots would be handled on site.
- About 19 to 20 new single-family lots would add homes in a rural residential area.

### Where it stands

The state stormwater permit was issued in September 2025, and the township gave preliminary plan approval with conditions in 2025. No evidence was found of final plan approval, construction or completed homes. Usual next steps are final plan approval, building permits, then site work and home construction.

- **Sep 9, 2025** State construction stormwater permit issued
- **Aug 7, 2025** Supervisors tabled a resolution on the MKG Estates plan
- **May 2025** Supervisors approved the preliminary plan with conditions
- **Oct 11, 2024** Latest county filing (stormwater permit application)
- **Sep 23, 2024** Planning commission recommended conditional approval
- **Jun 24, 2024** Planning commission agenda listed the subdivision and a related lot line adjustment for first review

### Who's behind it

MKG Estates LLC · A limited liability company named on the township and county filings for this subdivision. No further information about it was found.

### Around the web

- [Bushkill Township Board of Supervisors minutes, May 2025](https://www.bushkilltownship.com/minutes/01may25.pdf) — Bushkill Township · May 1, 2025Shows the preliminary plan approval with conditions.
- [Bushkill Township Board of Supervisors minutes, August 2025](https://bushkilltownship.com/minutes/07aug25.pdf) — Bushkill Township · Aug 7, 2025Shows a resolution for the project was tabled.

Planning terms explained

- **Preliminary major subdivision plan:** A detailed first-stage plan to divide land into several lots, which must be approved before the final plan.
- **Lot line adjustment:** A change to a shared property boundary that does not create new lots.
- **Rural Residential district:** A zoning category that allows homes on fairly large lots in less built-up areas.
- **Construction stormwater permit:** A state permit that controls erosion and runoff while land is being cleared and built on.
- **Cul-de-sac:** A dead-end street with a circular turnaround.

Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Bushkill Township Board of Supervisors decides on plan approvals, and residents can comment at its public meetings or through the township office.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Bushkill Township.

- DEP lists permit applications in the [Pennsylvania Bulletin](https://www.pacodeandbulletin.gov/), usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Bushkill Township planning commission or governing body meeting when the plan is on the agenda.

[Find Bushkill Township's meeting agendas →](https://www.google.com/search?q=Bushkill+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [School admin building and athletic fields, E Lawn Ave](https://plannednearby.com/x/lvpc-2026-09-school-admin-building-and-athletic-field) — same area · 17,600 sq ft non-residential, school · Upper Nazareth Township · filed 2026-09-22
- [Boro Of Nazareth Yard Waste & Recycling Drop-Off Fac](https://plannednearby.com/x/dep-871108) — same area · government & utilities · Upper Nazareth Township · filed 2024-03-06
- [Lezzer Lumber Stockertown Facility](https://plannednearby.com/x/dep-878865) — same area · industrial · Stockertown Borough · filed 2025-03-19
- [Enclave at Bushkill](https://plannednearby.com/x/dep-873311) — same area · single-family homes · Moore Township · filed 2024-06-17
- [Penn Dixie Commercial Park](https://plannednearby.com/x/dep-878051) — same area · industrial · Upper Nazareth Township · filed 2025-02-07
- [Overlook Estates West](https://plannednearby.com/x/dep-873467) — same area · single-family homes · Upper Nazareth Township · filed 2024-06-26

[See everything nearby on a map →](https://plannednearby.com/near#40.77985,-75.31600,Bushkill%20Township)

---

Source page: https://plannednearby.com/x/dep-875667

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.