Lehigh County · Upper Macungie Township · #PAD390321 · Solar farms tracker
Country Meadows Retirement Community Solar Array
Upper Macungie Township, PA · industrial
In short: Country Meadows Retirement Community Solar Array is an industrial development in Upper Macungie Township, Lehigh County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued Oct 23, 2025 (October 23, 2025). What usually happens next: site work and construction.
Usually next: site work and construction.
About this project
Solar array development at the Country Meadows retirement community in Upper Macungie Township, Lehigh County, filed for a DEP construction stormwater permit.
- Applicant
- COUNTRY MEADOWS RETIRMENT COMM LLC
- Plan type
- Construction stormwater permit (DEP)
- Land use
- Commercial or industrial
- Status
- Site active
The full picture AI research · Nov 6, 2026
County records show a solar array planned at the Country Meadows retirement community in Upper Macungie Township, Lehigh County. The owner, listed as a Country Meadows retirement community company, applied for a state construction stormwater permit. That permit covers soil disturbance and runoff while the site is built.
The records give no size or layout, and the county lists the project type as industrial. Solar arrays at retirement campuses usually supply power to the campus itself. This filing does not say whether that is the case here.
No news coverage, township meeting item, or developer page about this specific array was found. The only Country Meadows solar article found describes a different campus, in Frederick, Maryland, so it was not used. Nothing online shows whether construction has started or finished.
What it could mean nearby
- Construction could bring temporary truck and equipment traffic to the campus.
- The stormwater permit means the builder must control erosion and runoff while the ground is disturbed.
- The records show no new homes, and the array would sit on an existing retirement campus.
Where it stands
The state construction stormwater permit was issued on Oct 23, 2025, so the project is permitted. Site work could follow, but no source shows that it has started or been completed.
- Oct 23, 2025 State construction stormwater permit issued
- Jan 9, 2025 Latest county filing for the solar array
Who's behind it
Country Meadows Retirement Comm LLC · The filing lists this company as the owner of the Country Meadows retirement community in Upper Macungie Township.
Planning terms explained
- Construction stormwater permit
- A state permit that requires a builder to control erosion and muddy runoff while disturbing soil.
- Solar array
- A group of solar panels that generates electricity from sunlight.
- DEP
- Pennsylvania's Department of Environmental Protection, the state agency that issues environmental permits.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The state environmental agency (PA DEP) issued the stormwater permit, and residents can raise questions with Upper Macungie Township's planning staff.
This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Upper Macungie Township.
- DEP lists permit applications in the Pennsylvania Bulletin, usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Upper Macungie Township planning commission or governing body meeting when the plan is on the agenda.
Find Upper Macungie Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Krocks Road Mixed Use Developmentsame area · mixed use · Lower Macungie Township · filed 2024-11-22
- 6045 Reppert Lanesame area · industrial · Upper Macungie Township · filed 2025-07-14
- Hamilton Squaresame area · industrial · Lower Macungie Township · filed 2025-05-29
- Lehigh Valley Town Centersame area · mixed use · Lower Macungie Township · filed 2024-07-23
- Transedge Truck Centerssame area · industrial · Upper Macungie Township · filed 2024-08-28
- Trexlertown Retail Ctr Llcsame area · retail & commercial · Upper Macungie Township · filed 2024-01-19