[Northampton County](https://plannednearby.com/c/northampton-pa/) · [Wind Gap Borough](https://plannednearby.com/c/northampton-pa/wind-gap-borough) · #PAD480229

# Proposed Wawa Convenience Store Wind Gap

Wind Gap Borough, PA · retail & commercial

In short: **Proposed Wawa Convenience Store Wind Gap** is a retail and commercial development in Wind Gap Borough, Northampton County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued Oct 8, 2025 (October 8, 2025). What usually happens next: site work and construction.

Named in the records: **Wawa**

Stage: Permitted · State construction stormwater permit issued Oct 8, 2025 · Oct 8, 2025 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=878228)

Usually next: site work and construction.

## About this project

Proposed Wawa convenience store in Wind Gap Borough, Northampton County, filed for a DEP construction stormwater permit.

- **Applicant:** BTS COMMERCIAL REAL ESTATE LLC
- **Plan type:** Construction stormwater permit (DEP)
- **Land use:** Commercial or industrial
- **Status:** Site active

## Project history

- **2025-10-08** · State construction stormwater permit issued Oct 8, 2025 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=878228)
- **2025-04-18** · State construction stormwater permit application received Apr 18, 2025 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=878228)
- **2025-02-28** · #PAD480229 · Construction stormwater permit (DEP)

[DEP site record (eFACTS) →](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=878228)

Map pin is approximate.

## The full picture AI research · Nov 6, 2026

A developer is proposing a Wawa convenience store with gas pumps at 62 N. Broadway (Route 512) in Wind Gap Borough, near Park Avenue. Local news coverage describes a store of about 6,000 square feet on roughly six acres. A Turkey Hill across the road has closed and been replaced by another shop.

The plan went through borough review. The planning commission, which only advises, heard the preliminary plan, and the developer, BTS Commercial Real Estate, LLC, was later scheduled for a zoning hearing board hearing. The outcomes of those hearings were not found. County records show the state construction stormwater permit was issued on October 8, 2025.

No source found shows that construction has started or that the store has opened.

### What it could mean nearby

- A busy Route 512 corridor site could add customer and fuel-delivery traffic near Broadway and Park Avenue.
- A new store would likely bring some retail jobs, though no job count was found.
- The stormwater permit means the site must manage runoff during and after construction.

### Where it stands

The state construction stormwater permit was issued in October 2025. Nothing found shows the borough's final approvals or any later building progress. Construction and occupancy permits usually follow, then an opening.

- **Oct 8, 2025** State construction stormwater permit issued
- **Feb 28, 2025** Latest county filing

### Who's behind it

BTS Commercial Real Estate, LLC · The company is named on the filing and on a zoning hearing notice for the Wind Gap Wawa; no further information was found.

### Around the web

- [Wawa convenience store, gas station proposed in Slate Belt](https://www.wfmz.com/news/area/lehighvalley/northampton-county/slate-belt/wawa-convenience-store-gas-station-proposed-in-slate-belt/article_edf1605c-a36f-11ef-b5e4-dfd9f2903789.html) — WFMZDescribes the preliminary plan for a Wawa store and gas station at 62 N. Broadway, with council approval still pending when written.
- [Wawa proposal in Slate Belt aims to clear more hurdles](https://www.wfmz.com/news/area/lehighvalley/northampton-county/slate-belt/wawa-proposal-in-slate-belt-aims-to-clear-more-hurdles/article_3bdc401e-6612-4cb1-ac5d-f23d44e17c0e.html) — WFMZReports a zoning hearing board date for requests from BTS Commercial Real Estate, LLC, with no outcome given.

Planning terms explained

- **Stormwater permit:** A state permit that controls runoff and erosion from a construction site.
- **Zoning hearing board:** A local board that decides requests for exceptions (variances) to zoning rules.
- **Preliminary plan:** An early formal site plan that the borough reviews before final approval.
- **Planning commission:** An advisory board that reviews development plans and recommends action to the council.

Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Wind Gap Borough Council, its planning commission and its zoning hearing board handle local approvals; residents can attend their public meetings or contact the borough office.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Wind Gap Borough.

- DEP lists permit applications in the [Pennsylvania Bulletin](https://www.pacodeandbulletin.gov/), usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Wind Gap Borough planning commission or governing body meeting when the plan is on the agenda.

[Find Wind Gap Borough's meeting agendas →](https://www.google.com/search?q=Wind+Gap+Borough+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Arsha Vidya Gurukulam](https://plannednearby.com/x/dep-877252) — same area · institutional · Ross Township · filed 2025-01-10
- [Trumbauer minor subdivision in Ross Township](https://plannednearby.com/x/monroe-trumbauer-minor-subdivision-in-ross-town-9406b0) — same area · subdivision (use not stated) · Ross Township · filed 2026-05-12
- [Minor subdivision in Ross Township](https://plannednearby.com/x/monroe-2026-05-minor-subdivision-in-ross-township) — same area · lot line change · Ross Township · filed 2026-05-12
- [Enclave at Bushkill](https://plannednearby.com/x/dep-873311) — same area · single-family homes · Moore Township · filed 2024-06-17
- [MKG single-family subdivision](https://plannednearby.com/x/dep-875667) — same area · single-family homes · Bushkill Township · filed 2024-10-11
- [Lezzer Lumber Stockertown Facility](https://plannednearby.com/x/dep-878865) — same area · industrial · Stockertown Borough · filed 2025-03-19

[See everything nearby on a map →](https://plannednearby.com/near#40.84980,-75.29222,Wind%20Gap%20Borough)

---

Source page: https://plannednearby.com/x/dep-878228

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
