Centre County · Benner Township · #PAD140039
Bellefonte Waterfront
Benner Township, PA · mixed use
In short: Bellefonte Waterfront is a mixed-use development in Benner Township, Centre County, PA. As of November 24, 2026, it is under construction according to web research. Latest record: StateCollege.com reported on Oct. 8, 2026 that fencing went up and site work was starting, with the hotel and garage to be built at the same time. What usually happens next: completion and occupancy.
Usually next: completion and occupancy.
About this project
Commercial or industrial project in Benner Township, Centre County, filed for a DEP construction stormwater permit.
- Applicant
- BELLEFONT WATERFRONT ASSOC 1 LLC
- Plan type
- Construction stormwater permit (DEP)
- Land use
- Commercial or industrial
- Status
- Site active
The full picture AI research · Nov 23, 2026
Bellefonte Waterfront is a redevelopment of the long-vacant former Bush Hotel site. The site is at West High and Dunlop streets in Bellefonte Borough, across from Talleyrand Park. It is not in Benner Township, and nothing industrial is planned.
The plan has two buildings. One is a six-story boutique hotel with a restaurant. It was last reported at 93 rooms, and the October 2026 article gives no room count. The other is a 268-space parking garage with ground-floor retail and, later, condominiums on top. Dunlop Street will be rebuilt as a two-way public street with about 30 on-street spaces. A brick promenade is planned along Spring Creek.
In September 2025 the developer weighed dropping 48 condos and 35,000 sq ft of retail. Reports did not say that was finalized. The October 2026 article gives no condo count and says no retail leases are confirmed. Fencing went up in early October 2026 and site work is starting.
What it could mean nearby
- Dunlop Street will be rebuilt as a two-way public street, with about 30 new on-street spaces and a mid-block crossing.
- A 268-space garage is planned to serve the hotel and downtown parking.
- Expect construction activity near West High and Dunlop streets. The hotel and garage are expected to take roughly 12 to 14 months.
- The hotel, restaurant and possible retail could bring visitors and some jobs to downtown. No retail tenants are confirmed.
Where it stands
Work is under way. Fencing went up and site work started in early October 2026, after the borough finalized a developer's agreement with the owners. The hotel and garage are to be built together, and condos would follow once the garage is finished. Note: County records list the project in Benner Township as industrial, but the state bulletin notice and news coverage place it in Bellefonte Borough as a mixed-use hotel, garage, retail and condo project.
- Oct 2026 Fencing went up and site work began; hotel and garage to be built together over about 12 to 14 months
- Sep 2025 Developers weighed dropping 48 condos and 35,000 sq ft of retail; not finalized
- Jul 15, 2025 State construction stormwater permit issued
- Jun 16, 2025 Borough council conditionally approved the combined preliminary and final land development plan
- Mar 6, 2025 State stormwater permit application received
- Mar 2025 Borough council approved the revised, scaled-down design
Who's behind it
Bellefonte Waterfront Associates · The ownership group behind the project, led by a regional builder and a hotel management firm. No other projects were confirmed.
Around the web
- Site work getting underway for long-planned Bellefonte Waterfront projectStateCollege.com · Oct 8, 2026Fencing is up and site work is starting; it describes the hotel, 268-space garage, retail and later condos, and the finalized developer's agreement.
- Borough flags possible changes to Bellefonte Waterfront projectLock Haven Express · Sep 17, 2025The developers were weighing dropping 48 condos and 35,000 sq ft of retail, and the 93-room hotel was kept.
- Borough council approves Bellefonte Waterfront ProjectLock Haven Express · Mar 2025Council approved the revised, scaled-down plan.
- Council Meeting Minutes 06/16/2025Bellefonte Borough · Jun 16, 2025Council conditionally approved the land development plan, contingent on the Dunlop Street agreement.
- Bellefonte Waterfront developer hopeful for spring 2026 construction startStateCollege.comIt describes a hotel, garage and condo project, which shows the type is mixed-use rather than industrial.
- Pennsylvania Bulletin notice, PAD140039Pennsylvania BulletinThe state permit notice lists Bellefonte Borough as the municipality.
- DEP eFACTS site recordPA DEP · Jul 15, 2025The record shows the stormwater permit application received Mar 6, 2025 and the permit issued Jul 15, 2025.
Planning terms explained
- NPDES / construction stormwater permit
- A state permit that requires erosion and runoff controls while the ground is being disturbed.
- Land development plan
- The detailed site plan a borough reviews and approves before building starts.
- Developer's agreement
- A contract between the borough and the developer covering items such as the Dunlop Street work.
- Public right-of-way
- Land such as a street that the public may use, here Dunlop Street.
Researched by AI from public sources on Nov 23, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: Bellefonte Borough Council handled the plan approvals, and residents can comment at its public meetings. No further approval vote was found.
This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Benner Township.
- DEP lists permit applications in the Pennsylvania Bulletin, usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Benner Township planning commission or governing body meeting when the plan is on the agenda.
Find Benner Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Homeland Manufacturing building addition2.3 mi · industrial · Benner Township · filed 2026-03-17
- Two-lot commercial development with one building2.7 mi · retail & commercial · Benner Township · filed 2026-05-19
- 790-kW agri-voltaic solar facility in Boggs Township2.7 mi · agricultural · Boggs Township · filed 2026-06-16
- Personal care facility, The Fountains at State College3.3 mi · institutional · Benner Township · filed 2026-11-17
- 49-lot residential subdivision at Buffalo Run3.6 mi · single-family homes · Benner Township · filed 2026-09-15
- Bridleridge Phase 13.9 mi · single-family homes · Spring Township · filed 2024-10-28