[Centre County](https://plannednearby.com/c/centre-pa/) · [Patton Township](https://plannednearby.com/c/centre-pa/patton-township) · #PAD140133

# Fillmore Market & Cafe

Patton Township, PA · retail & commercial

In short: **Fillmore Market & Cafe** is a retail and commercial development in Patton Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued Sep 15, 2025 (September 15, 2025). What usually happens next: site work and construction.

Stage: Permitted · State construction stormwater permit issued Sep 15, 2025 · Sep 15, 2025 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=878681)

Usually next: site work and construction.

## About this project

Market and cafe project in Patton Township, Centre County, filed for a DEP construction stormwater permit.

- **Applicant:** [JCP GROUP LLC](https://plannednearby.com/f/jcp-group-llc)
- **Plan type:** Construction stormwater permit (DEP)
- **Land use:** Commercial or industrial
- **Status:** Site active

## Project history

- **2025-09-15** · State construction stormwater permit issued Sep 15, 2025 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=878681)
- **2025-03-03** · #PAD140133 · Construction stormwater permit (DEP)
- **2025-03-03** · State construction stormwater permit application received Mar 3, 2025 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=878681)

[DEP site record (eFACTS) →](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=878681)

## The full picture AI research · Nov 6, 2026

Fillmore Market & Cafe is planned for a 3.66-acre property at 2781 Buffalo Run Road (Route 550) in the rural hamlet of Fillmore, Patton Township. The plan is a 3,330-square-foot building with a market and cafe. It would have a drive-through at the rear that can queue up to 14 cars, outdoor seating, 26 parking spaces and bike parking.

The new building would go on an empty lot on the south side of the road. The long-vacant former Fillmore General Store sits across the road on the same parcel, and it is slated for demolition. That side would then be restored to a natural state, because it contains a stream and wetland.

The site is zoned rural residential. The owner received a 2024 variance allowing a commercial use that already existed to continue at the new location. No opening date or other tenant was found.

### What it could mean nearby

- A traffic study reviewed for the township described the drive-through design as very safe, and the queue lane holds up to 14 cars.
- The site would bring a small local market and cafe to a rural crossroads.
- Removing the vacant general store and restoring the stream and wetland side could improve the look of the site and the environment.
- Parking is limited to 26 spaces, with outdoor seating and bike parking.

### Where it stands

The state construction stormwater permit was issued on Sep 15, 2025. In early November 2025 the township planning commission unanimously recommended the final land development plan for approval, and the plan was to go to the Board of Supervisors next. No source found shows construction starting, and none shows the supervisors' vote. Construction normally follows final approval and building permits.

- **Nov 2025** Township planning commission unanimously recommended approval of the final land development plan; it was to go to the Board of Supervisors next
- **Sep 15, 2025** State construction stormwater permit issued
- **Mar 3, 2025** Latest county filing
- **2024** Variance allowed a pre-existing commercial use to continue at the new location

### Who's behind it

JCP Group LLC · The property owner named in the county filing and the news report; no company website or other projects were found.

### Around the web

- [New market and cafe planned for rural Patton Township](https://www.statecollege.com/articles/business/new-market-and-cafe-planned-for-rural-patton-township/) — StateCollege.com · Nov 6, 2025Describes the 3,330-square-foot building, drive-through, parking, the 2024 variance, the owner, the planning commission's recommendation and the planned demolition of the old store.

Planning terms explained

- **Land development plan:** A detailed site plan showing the building, parking, access and drainage that the township must approve before construction.
- **Variance:** Special permission to depart from a zoning rule, here allowing a commercial use in a rural residential zone.
- **Stormwater permit:** A state permit that controls runoff and erosion while a site is being built.
- **Planning commission:** An advisory board that reviews plans and recommends approval or changes to the elected supervisors.
- **Wetland:** A protected, water-saturated area where building is restricted.

Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Patton Township Board of Supervisors gives final land development approval, and residents can comment at its public meetings.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Patton Township.

- DEP lists permit applications in the [Pennsylvania Bulletin](https://www.pacodeandbulletin.gov/), usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Patton Township planning commission or governing body meeting when the plan is on the agenda.

[Find Patton Township's meeting agendas →](https://www.google.com/search?q=Patton+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Windswept Farm Subdivision](https://plannednearby.com/x/dep-871848) — 0.5 mi · single-family homes · Patton Township · filed 2024-04-04
- [Foxlane Homes At Buffalo Run](https://plannednearby.com/x/dep-888769) — 0.8 mi · single-family homes · Benner Township · filed 2026-06-03
- [Clearwater Conservation Center](https://plannednearby.com/x/dep-873927) — 3.1 mi · institutional · College Township · filed 2024-07-16
- [Personal care facility, The Fountains at State College](https://plannednearby.com/x/centre-108-26) — 3.3 mi · institutional · Benner Township · filed 2026-11-17
- [Hastings & University Student Housing Facility](https://plannednearby.com/x/dep-884804) — 3.8 mi · apartments · State College Borough · filed 2025-11-25
- [Crew 814 construction stormwater permit](https://plannednearby.com/x/dep-884756) — 3.9 mi · industrial · College Township · filed 2025-11-20

[See everything nearby on a map →](https://plannednearby.com/near#40.85444,-77.88239,Patton%20Township)

---

Source page: https://plannednearby.com/x/dep-878681

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
