Centre County · College Township · #PAD140143
Crew 814 construction stormwater permit
College Township, PA · industrial
In short: Crew 814 construction stormwater permit is an industrial development in College Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued May 18, 2026 (May 18, 2026). What usually happens next: site work and construction.
Usually next: site work and construction.
About this project
A construction stormwater permit has been issued to PA Penn State Crew 814 LLC for a commercial or industrial project in College Township, Centre County.
- Applicant
- PA PENN STATE CREW 814 LLC
- Plan type
- Construction stormwater permit (DEP)
- Land use
- Commercial or industrial
- Status
- Site active
The full picture AI research · Nov 6, 2026
County records show that a construction stormwater permit was issued to PA Penn State Crew 814 LLC for a commercial or industrial project in College Township, Centre County. The permit allows the company to disturb earth on the site, such as grading and clearing. It also requires the company to control runoff and erosion while it does so.
The records do not say what will be built, how big it will be, or who will use it. Searches of news, township meeting records, developer pages, property listings and business listings found nothing about this project. The county records give no street address, so the site could not be matched to a specific location.
No certificate of occupancy or completion appears in the records. Work may have started, but no source found online confirms it.
What it could mean nearby
- Earth-moving and construction traffic could be expected on the site while work is under way. The records do not say how much or for how long.
- The final use, jobs, traffic and utility needs are unknown because no project details were found.
Where it stands
The county records show that the stormwater permit was authorized on 2025-11-20. Next steps usually include building permits, construction, inspections and, once the work is finished, an occupancy certificate.
- Nov 20, 2025 Construction stormwater permit (earth disturbance) authorized for PA Penn State Crew 814 LLC
Who's behind it
PA Penn State Crew 814 LLC
Planning terms explained
- Construction stormwater permit
- State approval that lets a builder disturb the ground if it controls erosion and keeps muddy runoff out of streams and storm drains.
- Earth disturbance
- Digging, grading, clearing or moving soil on a building site.
- Certificate of occupancy
- A municipal document confirming that a finished building is safe to use.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The decision on the stormwater permit has already been made, so no comment period is known. Residents with questions can contact the College Township planning staff or attend a township meeting.
This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by College Township.
- DEP lists permit applications in the Pennsylvania Bulletin, usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a College Township planning commission or governing body meeting when the plan is on the agenda.
Find College Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Clearwater Conservation Center1.3 mi · institutional · College Township · filed 2024-07-16
- 49-lot residential subdivision at Buffalo Run1.5 mi · single-family homes · Benner Township · filed 2026-09-15
- Personal care facility, The Fountains at State College1.8 mi · institutional · Benner Township · filed 2026-11-17
- Two-lot commercial development with one building2.4 mi · retail & commercial · Benner Township · filed 2026-05-19
- Homeland Manufacturing building addition2.7 mi · industrial · Benner Township · filed 2026-03-17
- Hastings & University Student Housing Facility3.2 mi · apartments · State College Borough · filed 2025-11-25