[Centre County](https://plannednearby.com/c/centre-pa/) · [Harris Township](https://plannednearby.com/c/centre-pa/harris-township) · #PAD140144

# Commercial/industrial stormwater permit, Harris Twp

Harris Township, PA · industrial

In short: **Commercial/industrial stormwater permit, Harris Twp** is an industrial development in Harris Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued Jun 3, 2026 (June 3, 2026). What usually happens next: site work and construction.

Stage: Permitted · State construction stormwater permit issued Jun 3, 2026 · Jun 3, 2026 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=885700)

Usually next: site work and construction.

## About this project

A state construction stormwater permit for a commercial or industrial site in Harris Township, Centre County.

- **Plan type:** Construction stormwater permit (DEP)
- **Land use:** Commercial or industrial
- **Status:** Site active

## Project history

- **2026-06-03** · State construction stormwater permit issued Jun 3, 2026 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=885700)
- **2026-01-16** · #PAD140144 · Construction stormwater permit (DEP)
- **2026-01-16** · State construction stormwater permit application received Jan 16, 2026 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=885700)

[DEP site record (eFACTS) →](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=885700)

## The full picture AI research · Nov 6, 2026

County records show a state construction stormwater permit was authorized on 2026-01-16 for an industrial or commercial site in Harris Township, Centre County. The permit covers earth disturbance, meaning grading and digging that expose soil, and it requires erosion and runoff controls while the site is built.

The records don't give the site's address, the developer, the size of the building, or the future tenant. Web searches found no news coverage, township meeting items, developer pages, listings or business notices about this project. Because of that, what is on the ground today could not be confirmed. The permit suggests site work could start or may already have started, but no source shows it.

No certificate of occupancy or completion appears in the county records.

### What it could mean nearby

- Construction traffic, noise and dust are possible while the ground is being disturbed, but no source gives details for this site.
- Required runoff and erosion controls are meant to protect nearby streams and neighboring properties during construction.

### Where it stands

A state construction stormwater permit was authorized on 2026-01-16, and no completion or occupancy record exists. Building and site work usually follows the permit, and a certificate of occupancy is issued once the work passes inspection.

- **Jan 16, 2026** State construction stormwater permit (earth disturbance) authorized

### Around the web

- [Harris Township Stormwater Management Ordinance (amended by Ord. 370)](https://ecode360.com/46048042) — ecode360 / Harris Township · Sep 9, 2024Explains the township's stormwater rules, which apply to all land in the township, but says nothing about this specific project.

Planning terms explained

- **Construction stormwater permit:** A state permit (NPDES) that requires a site to control erosion and muddy runoff while soil is disturbed.
- **Earth disturbance:** Activity such as clearing, grading or excavating that exposes soil.
- **Certificate of occupancy:** A local sign-off that a finished building passed inspection and can be used.
- **Land development:** The local approval process for building on or subdividing a parcel.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Harris Township's planning commission and Board of Supervisors handle local land development matters, and residents can comment at their public meetings. The township municipal building is in Boalsburg.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Harris Township.

- DEP lists permit applications in the [Pennsylvania Bulletin](https://www.pacodeandbulletin.gov/), usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Harris Township planning commission or governing body meeting when the plan is on the agenda.

[Find Harris Township's meeting agendas →](https://www.google.com/search?q=Harris+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Blue Spring Enclave](https://plannednearby.com/x/dep-883388) — 1.2 mi · single-family homes · Harris Township · filed 2025-09-18
- [Centre Hills Country Club](https://plannednearby.com/x/dep-868829) — 1.7 mi · recreation · State College Borough · filed 2026-03-04
- [The Retreat At Westerly](https://plannednearby.com/x/dep-877573) — 2.3 mi · industrial · State College Borough · filed 2025-01-21
- [Westerly & Easterly Parkway](https://plannednearby.com/x/dep-874552) — 2.4 mi · recreation · State College Borough · filed 2024-08-15
- [Proposed Stack-N-Stor](https://plannednearby.com/x/dep-871877) — 3.0 mi · warehouse & storage · Ferguson Township · filed 2024-04-08
- [Hastings & University Student Housing Facility](https://plannednearby.com/x/dep-884804) — 3.3 mi · apartments · State College Borough · filed 2025-11-25

[See everything nearby on a map →](https://plannednearby.com/near#40.76500,-77.81556,Harris%20Township)

---

Source page: https://plannednearby.com/x/dep-885700

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
