[Northampton County](https://plannednearby.com/c/northampton-pa/) · [Forks Township](https://plannednearby.com/c/northampton-pa/forks-township) · #PAD480242

# Homes At Forks

Forks Township, PA · single-family homes

In short: **Homes At Forks** is a single-family home development in Forks Township, Northampton County, PA. As of November 24, 2026, it is permitted (building or site permits issued). Latest record: State construction stormwater permit issued May 20, 2026 (May 20, 2026). What usually happens next: site work and construction.

Stage: Permitted · State construction stormwater permit issued May 20, 2026 · May 20, 2026 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=886334)

Usually next: site work and construction.

## About this project

A residential subdivision in Forks Township, Northampton County, has a construction stormwater permit filed with the state DEP.

- **Applicant:** NORTHAMPTON CNTY
- **Plan type:** Construction stormwater permit (DEP)
- **Land use:** Residential subdivision
- **Status:** Site active

## Project history

- **2026-05-20** · State construction stormwater permit issued May 20, 2026 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=886334)
- **2026-02-20** · #PAD480242 · Construction stormwater permit (DEP)
- **2026-02-20** · State construction stormwater permit application received Feb 20, 2026 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=886334)

[DEP site record (eFACTS) →](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=886334)

Map pin is approximate.

## The full picture AI research · Nov 6, 2026

Homes at Forks is a plan by Habitat for Humanity Lehigh Valley and Northampton County to build 25 single-family homes for families who need affordable housing. The site is about 12 acres off Kesslersville Road in Forks Township, near the Two T's entertainment center and Braden Airpark. It was an open field when Habitat bought it in late 2022.

Future homeowners will each put in 250 hours of work on the homes as "sweat equity". The county set aside $2 million in federal pandemic-relief money for the project.

Earlier coverage described a larger project of 50 or more homes, so the plan has apparently been scaled down. In May 2026 the county reported that the township supervisors had given final approval, and that site preparation comes next. No source found shows when construction will start, and no homes are reported built or sold.

### What it could mean nearby

- 25 new homes for income-qualified families, which adds to the local supply of affordable housing.
- Site preparation and construction will bring earth-moving and building activity to the Kesslersville Road area.
- The site is an open field now, so the land will change from open ground to a residential neighborhood.

### Where it stands

The township supervisors gave final plan approval in May 2026, and a state stormwater permit for earth disturbance was authorized in February 2026. Site preparation usually comes next, followed by building permits and home construction.

- **May 2026** Forks Township supervisors gave final approval; the county announced 25 homes and site preparation as the next step
- **Feb 20, 2026** Construction stormwater permit (earth disturbance) authorized, per county records
- **Jan 8, 2026** Preliminary/final plan listed on the Forks Township Planning Commission agenda
- **Nov 2022** Habitat bought the site with county support; the county later added $2 million in federal relief funds

### Who's behind it

Habitat for Humanity of the Lehigh Valley, with Northampton County · A nonprofit homebuilder founded in 1989 that builds and renovates affordable homes for local families who help build them; here it is partnering with the county, which provided funding.

### Around the web

- [Northampton County and Habitat for Humanity Received Final Approval for "Homes at Forks" Attainable Housing](https://thevalleyledger.com/?p=149414) — The Valley Ledger · May 17, 2026Reports final supervisor approval of 25 homes on 12 acres off Kesslersville Road, with site preparation next and no start date.
- [Northampton County, Habitat for Humanity to build 25 homes in Forks Township](https://www.wfmz.com/news/area/lehighvalley/northampton-county/northampton-county-habitat-for-humanity-to-build-25-homes-in-forks-township-for-families-in/article_7774eaf6-ed05-426c-826a-23a3da24a7c6.html) — WFMZAlso reports the 25-home plan and final approval from the Forks Township supervisors.
- [Forks Township Planning Commission agenda, January 8, 2026](https://forkstownship.org/AgendaCenter/ViewFile/Agenda/_01082026-322) — Forks Township · Jan 8, 2026Lists the Homes at Forks (Habitat for Humanity/Northampton County) preliminary/final plan under old business.
- [Lehigh Valley land to become affordable housing for low income families](https://www.lehighvalleypublicmedia.org/news/easton/lehigh-valley-land-to-become-affordable-housing-for-low-income-families/) — Lehigh Valley Public Media · Nov 14, 2022Early 2022 coverage of the land purchase, when a larger project of about 50 homes was described.

Planning terms explained

- **Preliminary/Final Plan:** A combined subdivision or land-development plan that the township reviews and approves in one step, instead of in two separate rounds.
- **Earth disturbance permit:** A state-regulated stormwater permit that allows grading and clearing while controlling mud and runoff.
- **Sweat equity:** Work that future homeowners put into building their homes, in place of part of the cost.
- **Certificate of occupancy:** The official sign-off that a finished building is safe to live in.

Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Final approval has already been granted, so the Forks Township supervisors and Planning Commission have no further plan vote scheduled in the sources found; residents can contact the township or Northampton County for construction updates.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Forks Township.

- DEP lists permit applications in the [Pennsylvania Bulletin](https://www.pacodeandbulletin.gov/), usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Forks Township planning commission or governing body meeting when the plan is on the agenda.

[Find Forks Township's meeting agendas →](https://www.google.com/search?q=Forks+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [605 Kuebler Road (Land Use of Regional Significance)](https://plannednearby.com/x/lvpc-2026-11-605-kuebler-road-land-use-of-regional-si) — same area · other · Forks Township · filed 2026-11-17
- [Trailer Lot Expansion](https://plannednearby.com/x/dep-882353) — same area · industrial · Palmer Township · filed 2025-08-15
- [Lezzer Lumber Stockertown Facility](https://plannednearby.com/x/dep-878865) — same area · industrial · Stockertown Borough · filed 2025-03-19
- [Curative amendment: rural parcel to industrial zoning](https://plannednearby.com/x/lvpc-2026-02-curative-amendment-rural-parcel-to-indus) — same area · rezoning · Palmer Township · filed 2026-02-24
- [Harmony Terrace](https://plannednearby.com/x/warren-25-001) — same area · lot line change · Harmony Township · filed 2025-01-03
- [320-unit apartment Phase 2 on Van Buren Road](https://plannednearby.com/x/lvpc-2026-08-320-unit-apartment-phase-2-on-van-buren) — same area · 320 homes, apartments · Palmer Township · filed 2026-08-25

[See everything nearby on a map →](https://plannednearby.com/near#40.74023,-75.23387,Forks%20Township)

---

Source page: https://plannednearby.com/x/dep-886334

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
