# Creekview Estates

Spring Township, PA · industrial

In short: **Creekview Estates** is an industrial development in Spring Township, Centre County, PA. As of November 24, 2026, it is permitted (building or site permits issued) according to web research. Latest record: County records show the construction stormwater permit authorized 2026-03-24, and the April 2026 planning commission minutes show the township's plan review… What usually happens next: site work and construction.

Stage: Permitted · County records show the construction stormwater permit authorized 2026-03-24, and the April 2026 planning commission minutes show the township's plan review still running under a third extension. · web research checked Nov 6, 2026 · [source](https://www.springtownship.org/sites/default/files/2026-05/april_2026_minutes.doc) AI research

Usually next: site work and construction.

## About this project

A construction stormwater permit has been filed with the state Department of Environmental Protection for Creekview Estates in Spring Township, for commercial or industrial use.

- **Applicant:** [BMW PARTNERSHIP](https://plannednearby.com/f/bmw-partnership)
- **Plan type:** Construction stormwater permit (DEP)
- **Land use:** Commercial or industrial
- **Status:** Site active

## Project history

- **2026-03-24** · #PAD140149 · Construction stormwater permit (DEP)
- **2026-03-24** · State construction stormwater permit application received Mar 24, 2026 · [source](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=887326)

[DEP site record (eFACTS) →](https://www.ahs.dep.pa.gov/eFACTSWeb/searchResults_singleSite.aspx?SiteID=887326)

## The full picture AI research · Nov 6, 2026

Creekview Estates is a proposal in Spring Township, Centre County, for a commercial or industrial site. The developer, BMW Partnership, has a state construction stormwater permit (earth disturbance), authorized 2026-03-24. That permit lets site grading begin, but it is not a building approval.

The township's planning commission minutes show a separate preliminary land development plan for Creekview Estates, submitted in 2025. The township is still reviewing it. The developer has agreed to three 90-day extensions because floodplain and other issues are unresolved. The newest runs from June 7 to September 5, 2026.

No size, tenant, news coverage, opposition, listing or sign of construction was found. No certificate of occupancy is in the records.

### What it could mean nearby

- Floodplain questions are still open in the township's review, so drainage and flood protection are likely points to watch.
- No traffic, jobs or utility details were found in the public sources.

### Where it stands

The state stormwater permit is authorized, but the township's preliminary land development plan was still under review as of the April 2026 minutes. Next come a township decision on that plan, a final plan and building permits, and then construction.

- **Jun 7, 2026** Third 90-day review extension began, running to 2026-09-05
- **Mar 24, 2026** State construction stormwater permit authorized
- **Mar 9, 2026** Second 90-day review extension began, running to 2026-06-07
- **Jan 26, 2026** Planning commission accepted a 90-day extension for the preliminary plan

### Who's behind it

BMW Partnership · BMW Partnership is the firm named on the county filing. A separate item in the same April 2026 planning commission minutes concerns a BMW Partnership duplex development, but no official company site was found.

### Around the web

- [Spring Township Planning Commission minutes, April 2026](https://www.springtownship.org/sites/default/files/2026-05/april_2026_minutes.doc) — Spring Township · Apr 20, 2026The preliminary land development plan for Creekview Estates was under review, with a third 90-day extension because of unresolved floodplain and other issues.
- [Spring Township Planning Commission minutes, January 2026](https://www.springtownship.org/sites/default/files/2026-04/january_2026_minutes.doc) — Spring Township · Jan 26, 2026The commission accepted an earlier 90-day extension, from March 9 to June 7, 2026, for the same plan.

Planning terms explained

- **Preliminary land development plan:** A detailed early site plan the township reviews before it grants final approval.
- **Time extension:** The developer agrees to give the township more time to review a plan beyond the normal 90 days.
- **Floodplain:** Low land beside a stream that can flood, where building is restricted or needs extra protection.
- **Construction stormwater permit:** A state permit that allows earth disturbance while requiring controls on muddy runoff.

Researched by AI from public sources on Nov 6, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Spring Township Planning Commission reviews the plan and advises the Board of Supervisors, which decides; comments can be made at their public meetings or sent to the township office.

This is a state stormwater construction permit (NPDES) from the Pennsylvania Department of Environmental Protection. The building plans themselves are decided by Spring Township.

- DEP lists permit applications in the [Pennsylvania Bulletin](https://www.pacodeandbulletin.gov/), usually with a 30-day window for written comments to the DEP regional office named in the notice.
- For the project itself, speak at a Spring Township planning commission or governing body meeting when the plan is on the agenda.

[Find Spring Township's meeting agendas →](https://www.google.com/search?q=Spring+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Bridleridge Phase 1](https://plannednearby.com/x/dep-876076) — 0.6 mi · single-family homes · Spring Township · filed 2024-10-28
- [49-lot residential subdivision at Buffalo Run](https://plannednearby.com/x/centre-58-25) — 2.6 mi · single-family homes · Benner Township · filed 2026-09-15
- [Two-lot commercial development with one building](https://plannednearby.com/x/centre-44-26) — 2.9 mi · retail & commercial · Benner Township · filed 2026-05-19
- [Homeland Manufacturing building addition](https://plannednearby.com/x/centre-23-26) — 2.9 mi · industrial · Benner Township · filed 2026-03-17
- [Personal care facility, The Fountains at State College](https://plannednearby.com/x/centre-108-26) — 3.4 mi · institutional · Benner Township · filed 2026-11-17
- [Crew 814 construction stormwater permit](https://plannednearby.com/x/dep-884756) — 3.5 mi · industrial · College Township · filed 2025-11-20

[See everything nearby on a map →](https://plannednearby.com/near#40.86895,-77.75487,Spring%20Township)

---

Source page: https://plannednearby.com/x/dep-887326

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.