Eli Lilly pharmaceutical plant, 797,432 sq ft

8810 Main Street, Fogelsville, PA 18051 (north of I-78), Upper Macungie Township, PA · 797,432 sq ft non-residential, industrial · 150.0 acres

About this project

A proposed pharmaceutical manufacturing complex of about 797,432 square feet on roughly 150 acres north of Interstate 78 near Fogelsville. The site is currently used for agriculture, and it is adjacent to an existing industrial park across the highway.

County recommendation: Supports, with comments

Issues raised: Truck trip estimate (90/day) not explained, Truck parking and stacking shortfall, Karst and geotechnical testing needed, Well head protection zone and 150-ft creek buffer, ADA detectable warning surfaces and new bus stop

Applicant
DPR Construction
Engineer / designer
Pennoni Associates
Plan type
Land use of regional significance (LURS)
Land use
industrial
Zoning
Limited Light Industrial (LIL)

Filing history

  • 2026-03-24 · #2026-03-eli-lilly-pharmaceutical-plant-797-432-s · Land use of regional significance (LURS) · 797,432 sq ft

LVPC committee packet (PDF) →

Map pin is approximate.

The full picture AI research · Nov 1, 2026

Eli Lilly plans a pharmaceutical manufacturing campus of about 797,432 square feet on roughly 150 acres in the Fogelsville Corporate Center. The site is on Main Street near Adams Road and Interstate 78 in Upper Macungie Township. It is farmland now. News coverage describes a roughly $3.5 billion investment. The plant would do final assembly of injectable medicines, including weight-loss drugs. That means mixing ingredients made elsewhere into solutions and packaging them.

The township planning commission recommended approval in August 2026. The township supervisors then approved the final land development plan in September 2026. The company reportedly closed on the land in July 2026. Building would happen in phases, starting with a visitor center and amenities building. Coverage did not report any opposition at those meetings.

One article reports about 2,000 construction jobs over the life of the project. Other coverage cites roughly 850 permanent jobs. Square-footage figures differ between sources, and some say about 925,000 sq ft.

What it could mean nearby

Where it stands

The township approved the final land development plan on 2026-09-03, so local site-plan approval appears complete. Next usually come state and local construction permits, then site work, with construction expected to take years.

Want to weigh in? The Upper Macungie Township Board of Supervisors held the final approval vote, so any further public comment would go through its meetings or the township office.

Who's behind it

Eli Lilly and Company · A major pharmaceutical company that makes and sells prescription medicines, including injectable diabetes and weight-loss drugs.

Around the web

Planning terms explained
Land development plan
A detailed site plan showing buildings, roads, utilities and drainage that a municipality must approve before building.
Waiver
Permission to skip or modify a specific township design rule for a project.
Sewage planning module
A state-required document showing how a project's wastewater will be handled.
LERTA
A local tax break that phases in higher property taxes on new construction over time.
Lehigh Valley Planning Commission
A regional advisory body that reviews local development plans and sends comments to the township.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $103.7M