# Final land development plans - MC Solar

West Salem Township, PA · other

In short: **Final land development plans - MC Solar** is a development project in West Salem Township, Mercer County, PA. As of November 24, 2026, it is approved according to web research. Latest record: The county record dated 2024-09-17 describes the final plans as complete and ready for recording, and a search listing shows the project on a November 19, 2024… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Stage: Approved · The county record dated 2024-09-17 describes the final plans as complete and ready for recording, and a search listing shows the project on a November 19, 2024 review-committee agenda. · web research checked Nov 21, 2026 · [source](https://www.mcrpc.com/) AI research

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

## About this project

Final land development plans for the MC Solar project in West Salem Township, described as complete and ready for recording. The plans include emergency access routes, and other required permits and approvals are noted on them. The agenda does not give the site size or what the land currently is.

- **Plan type:** Final land development
- **Land use:** other

## Project history

- **2024-09-17** · #2024-09-final-land-development-plans-mc-solar · Final land development

[County plan review office →](https://www.mcrpc.com/)

Map pin is approximate.

## The full picture AI research · Nov 21, 2026

MC Solar is a planned 50-megawatt solar power plant in West Salem Township, Mercer County. Federal energy data, as shown on interconnection.fyi, lists the owner as MC Solar, LLC and the plant as planned. It would add no homes.

In September 2024 the county planning commission reviewed the final land development plans and described them as complete and ready for recording. The plans show emergency access routes, and other required permits and approvals are noted on them. The county agenda does not give the acreage or say what the land is now. The agenda PDFs and minutes could not be read as text, so those details could not be checked.

No news coverage, developer page or construction notice was found for this site. Grid-queue listings still show it as planned for about January 2027. One listing says the project is under construction, but no other source backs that up.

### What it could mean nearby

- The plans include emergency access routes, so fire and rescue crews are expected to have a way into the site.
- A solar plant normally brings little day-to-day traffic once it is running. Construction traffic is likely while it is being built, but no source describes it.
- The 50 MW plant would feed the regional grid (PJM). It adds no homes and, by itself, no new school students.

### Where it stands

County records show the final land development plans were reviewed in September 2024 and described as complete and ready for recording. Recording the plans and getting building and other permits usually follow, and no source shows whether those steps have happened. The November 2024 commission minutes, which the fact-check says record the approval vote, could not be read as text, so that date is not confirmed here. Note: InfraSure's project summary calls the project under construction, but its plant page and the other queue listings show it as planned, and no local source confirms any work on site.

- **Jan 2027** Planned operation date in grid-queue and EIA listings
- **Nov 19, 2024** Final land development plans for MC Solar listed on a county review-committee agenda (seen in a search listing; not opened)
- **Sep 17, 2024** County planning commission reviewed the final plans and described them as complete and ready for recording
- **Aug 13, 2024** West Salem Township enacted its Solar Energy Facility Ordinance (Ordinance No. 72 of 2024)

### Who's behind it

MC Solar, LLC · The project-specific company listed as owner and operator in federal energy data; no parent company or website was found.

### Around the web

- [MC Solar (EIA plant 68930)](https://www.interconnection.fyi/eia/plant/68930) — interconnection.fyiLists a planned 50 MW solar PV plant owned by MC Solar, LLC in Mercer County, with a proposed 2027 start.
- [MC Solar I, expected commercial operation January 2027](https://cleanview.co/power-projects/planned/solar-farms/pennsylvania/AE2-285/mc-solar-i) — CleanviewShows the PJM queue entry AE2-285 as planned for January 2027.
- [MC Solar I (PJM-AE2-285) Project Summary](https://www.infrasure.ai/project/pjm-ae2-285-mc-solar-i) — InfraSureGives a cost estimate of about $129M and a January 2027 date, but describes the status inconsistently.
- [Revised November 2024 Zoning & Subdivision agenda](https://mcrpc.com/wp-content/uploads/2024/11/revised-2024-NOVEMBER-ZS-AGENDA.pdf) — Mercer County Regional Planning Commission · Nov 19, 2024A search listing shows the MC Solar final plans on this agenda, but the PDF could not be read as text.
- [11-26-24 Minutes](https://www.mcrpc.com/wp-content/uploads/2025/02/11-26-24-Minutes.pdf) — Mercer County Regional Planning Commission · Nov 26, 2024The fact-check cites these minutes for the approval vote, but the PDF could not be read as text, so that is unconfirmed here.
- [West Salem Township Solar Facility Ordinance 72A](https://www.mcrpc.com/wp-content/uploads/2026/05/Ordinance-72A-Solar-Facility.docx) — Mercer County Regional Planning Commission · May 2026Shows the township's solar rules, including required county and township approvals.

Planning terms explained

- **Final land development plan:** The detailed site plan a project must have approved before it can be recorded and built.
- **Recording:** Filing the approved plans with the county as a permanent public record.
- **Nameplate capacity (MW):** The maximum power output the plant is built for, in megawatts.
- **PJM interconnection queue:** The regional grid operator's waiting list for power plants that want to connect to the grid.
- **Solar PV:** Photovoltaic panels that turn sunlight directly into electricity.

Researched by AI from public sources on Nov 21, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Mercer County Regional Planning Commission reviewed the plans, and its meetings are public (see mcrpc.com). West Salem Township supervisors handle township permits and the solar ordinance.

In Pennsylvania, West Salem Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the West Salem Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the West Salem Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find West Salem Township's meeting agendas →](https://www.google.com/search?q=West+Salem+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [MC Solar final land development plan, West Salem Township](https://plannednearby.com/x/mercer-2024-09-mc-solar-final-land-development-plan-wes) — same area · other · West Salem Township · filed 2024-09-17
- [Dunkin' restaurant at 48 W. Main St., Greenville](https://plannednearby.com/x/mercer-2026-11-dunkin-restaurant-at-48-w-main-st-greenv) — same area · 2,848 sq ft non-residential, restaurant · Greenville Borough · filed 2026-11-17
- [2,848 sq ft Dunkin' building, Greenville Borough](https://plannednearby.com/x/mercer-2026-04-2-848-sq-ft-dunkin-building-greenville-b) — same area · 2,848 sq ft non-residential, restaurant · Greenville Borough · filed 2026-04-21
- [Thiel College athletic and wellness center addition](https://plannednearby.com/x/mercer-2026-05-thiel-college-athletic-and-wellness-cent) — same area · school · Greenville · filed 2026-05-19
- [Greenville Reynolds Dev Damascus Site](https://plannednearby.com/x/dep-876522) — same area · industrial · Pymatuning Township · filed 2024-11-25
- [Edgewood Cath Lab 7,936 sq ft medical building](https://plannednearby.com/x/mercer-edgewood-cath-lab-7-936-sq-ft-medical-bu-300daa) — same area · 7,936 sq ft non-residential, institutional · Pymatuning Township · filed 2026-07-21

[See everything nearby on a map →](https://plannednearby.com/near#41.40251,-80.41825,West%20Salem%20Township)

---

Source page: https://plannednearby.com/x/mercer-2024-09-final-land-development-plans-mc-solar

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.