[Mercer County](https://plannednearby.com/c/mercer-pa/) · [City of Sharon](https://plannednearby.com/c/mercer-pa/city-of-sharon) · #2025-09-2-bay-commercial-garage-at-stambaugh-div

# 2-bay commercial garage at Stambaugh & Division

Corner of Stambaugh Street and Division Street, City of Sharon, PA · 1,600 sq ft non-residential, retail & commercial · 0.4 acres

In short: **2-bay commercial garage at Stambaugh & Division** is a retail and commercial development in City of Sharon, Mercer County, PA. It would add 1,600 sq ft of non-residential space on 0.4 acres. Its estimated construction value is about $352K, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Preliminary/final minor land development reviewed at a meeting of the county planning commission (September 16, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Preliminary/final minor land development reviewed at a meeting of the county planning commission · Sep 16, 2025 · [source](https://www.mcrpc.com/)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

A 1,600 sq ft two-bay commercial garage with a 12x15 ft attached office is proposed on a roughly 0.37-acre corner lot. The county agenda notes that the zoning officer waived screening because of a sight-line conflict.

Issues raised: Screening waived by zoning officer due to line-of-sight conflict

- **Plan type:** Preliminary/final minor land development
- **Land use:** retail

## Project history

- **2025-09-16** · #2025-09-2-bay-commercial-garage-at-stambaugh-div · Preliminary/final minor land development · 1,600 sq ft

[County plan review office →](https://www.mcrpc.com/)

Map pin is approximate.

## The full picture AI research · Nov 7, 2026

A two-bay commercial garage of about 1,600 square feet is proposed on a corner lot of roughly 0.37 acres at Stambaugh Street and Division Street in the City of Sharon. It would include a small attached office of about 12 by 15 feet. Such a garage would typically be used for vehicle repair or service work.

The county agenda notes that the city zoning officer waived the usual requirement for screening plantings or fencing. The reason given was a sight-line conflict, meaning that screening could block drivers' view at the corner.

A September 2025 agenda from the county planning commission lists the plan under a name that includes 'Sahadeo', as a commercial garage. No news coverage, builder page, listing, business opening or construction notice was found for this site.

### What it could mean nearby

- Corner location means drivers entering and leaving the garage will matter for visibility. The screening waiver was granted because of the sight-line issue.
- A small commercial use of 1,600 sq ft is unlikely to add many jobs, but it could add a few local ones.

### Where it stands

The plan was filed for county review on 2025-09-16 and appeared on the county planning commission's September 2025 agenda. The outcome of that review and any city approval could not be confirmed online. Usually the county commission sends comments to the city, which then acts on the plan, and building permits follow.

- **Sep 23, 2025** Plan listed on the Mercer County Regional Planning Commission's September meeting agenda
- **Sep 16, 2025** Preliminary/final minor land development filed for county review

### Around the web

- [September Agenda Revised](https://www.mcrpc.com/wp-content/uploads/2025/09/September-Agenda-Revised.pdf) — Mercer County Regional Planning Commission · Sep 23, 2025Lists the commercial garage minor land development in the City of Sharon for the September 2025 meeting.

Planning terms explained

- **Minor land development:** A smaller building project that needs formal plan review but is simpler than a large development.
- **Preliminary/final:** The plan is being reviewed as both the first and last plan stage, in a single step.
- **Screening:** Fences or plantings required to hide a commercial site from neighbors or the street.
- **Sight line:** The clear view drivers need to see traffic and pedestrians at a corner.
- **Zoning officer:** The city official who applies zoning rules and can grant certain limited waivers.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Mercer County Regional Planning Commission reviews the plan and advises the City of Sharon, whose planning commission and city council make the local decision. Residents can comment at their public meetings.

In Pennsylvania, City of Sharon decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the City of Sharon planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the City of Sharon manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find City of Sharon's meeting agendas →](https://www.google.com/search?q=City+of+Sharon+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$352K**

- ~16 roofing squares (assumes 1 story)
- ~4 tons of cooling (rule of thumb 400 sq ft/ton)

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Mercer Node Phases II-III, relocate 30MGW power station](https://plannednearby.com/x/mercer-2026-04-mercer-node-phases-ii-iii-relocate-30mgw) — same area · other · City of Sharon · filed 2026-04-21
- [Mercer Node Phases II-III buildings and PowerStation move](https://plannednearby.com/x/mercer-2026-06-mercer-node-phases-ii-iii-buildings-and) — same area · other · City of Sharon · filed 2026-06-16
- [Mercer Node Phase 1, 80 MW substation, Sharon](https://plannednearby.com/x/mercer-2026-04-mercer-node-phase-1-80-mw-substation-sha) — same area · other · City of Sharon · filed 2026-04-21
- [Preliminary plan, Mercer Node Phases II and III](https://plannednearby.com/x/mercer-2026-04-preliminary-plan-mercer-node-phases-ii-a) — same area · other · City of Sharon · filed 2026-04-21
- [1,700 sq ft commercial garage at Stambaugh and Division](https://plannednearby.com/x/mercer-2025-09-1-700-sq-ft-commercial-garage-at-stambau) — same area · 1,700 sq ft non-residential, retail & commercial · City of Sharon · filed 2025-09-16
- [Colonial Metals industrial two-building addition](https://plannednearby.com/x/mercer-2026-08-colonial-metals-industrial-two-building) — same area · 26,400 sq ft non-residential, industrial · City of Hermitage · filed 2026-08-18

[See everything nearby on a map →](https://plannednearby.com/near#41.24119,-80.51011,City%20of%20Sharon)

---

Source page: https://plannednearby.com/x/mercer-2025-09-2-bay-commercial-garage-at-stambaugh-div

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
