# Grove City College baseball field

Pine Township, PA · recreation

In short: **Grove City College baseball field** is a recreation project in Pine Township, Mercer County, PA. As of November 24, 2026, it is in review. Latest record: Preliminary/final land development reviewed at a meeting of the county planning commission (September 23, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Preliminary/final land development reviewed at a meeting of the county planning commission · Sep 23, 2025 · [source](https://www.mcrpc.com/)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Grove City College has a preliminary/final land development plan for a baseball field in Pine Township. The agenda does not give the field's size or location.

- **Plan type:** Preliminary/final land development
- **Land use:** recreation

## Project history

- **2025-09-23** · #2025-09-grove-city-college-baseball-field · Preliminary/final land development

[County plan review office →](https://www.mcrpc.com/)

Map pin is approximate.

## The full picture AI research · Nov 7, 2026

Grove City College plans a new baseball field on college land along Pinchalong Road, east of the main campus. The county planning commission's September 2025 papers describe a synthetic turf field, dugouts, a two-story press box and parking. They list about 24 acres of ground disturbance. The college has put the cost at about $3 million. The field would be named for a former player who is the lead donor.

The college says the current field drains poorly and has uneven ground. The new field is meant to replace it. The college also plans to open it to community groups, area schools, churches and high-school playoff games.

No news or college page found shows that work has begun or that the field has opened. A May 2026 county planning slide deck appears to show a later round of review. It lists a roughly 125,000 sq. ft. turf field and names Grove City Borough, not Pine Township.

### What it could mean nearby

- Playoff games and community events could bring more game-day traffic and parking demand to Pinchalong Road.
- The county papers list about 24 acres of disturbance, so the site will change from its current state and will need stormwater controls.
- Wider public use is planned: community groups, area schools and churches would be able to use the field.

### Where it stands

The county filing (2025-09-23) is a combined preliminary/final land development plan. A May 2026 county planning slide deck appears to show the plan recommended for approval, conditioned on other permits, but it names Grove City Borough as the location. No source found shows a final local approval, permits or construction. Local approval and permits would usually come next, then site work. Note: The May 2026 county planning slides list the project in Grove City Borough, while the September 2025 filing lists Pine Township.

- **May 2026** County planning commission slides appear to recommend the college's athletic complex plan, subject to permits; municipality listed as Grove City Borough
- **Sep 23, 2025** Preliminary/final land development plan reviewed by the county planning commission (Pine Township)
- **Apr 28, 2025** College announces the new field and names it for a lead donor; budget about $3 million
- **Jun 2024** College article says a new baseball facility is being planned, perhaps off campus

### Who's behind it

[Grove City College](https://www.gcc.edu/) · A private college in Grove City, PA that is raising funds for new athletic facilities through its Impact 150 campaign, tied to its 2026 sesquicentennial.

### Around the web

- [Slides May 2026](https://www.mcrpc.com/wp-content/uploads/2026/05/Slides-May-2026.pdf) — Mercer County Regional Planning Commission · May 26, 2026Appears to list a recommendation for the college's turf baseball facility plan, subject to permits, with the location given as Grove City Borough.
- [9 23 2025 Minutes](https://www.mcrpc.com/wp-content/uploads/2026/01/9-23-2025-Minutes.pdf) — Mercer County Regional Planning Commission · Sep 23, 2025Describes a new collegiate baseball facility with a turf field, a two-story press box, dugouts and parking.
- [September Agenda](https://www.mcrpc.com/wp-content/uploads/2025/09/September-Agenda.pdf) — Mercer County Regional Planning Commission · Sep 9, 2025Lists the Grove City College baseball field plan in Pine Township.
- [New baseball field to be built](https://athletics.gcc.edu/news/2025/4/28/baseball-new-baseball-field-to-be-built.aspx) — Grove City College Athletics · Apr 28, 2025Gives the location on college land along Pinchalong Road, the $3 million budget and the planned community use, with no construction dates.
- [Impact 150: Fieldhouse, diamond, and dome will meet growing needs](https://www.gcc.edu/Home/Student-Alumni-Stories-template/Student-Detail/impact-150-fieldhouse-diamond-and-dome-will-meet-growing-needs) — Grove City College · Jun 1, 2024Explains why the college wants a new baseball facility to replace its soggy current field.

Planning terms explained

- **Preliminary/final land development plan:** A single submission that asks for both early and last-stage approval of a site plan, usually for a project that is fairly simple.
- **County planning commission review:** The county gives advice on the plan, but the local municipality makes the approval decision.
- **Disturbance:** The amount of ground that will be dug up, graded or cleared during construction.
- **Synthetic turf:** An artificial playing surface that does not need mowing and drains better than natural grass.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The municipality where the site lies (Pine Township or Grove City Borough) decides on the plan, and residents can comment at its public meetings. The county planning commission only gives advice.

In Pennsylvania, Pine Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Pine Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Pine Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Pine Township's meeting agendas →](https://www.google.com/search?q=Pine+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Village Park final phase, 19 single-family lots](https://plannednearby.com/x/mercer-2025-09-village-park-final-phase-19-single-famil) — same area · 19 homes, single-family homes · Pine Township · filed 2025-09-16
- [Guthrie Theatre demolition and rebuild, Grove City](https://plannednearby.com/x/mercer-2026-11-guthrie-theatre-demolition-and-rebuild-g) — same area · other · Grove City Borough · filed 2026-11-17
- [Village Park final major land development](https://plannednearby.com/x/mercer-2025-09-village-park-final-major-land-developmen) — same area · recreation · Pine Township · filed 2025-09-23
- [Baseball facility with turf field and press box](https://plannednearby.com/x/mercer-baseball-facility-with-turf-field-and-pr-7889d6) — same area · recreation · Pine Township · filed 2025-09-16
- [19 single-family lots, Village Park final phase](https://plannednearby.com/x/mercer-2025-09-19-single-family-lots-village-park-final) — same area · 19 homes, single-family homes · Pine Township · filed 2025-09-16
- [Lot consolidation with office/gym and self-storage, Pine Twp](https://plannednearby.com/x/mercer-lot-consolidation-with-office-gym-and-se-e6f931) — same area · mixed use · Pine Township · filed 2026-10-20

[See everything nearby on a map →](https://plannednearby.com/near#41.16279,-80.08629,Pine%20Township)

---

Source page: https://plannednearby.com/x/mercer-2025-09-grove-city-college-baseball-field

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.