[Mercer County](https://plannednearby.com/c/mercer-pa/) · [Pine Township](https://plannednearby.com/c/mercer-pa/pine-township) · #2025-09-village-park-final-phase-19-single-famil

# Village Park final phase, 19 single-family lots

Pine Township, PA · 19 homes, single-family homes

In short: **Village Park final phase, 19 single-family lots** is a single-family home development in Pine Township, Mercer County, PA. It would add 19 homes. Its estimated construction value is about $10.6M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Final land development reviewed at a meeting of the county planning commission (September 16, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Final land development reviewed at a meeting of the county planning commission · Sep 16, 2025 · [source](https://www.mcrpc.com/)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

This is the last portion of the Village Park subdivision, the final phase of its master plan. It proposes 19 single-family residential lots with new roads and utility extensions.

- **Plan type:** Final land development
- **Land use:** single-family

## Project history

- **2025-09-16** · #2025-09-village-park-final-phase-19-single-famil · Final land development · 19 lots/units

[County plan review office →](https://www.mcrpc.com/)

Map pin is approximate.

## The full picture AI research · Nov 7, 2026

The final phase of the Village Park neighborhood, south of Grove City in Pine Township, proposes 19 single-family lots. The plan includes new streets and extensions of utilities. County records call it the last piece of the subdivision's master plan.

Online sources add some context. Planning commission minutes from September 2024 describe an earlier, larger preliminary plan of 39 lots to complete the Village Park planned residential development. A separate October 2025 planning commission agenda lists a rezoning request for Village Park land along Airport Road, from R-1 to R-2, which would allow multifamily housing. That request is from a land-holding company. The sources found do not say whether the rezoning request covers the same land as the 19 lots.

No builder website, home listings, news coverage or construction reports were found for this final phase. Existing Village Park Drive homes and a commercial lot are listed for sale, but none of those listings is tied to the 19 lots.

### What it could mean nearby

- Up to 19 new households would use the new streets and join the existing Village Park neighborhood, within the Grove City Area School District.
- New roads and utility extensions are part of the plan, so local traffic and water and sewer service would be affected.
- A separate rezoning request nearby, if approved, could allow denser multifamily housing than single-family lots.

### Where it stands

The county shows the final land development plan filed on 2025-09-16 and still in review. Review by the planning commission and township approval usually come first, then the plan is recorded, and site and building permits follow. Note: The September 2024 planning commission minutes describe a 39-lot Village Park plan, not 19, but this may be an earlier, larger version of the plan.

- **Oct 2025** The county planning commission agenda lists a request to rezone Village Park land along Airport Road from R-1 to R-2.
- **Sep 16, 2025** The final land development plan was filed for county review.
- **Sep 2024** The county planning commission considered a preliminary plan of 39 lots to complete the Village Park planned residential development.

### Around the web

- [September 2024 Minutes](https://mcrpc.com/wp-content/uploads/2024/11/2024September-Minutes-ZS.pdf) — Mercer County Regional Planning Commission · Sep 1, 2024The minutes list a 39-lot preliminary plan to complete the Village Park planned residential development in Pine Township.
- [October Agenda Revised](https://www.mcrpc.com/wp-content/uploads/2025/10/October-Agenda-Revised-10252025.pdf) — Mercer County Regional Planning Commission · Oct 25, 2025The agenda lists a Village Park rezoning request from R-1 to R-2 submitted by a land-holding company.
- [116 Village Park Dr listing](https://www.coldwellbankerhomes.com/pa/pine-township-mercer-county/116-village-park-dr/pid_72001433/) — Coldwell Banker · Jun 16, 2026A commercial lot on Village Park Drive is listed for sale, with no sign of construction.

Planning terms explained

- **Final land development:** The last formal plan review before a project is recorded and permits can be issued.
- **Planned residential development (PRD):** A neighborhood approved under a master plan that sets lots, roads and open space as a group.
- **R-1 to R-2 rezoning:** A change in the zoning district that would allow denser housing, including multifamily.
- **Preliminary subdivision:** An earlier-stage plan showing how land would be divided before final approval.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Pine Township supervisors decide on the final plan, and residents can comment at their public meetings or by contacting the township office. The Mercer County Regional Planning Commission also reviews plans at its monthly meetings.

In Pennsylvania, Pine Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Pine Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Pine Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Pine Township's meeting agendas →](https://www.google.com/search?q=Pine+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$10.6M**

- ~608 roofing squares
- ~19 HVAC systems
- ~19 kitchens / 38+ bathrooms
- ~53,200 sq ft of finished living space

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Grove City College baseball field](https://plannednearby.com/x/mercer-2025-09-grove-city-college-baseball-field) — same area · recreation · Pine Township · filed 2025-09-23
- [Guthrie Theatre demolition and rebuild, Grove City](https://plannednearby.com/x/mercer-2026-11-guthrie-theatre-demolition-and-rebuild-g) — same area · other · Grove City Borough · filed 2026-11-17
- [Village Park final major land development](https://plannednearby.com/x/mercer-2025-09-village-park-final-major-land-developmen) — same area · recreation · Pine Township · filed 2025-09-23
- [Baseball facility with turf field and press box](https://plannednearby.com/x/mercer-baseball-facility-with-turf-field-and-pr-7889d6) — same area · recreation · Pine Township · filed 2025-09-16
- [19 single-family lots, Village Park final phase](https://plannednearby.com/x/mercer-2025-09-19-single-family-lots-village-park-final) — same area · 19 homes, single-family homes · Pine Township · filed 2025-09-16
- [Lot consolidation with office/gym and self-storage, Pine Twp](https://plannednearby.com/x/mercer-lot-consolidation-with-office-gym-and-se-e6f931) — same area · mixed use · Pine Township · filed 2026-10-20

[See everything nearby on a map →](https://plannednearby.com/near#41.16553,-80.08467,Pine%20Township)

---

Source page: https://plannednearby.com/x/mercer-2025-09-village-park-final-phase-19-single-famil

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
