Final plan, Mercer Node Phase 1 substation

Mercer County (town not stated), PA · data center

In short: Final plan, Mercer Node Phase 1 substation is a data center project in Mercer County (town not stated), PA. As of November 24, 2026, it is approved according to web research. Latest record: Trade press reports that Sharon's zoning board approved Keel's data center expansion at the Clark Street site in April 2026, with county and city planning… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved Trade press reports that Sharon's zoning board approved Keel's data center expansion at the Clark Street site in April 2026, with county and city planning reviews and council action still to come. · web research checked Nov 22, 2026 · source AI research
  1. Proposed
  2. In reviewApr 2026
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

Final plan for Phase 1 of the Mercer Node project, which includes a substation. The agenda gives no details on size, location, or current site conditions.

Plan type
Final plan
Land use
other

Project history

  • 2026-04-21 · #2026-04-final-plan-mercer-node-phase-1-substatio · Final plan

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 22, 2026

Mercer Node is a three-phase project on Clark Street in the City of Sharon. It is on a former industrial site, most recently used for Bitcoin mining. Phase 1 is a new 80-megawatt electrical substation on the south part of an 11-acre parcel. About 1.2 acres would be disturbed for the substation. Later phases are reported to add a data center in place of the mining operation, then a smaller substation and data center.

The site's owner, Keel Infrastructure (formerly Bitfarms), already runs a 30 MW data center there. The Mercer Node company names match the Clark Street site, but no source states the link directly. Sharon's zoning board approved the expansion in April 2026 with conditions, reportedly including a noise limit and a ban on using river water. A resident petition opposes the data center.

A summary site reports that Sharon City Council approved the land development plans on July 15, 2026, with conditions. That report could not be opened or confirmed against official minutes. No tenant has been named, and no source shows a finished substation.

What it could mean nearby

Where it stands

The county planning commission reviewed the final plan on 2026-04-21, and the city zoning board gave conditional approval in April 2026. City council approval is reported but unconfirmed, and a state stormwater permit was reportedly still pending. Construction permits and site work usually follow once those approvals are final. Note: The county page lists the town as unstated and says the agenda gives no size or location, but other sources place it at Clark Street in the City of Sharon with an 80 MW substation. One source gives the parcel as 11.1 acres and a later county slide deck reportedly says 11.81, while trade sites describe 17 to 18 acres for the wider site.

Who's behind it

Mercer Node Development LLC / Mercer Node Properties LLC · Per state notices, these companies are the applicants, with Civil & Environmental Consultants, Inc. as the consultant. Keel Infrastructure, formerly Bitfarms, owns the Sharon site and runs bitcoin and AI data center sites in North America.

Around the web

Planning terms explained
Final plan
The detailed version of a development plan that planners review before approval.
Land development plan
A plan showing how a site will be built, including buildings, grading, and stormwater.
Substation
A facility that steps electricity from high-voltage lines down to levels a user can draw.
Limit of disturbance
The area of ground that construction is allowed to dig up or clear.
NPDES permit
A state permit controlling stormwater runoff from construction sites.

Researched by AI from public sources on Nov 22, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Sharon City Council and the Sharon Planning Commission handle local plan approvals, and the state DEP handles the stormwater permit. Residents can comment at their public meetings or through DEP's public comment process.

In Pennsylvania, the municipality decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find the municipality's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.