[Mercer County](https://plannednearby.com/c/mercer-pa/) · [Mercer County (town not stated)](https://plannednearby.com/c/mercer-pa/mercer-county-town-not-stated) · #2026-04-final-plan-mercer-node-phase-1-substatio · [Data centers tracker](https://plannednearby.com/topics/data-centers/)

# Final plan, Mercer Node Phase 1 substation

Mercer County (town not stated), PA · data center

In short: **Final plan, Mercer Node Phase 1 substation** is a data center project in Mercer County (town not stated), PA. As of November 24, 2026, it is approved according to web research. Latest record: Trade press reports that Sharon's zoning board approved Keel's data center expansion at the Clark Street site in April 2026, with county and city planning… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Stage: Approved · Trade press reports that Sharon's zoning board approved Keel's data center expansion at the Clark Street site in April 2026, with county and city planning reviews and council action still to come. · web research checked Nov 22, 2026 · [source](https://datacenterdynamics.com/en/news/zoning-board-of-sharon-pa-approves-planned-expansion-of-keel-infrastructures-existing-data-center-development/) AI research

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

## About this project

Final plan for Phase 1 of the Mercer Node project, which includes a substation. The agenda gives no details on size, location, or current site conditions.

- **Plan type:** Final plan
- **Land use:** other

## Project history

- **2026-04-21** · #2026-04-final-plan-mercer-node-phase-1-substatio · Final plan

[County plan review office →](https://www.mcrpc.com/)

Map pin is approximate.

## The full picture AI research · Nov 22, 2026

Mercer Node is a three-phase project on Clark Street in the City of Sharon. It is on a former industrial site, most recently used for Bitcoin mining. Phase 1 is a new 80-megawatt electrical substation on the south part of an 11-acre parcel. About 1.2 acres would be disturbed for the substation. Later phases are reported to add a data center in place of the mining operation, then a smaller substation and data center.

The site's owner, Keel Infrastructure (formerly Bitfarms), already runs a 30 MW data center there. The Mercer Node company names match the Clark Street site, but no source states the link directly. Sharon's zoning board approved the expansion in April 2026 with conditions, reportedly including a noise limit and a ban on using river water. A resident petition opposes the data center.

A summary site reports that Sharon City Council approved the land development plans on July 15, 2026, with conditions. That report could not be opened or confirmed against official minutes. No tenant has been named, and no source shows a finished substation.

### What it could mean nearby

- Noise is a stated concern. Reported approval conditions include a noise limit, and nearby residents have started a petition against the project.
- The site's power would grow substantially, with two 80 MW substations targeted for the end of 2026 and the site already drawing power for existing operations.
- The data center would replace the Bitcoin mining operation on the same site, so it is not new open land. No homes would be added.
- No traffic, jobs or utility-capacity figures were found in the sources.

### Where it stands

The county planning commission reviewed the final plan on 2026-04-21, and the city zoning board gave conditional approval in April 2026. City council approval is reported but unconfirmed, and a state stormwater permit was reportedly still pending. Construction permits and site work usually follow once those approvals are final. Note: The county page lists the town as unstated and says the agenda gives no size or location, but other sources place it at Clark Street in the City of Sharon with an 80 MW substation. One source gives the parcel as 11.1 acres and a later county slide deck reportedly says 11.81, while trade sites describe 17 to 18 acres for the wider site.

- **Jul 15, 2026** Sharon City Council reportedly approved the land development plans with conditions (unconfirmed; summary site only)
- **Jun 2026** Keel reportedly ended Bitcoin mining at the site
- **Apr 29, 2026** Trade press reported the Sharon zoning board's conditional approval of the data center expansion
- **Apr 21, 2026** County planning commission reviewed the Phase 1 final plan
- **Oct 2025** Keel bought the Clark Street site

### Who's behind it

Mercer Node Development LLC / Mercer Node Properties LLC · Per state notices, these companies are the applicants, with Civil & Environmental Consultants, Inc. as the consultant. Keel Infrastructure, formerly Bitfarms, owns the Sharon site and runs bitcoin and AI data center sites in North America.

### Around the web

- [Mercer County Regional Planning Commission](https://www.mcrpc.com/) — MCRPC · Apr 21, 2026County record of the final plan review on 2026-04-21.
- [Zoning board of Sharon, PA approves planned expansion of Keel Infrastructure's data center](https://datacenterdynamics.com/en/news/zoning-board-of-sharon-pa-approves-planned-expansion-of-keel-infrastructures-existing-data-center-development/) — DatacenterDynamics · Apr 2026The zoning board approved the expansion with conditions, and further planning and council reviews remained.
- [Keel Infrastructure: Sharon, PA](https://baxtel.com/data-center/keel-infrastructure-sharon-pa) — BaxtelLists the site at 201 Clark St as planned, with no named tenant, one state permit outstanding and no active construction.
- [Keel Q3 earnings call highlights leasing delays and AI expansion](https://zacks.com/stock/news/3025573/keel-q3-earnings-call-highlights-leasing-delays-and-ai-expansion) — ZacksTenant negotiations for Sharon continue with no lease signed, and Pennsylvania's new requirements delayed timelines.
- [Stop the construction of the data center in Sharon, Pennsylvania](https://www.change.org/p/stop-the-construction-of-the-data-center-in-sharon-pennsylvania) — Change.orgA resident petition opposes the data center.
- [Sharon council approves Mercer Node land development with environmental and noise conditions](https://citizenportal.ai/articles/9648644/pennsylvania/mercer-county/sharon/sharon-council-approves-mercer-node-land-development-with-environmental-and-noise-conditions) — Citizen Portal · Jul 15, 2026Reports council approval with conditions. This page could not be opened and is not an official record.

Planning terms explained

- **Final plan:** The detailed version of a development plan that planners review before approval.
- **Land development plan:** A plan showing how a site will be built, including buildings, grading, and stormwater.
- **Substation:** A facility that steps electricity from high-voltage lines down to levels a user can draw.
- **Limit of disturbance:** The area of ground that construction is allowed to dig up or clear.
- **NPDES permit:** A state permit controlling stormwater runoff from construction sites.

Researched by AI from public sources on Nov 22, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Sharon City Council and the Sharon Planning Commission handle local plan approvals, and the state DEP handles the stormwater permit. Residents can comment at their public meetings or through DEP's public comment process.

In Pennsylvania, the municipality decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the the municipality planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the the municipality manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find the municipality's meeting agendas →](https://www.google.com/search?q=the+municipality+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Minor SALDO adjustment (easement) at 55 Ray Rd](https://plannednearby.com/x/mercer-minor-saldo-adjustment-easement-at-55-ra-1dcbaa) — same area · lot line change · Mercer County (town not stated) · filed 2026-06-16
- [SALDO review, 55 Ray Road](https://plannednearby.com/x/mercer-2026-04-saldo-review-55-ray-road) — same area · other · Mercer County (town not stated) · filed 2026-04-21
- [Final land development, Municipal Garage](https://plannednearby.com/x/mercer-2025-03-final-land-development-municipal-garage) — same area · government & utilities · Jackson Township · filed 2025-03-25
- [Sunrise Solar (Forrester Rd.) screening removal request](https://plannednearby.com/x/mercer-sunrise-solar-forrester-rd-screening-rem-6f3ef3) — same area · other · Fairview Township · filed 2025-08-19
- [Brazen Contracting: stormwater basin and two warehouses](https://plannednearby.com/x/mercer-brazen-contracting-stormwater-basin-and-90556b) — same area · warehouse & storage · New Vernon Township · filed 2026-07-21
- [Sunrise Solar (McCurdy Rd.) screening removal request](https://plannednearby.com/x/mercer-sunrise-solar-mccurdy-rd-screening-remov-2756fb) — same area · other · Jackson Township · filed 2025-08-19

[See everything nearby on a map →](https://plannednearby.com/near#41.33056,-80.13732,Mercer%20County%20%28town%20not%20stated%29)

---

Source page: https://plannednearby.com/x/mercer-2026-04-final-plan-mercer-node-phase-1-substatio

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
