Mercer County · Pine Township · #2025-09-baseball-facility-with-turf-field-and-pr

Baseball facility with turf field and press box

Pine Township, PA · recreation

In short: Baseball facility with turf field and press box is a recreation project in Pine Township, Mercer County, PA. As of November 24, 2026, it is in review. Latest record: Preliminary/final land development reviewed at a meeting of the county planning commission (September 16, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

In review Preliminary/final land development reviewed at a meeting of the county planning commission · Sep 16, 2025 · source
  1. Proposed
  2. In reviewSep 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: a planning commission recommendation, then a vote by the town's governing body.

About this project

A new collegiate baseball facility is proposed in Pine Township for Grove City College. It would include a synthetic turf field, a two-story press box, dugouts, and convenience parking.

Applicant
Grove City College
Plan type
Preliminary/final land development
Land use
recreation

Project history

  • 2025-09-16 · #2025-09-baseball-facility-with-turf-field-and-pr · Preliminary/final land development

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 7, 2026

Grove City College plans a new turf baseball field, called William C. Stewart Baseball Field, on college land along Pinchalong Road, east of the main campus. County records describe a synthetic turf field, dugouts, a two-story press box and convenience parking.

The college announced the roughly $3 million project in April 2025. It is part of its Impact 150 fundraising campaign. The new field would replace the current baseball field, which has drainage problems and uneven ground. The college says community groups, area schools and PIAA playoff games could also use the new field.

No news, permit or social posts were found showing a groundbreaking, construction or opening. The most recent public evidence is the county's September 2025 filing for review.

What it could mean nearby

Where it stands

County records show the preliminary/final land development plan was filed for county review on 2025-09-16. No source found shows approval, permits or construction. Next steps usually include township approval, state stormwater and erosion permits, then building permits.

Who's behind it

Grove City College · A private Christian liberal arts college in Grove City, Pennsylvania, with its own athletics program and a current capital campaign, Impact 150.

Around the web

Planning terms explained
Preliminary/final land development
A combined plan review in which the municipality checks the site layout, drainage, parking and access before work can start.
Synthetic turf
An artificial grass surface that drains well and needs less upkeep than natural grass.
Stormwater permit
A state-regulated approval for controlling runoff and erosion when land is disturbed.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Pine Township supervisors would normally make the final decision on a land development plan, and residents can usually comment at their public meetings; no hearing date was found.

In Pennsylvania, Pine Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Pine Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.