[Mercer County](https://plannednearby.com/c/mercer-pa/) · [City of Sharon](https://plannednearby.com/c/mercer-pa/city-of-sharon) · #2026-07-bolt-storage-6-000-sq-ft-self-storage-bu

# Bolt Storage 6,000 sq ft self-storage building

City of Sharon, PA · 6,000 sq ft non-residential, warehouse & storage

In short: **Bolt Storage 6,000 sq ft self-storage building** is a warehouse and storage development in City of Sharon, Mercer County, PA. It would add 6,000 sq ft of non-residential space. Its estimated construction value is about $780K, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Sharon City Council: final land development plan vote (October 21, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Sharon City Council: final land development plan vote · Oct 21, 2026 · [source](https://www.cityofsharon.net/media/Meetings/2026%20Meetings/10212026%20Council%20Meeting%20Agenda.pdf)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Bolt Storage proposes a 6,000 sq ft self-storage building in the City of Sharon. The building would be placed in an existing gravel footprint.

- **Applicant:** Bolt Storage
- **Plan type:** Preliminary/Final site improvement plan
- **Land use:** warehouse

## Project history

- **2026-10-21** · Sharon City Council · Final land development plan vote · [source](https://www.cityofsharon.net/media/Meetings/2026%20Meetings/10212026%20Council%20Meeting%20Agenda.pdf)
- **2026-07-21** · #2026-07-bolt-storage-6-000-sq-ft-self-storage-bu · Preliminary/Final site improvement plan · 6,000 sq ft

[County plan review office →](https://www.mcrpc.com/)

Map pin is approximate.

## The full picture AI research · Nov 21, 2026

Bolt Storage has proposed a new self-storage building of about 6,000 square feet in the City of Sharon. County records say it would go on a spot that is already a gravel area, so little untouched ground would be cleared. The records reviewed do not give a street address for the new building.

Bolt Storage already runs a storage facility in Sharon at 580 Gamble Court. Its own website lists only that site. A second listing on storage directories gives 251 Wheeler Place. Nothing found ties either address to this proposal, so the new building may or may not be next to one of them.

The county planning commission reviewed the plan on July 21, 2026. The final plan was set for a Sharon City Council vote on October 21, 2026. The council agenda and the planning minutes could not be read as text, and no news report or minutes gave the result of that vote. No sign of construction or opening was found.

### What it could mean nearby

- Self-storage buildings usually bring little daily traffic. Bolt's listings describe its Sharon site as unstaffed, which suggests few on-site jobs.
- Using an existing gravel footprint means little new ground would be disturbed, according to the county summary.
- No records or sources found describe effects on schools, housing or utilities.

### Where it stands

The county planning commission reviewed the plan on July 21, 2026, and the final land development plan was scheduled for a Sharon City Council vote on October 21, 2026. The outcome of that vote was not found, so the project is shown as still in review. A building permit and construction would usually follow an approval.

- **Oct 21, 2026** Sharon City Council scheduled to vote on the final land development plan (result not found)
- **Jul 21, 2026** County planning commission reviewed the preliminary/final site improvement plan

### Who's behind it

[Bolt Storage](https://boltstorage.com/) · A self-storage operator with locations in several states, including an existing unstaffed facility in Sharon; trade press describes its growth as mostly through buying existing facilities.

### Around the web

- [Sharon City Council Meeting Agenda, October 21, 2026](https://www.cityofsharon.net/media/Meetings/2026%20Meetings/10212026%20Council%20Meeting%20Agenda.pdf) — City of Sharon · Oct 21, 2026Lists the final land development plan vote; the file could not be read as text, so the result is unknown.
- [7/21/26 draft minutes](https://www.mcrpc.com/wp-content/uploads/2026/08/7-21-26_ZS-Minute-DRAFT.pdf) — Mercer County Regional Planning Commission · Jul 21, 2026Draft minutes of the July 21 meeting, which reviewed the Bolt Storage plan; the file could not be read as text.
- [Bolt Storage Sharon, PA](https://boltstorage.com/self-storage/sharon-pa/) — Bolt StorageThe company's page lists one Sharon location at 580 Gamble Court and mentions no new building or expansion.
- [Bolt Storage - 580 Gamble Court](https://www.rentcafe.com/storage/pa/sharon/bolt-storage-580-gamble-court/default.aspx) — RentCafeShows an existing, operating, unstaffed Bolt facility in Sharon with no mention of a new building.
- [Bolt Self Storage in Sharon, PA](https://neighbor.com/facility/pennsylvania/sharon/bolt-self-storage/251-wheeler-pl/23575) — NeighborA listing gives a second Bolt facility address in Sharon, at 251 Wheeler Place.

Planning terms explained

- **Land development plan:** A detailed site plan a city reviews before a new building can be built, covering layout, parking, drainage and access.
- **Preliminary/final plan:** A single submission that combines the early and final reviews, often used for small projects.
- **Footprint:** The ground area a building or paved surface covers.
- **County planning commission:** A regional advisory body that reviews plans and sends comments to the municipality, which makes the final decision.

Researched by AI from public sources on Nov 21, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Sharon City Council makes the final decision on the land development plan, and comments can be made at its public meetings or to the city.

In Pennsylvania, City of Sharon decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the City of Sharon planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the City of Sharon manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find City of Sharon's meeting agendas →](https://www.google.com/search?q=City+of+Sharon+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$780K**

- ~60 roofing squares (assumes 1 story)
- ~15 tons of cooling (rule of thumb 400 sq ft/ton)

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Mercer Node Phase 1 80 MW substation](https://plannednearby.com/x/mercer-2026-03-mercer-node-phase-1-80-mw-substation) — same area · other · City of Sharon · filed 2026-03-17
- [1,700 sq ft commercial garage at Stambaugh and Division](https://plannednearby.com/x/mercer-2025-09-1-700-sq-ft-commercial-garage-at-stambau) — same area · 1,700 sq ft non-residential, retail & commercial · City of Sharon · filed 2025-09-16
- [Commercial garage minor LDP at 986 Stambaugh](https://plannednearby.com/x/mercer-2025-09-commercial-garage-minor-ldp-at-986-stamb) — same area · retail & commercial · City of Sharon · filed 2025-09-23
- [Mercer Node Phase 1, 80 MW substation, Sharon](https://plannednearby.com/x/mercer-2026-04-mercer-node-phase-1-80-mw-substation-sha) — same area · other · City of Sharon · filed 2026-04-21
- [6,015 sq ft addition, Joshua's Haven, Sharon](https://plannednearby.com/x/mercer-2026-11-6-015-sq-ft-addition-joshua-s-haven-shar) — same area · 6,015 sq ft non-residential, institutional · City of Sharon · filed 2026-11-17
- [Preliminary plan, Mercer Node Phases II and III](https://plannednearby.com/x/mercer-2026-04-preliminary-plan-mercer-node-phases-ii-a) — same area · other · City of Sharon · filed 2026-04-21

[See everything nearby on a map →](https://plannednearby.com/near#41.22260,-80.50269,City%20of%20Sharon)

---

Source page: https://plannednearby.com/x/mercer-bolt-storage-6-000-sq-ft-self-storage-bu-d21c24

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
