[Mercer County](https://plannednearby.com/c/mercer-pa/) · [Pymatuning](https://plannednearby.com/c/mercer-pa/pymatuning) · #2026-05-edgewood-medical-site-plan-lot-depth-mod

# Edgewood Medical site plan, lot depth modification

Pymatuning, PA · 7,936 sq ft non-residential, office · 0.9 acres

In short: **Edgewood Medical site plan, lot depth modification** is an office development in Pymatuning, Mercer County, PA. It would add 7,936 sq ft of non-residential space on 0.9 acres. Its estimated construction value is about $2.4M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Site plan with SALDO modification request reviewed at a meeting of the county planning commission (May 19, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Site plan with SALDO modification request reviewed at a meeting of the county planning commission · May 19, 2026 · [source](https://www.mcrpc.com/)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Edgewood Medical proposes a 7,936 sq ft building with parking and access on Lot 2A in Pymatuning. Lot 2A is about 0.910 acres (roughly 92 ft by 427 ft), and the plan requests a modification from the 4:1 depth-to-width lot standard.

- **Applicant:** Edgewood Medical
- **Plan type:** Site plan with SALDO modification request
- **Land use:** office

## Project history

- **2026-05-19** · #2026-05-edgewood-medical-site-plan-lot-depth-mod · Site plan with SALDO modification request · 7,936 sq ft

[County plan review office →](https://www.mcrpc.com/)

Map pin is approximate.

## The full picture AI research · Nov 21, 2026

Edgewood Medical has asked Mercer County for review of a plan to build a 7,936 sq ft office building, with parking and driveway access, on Lot 2A in Pymatuning Township. The lot is about 0.91 acres, roughly 92 ft wide and 427 ft deep.

The county's subdivision rules say a lot should be no deeper than four times its width. This lot is deeper than that, so the plan asks for an exception to that rule. The county planning commission looked at the request at its May 19, 2026 meeting.

The May 2026 planning commission agenda describes the project as a medical building. No news coverage, builder page, listing, permit record or business listing for this site turned up, so nothing online shows work has started. The planning commission's outcome on the exception request was not found.

### What it could mean nearby

- The lot is long and narrow, so the driveway and parking layout will determine how traffic enters and leaves the site.
- A medical office of this size would probably bring daily patient and staff trips to the area.
- No sources were found on impacts to schools, utilities or open space.

### Where it stands

The county planning commission reviewed the site plan and the lot-shape exception request on 2026-05-19. No later approval, permit or construction was found. Typical next steps are a decision on the exception request, township approval of the plan, and then building and stormwater permits.

- **May 19, 2026** County planning commission reviewed the site plan and the lot depth-to-width modification request

### Who's behind it

Edgewood Medical

### Around the web

- [May Agenda](https://www.mcrpc.com/wp-content/uploads/2026/05/May-Agenda-Website.pdf) — Mercer County Regional Planning Commission · May 19, 2026The agenda lists the Pymatuning Lot 2A site plan (0.910 acres) with a modification request under section 503.8 of the county subdivision ordinance.

Planning terms explained

- **SALDO:** The Subdivision and Land Development Ordinance, which is the local rulebook for how land is divided and built on.
- **Modification:** A formal request for an exception to one of the ordinance's design rules.
- **Depth-to-width standard:** A rule that limits how long and narrow a lot can be, here 4:1.
- **Site plan:** A drawing showing the building, parking, driveways and other site features.
- **Lot 2A:** The parcel's number on a subdivision plan.

Researched by AI from public sources on Nov 21, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The county planning commission reviews the request, and the township's own officials handle local approvals. Residents can contact the commission through mcrpc.com or Pymatuning Township, though no specific hearing was found.

In Pennsylvania, Pymatuning decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Pymatuning planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Pymatuning manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Pymatuning's meeting agendas →](https://www.google.com/search?q=Pymatuning+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$2.4M**

- ~26 roofing squares (assumes 3 stories)
- ~19 tons of cooling (rule of thumb 400 sq ft/ton)

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Edgewood Cath Lab 7,936 sq ft medical building](https://plannednearby.com/x/mercer-edgewood-cath-lab-7-936-sq-ft-medical-bu-300daa) — same area · 7,936 sq ft non-residential, institutional · Pymatuning Township · filed 2026-07-21
- [Cronimet minor land development](https://plannednearby.com/x/mercer-2025-09-cronimet-minor-land-development) — same area · other · Pymatuning Township · filed 2025-09-23
- [18,400 sq ft addition at Reynolds Industrial Park](https://plannednearby.com/x/mercer-18-400-sq-ft-addition-at-reynolds-indust-933dae) — same area · 18,400 sq ft non-residential, industrial · Pymatuning Township · filed 2025-09-16
- [18,400 sq ft addition at Cronimet facility](https://plannednearby.com/x/mercer-18-400-sq-ft-addition-at-cronimet-facili-933dae) — same area · 18,400 sq ft non-residential, industrial · Pymatuning Township · filed 2025-09-16
- [Greenville Reynolds Dev Damascus Site](https://plannednearby.com/x/dep-876522) — same area · industrial · Pymatuning Township · filed 2024-11-25
- [MC Solar final land development plan, West Salem Township](https://plannednearby.com/x/mercer-2024-09-mc-solar-final-land-development-plan-wes) — same area · other · West Salem Township · filed 2024-09-17

[See everything nearby on a map →](https://plannednearby.com/near#41.32179,-80.43384,Pymatuning)

---

Source page: https://plannednearby.com/x/mercer-edgewood-medical-site-plan-lot-depth-mod-d32446

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
