# Solar facility off McCartney Road (5 arrays)

McCartney Road, across parcels in Perry and Fairview Townships, Perry Township, PA · other · 56.0 acres

In short: **Solar facility off McCartney Road (5 arrays)** is a development project in Perry Township, Mercer County, PA. The site is 56.0 acres. As of November 24, 2026, it is approved. Latest record: Official record (www.mcrpc.com): Full commission approved the Preliminary Plan subject to comments on Sep 23, 2025 (September 23, 2025). What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Stage: Approved · Official record (www.mcrpc.com): Full commission approved the Preliminary Plan subject to comments on Sep 23, 2025 · Sep 23, 2025 · [source](https://www.mcrpc.com/wp-content/uploads/2026/01/9-23-2025-Minutes.pdf)

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

## About this project

Encore Renewables proposes a solar energy facility with 5 solar arrays and a 3 MW AC ground-mounted system across two parcels in Perry and Fairview Townships. The project would disturb approximately 56 acres.

- **Applicant:** Encore Renewables
- **Plan type:** Preliminary land development
- **Land use:** other

## Project history

- **2025-09-16** · #2025-09-solar-facility-off-mccartney-road-5-arra · Preliminary land development

[County plan review office →](https://www.mcrpc.com/)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

Encore Renewables proposes a ground-mounted solar facility off McCartney Road. It would sit on two parcels that straddle Perry and Fairview Townships in Mercer County. The county filing describes 5 solar arrays and a 3 MW AC system, roughly enough to power a few hundred homes.

The county says about 56 acres would be disturbed during construction. That is the area worked on, not the total size of the parcels, which the records don't state. The county planning commission approved the preliminary plan, with comments, at its September 23, 2025 meeting.

No news coverage, developer project page, construction notice or operating-site listing was found. Searches turned up only county planning agendas and minutes. A search summary mentioned a different agenda version with 6 arrays, 3 parcels and 18 MW. The agenda and minutes PDFs could not be read here, so that version is unconfirmed and does not replace the county facts above.

### What it could mean nearby

- Inverters and the connection to the power grid are reportedly planned near McCartney Road, so some construction traffic is likely on that road. This comes from a search summary of draft minutes and is unconfirmed.
- Roughly 56 acres would be disturbed, so land now open would become a fenced solar site.
- Solar sites usually bring little day-to-day traffic or school impact once built, but the records here don't address this.

### Where it stands

The county planning commission approved the preliminary plan with comments on September 23, 2025. Next steps usually include meeting those comments, final plan approval, any township approvals and permits, and then construction. No source found shows which of these has happened. Note: A search summary of a different county agenda version described 6 arrays on 3 parcels at 18 MW AC. The agenda PDFs could not be read here, so this is unconfirmed and the county's 5 arrays, 2 parcels and 3 MW are kept.

- **Sep 23, 2025** Full county planning commission approved the preliminary plan subject to comments
- **Sep 16, 2025** Preliminary land development plan reviewed at a county planning commission meeting

### Who's behind it

[Encore Renewables](https://encorerenewableenergy.com/) · A developer of community-scale solar and energy storage projects, with completed projects reported in New York, Vermont and Maine.

### Around the web

- [9-23-2025 Minutes](https://www.mcrpc.com/wp-content/uploads/2026/01/9-23-2025-Minutes.pdf) — Mercer County Regional Planning Commission · Sep 23, 2025Official record of the September 23, 2025 meeting at which the preliminary plan was approved subject to comments.
- [September Agenda](https://www.mcrpc.com/wp-content/uploads/2025/09/September-Agenda-1.pdf) — Mercer County Regional Planning Commission · Sep 2025Agenda listing the project with about 56 acres of disturbance.
- [9-16 ZS Minutes Draft](https://www.mcrpc.com/wp-content/uploads/2025/10/9-16-ZS-Minutes-Draft.pdf) — Mercer County Regional Planning Commission · Sep 16, 2025Draft committee minutes from the September 16, 2025 review of the McCartney Road plan.
- [Encore Renewable Energy](https://encorerenewableenergy.com/) — Encore Renewable EnergyThe developer's own site describes its business, but it shows no McCartney Road project page.

Planning terms explained

- **Preliminary land development plan:** An early formal site plan that the county and township review before final approval.
- **MW AC:** Megawatts of alternating current, the electricity a solar facility can send to the grid.
- **Acres of disturbance:** The ground that would be graded or built on, which can be less than the total parcel size.
- **Ground-mounted array:** A group of solar panels on frames in a field rather than on a roof.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The county planning commission has already acted on the preliminary plan; any remaining approvals would be handled by the Perry and Fairview Township supervisors, so residents can ask each township about upcoming meetings.

In Pennsylvania, Perry Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Perry Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Perry Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Perry Township's meeting agendas →](https://www.google.com/search?q=Perry+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Encore Renewables solar project on Small Rd](https://plannednearby.com/x/mercer-2025-09-encore-renewables-solar-project-on-small) — same area · other · Perry Township · filed 2025-09-23
- [Solar facility off Small Road (3 arrays)](https://plannednearby.com/x/mercer-solar-facility-off-small-road-3-arrays-e2a28f) — same area · other · Perry Township · filed 2025-09-16
- [Brazen Contracting: stormwater basin and two warehouses](https://plannednearby.com/x/mercer-brazen-contracting-stormwater-basin-and-90556b) — same area · warehouse & storage · New Vernon Township · filed 2026-07-21
- [Sunrise Solar (Forrester Rd.) screening removal request](https://plannednearby.com/x/mercer-sunrise-solar-forrester-rd-screening-rem-6f3ef3) — same area · other · Fairview Township · filed 2025-08-19
- [Minor SALDO adjustment (easement) at 55 Ray Rd](https://plannednearby.com/x/mercer-minor-saldo-adjustment-easement-at-55-ra-1dcbaa) — same area · lot line change · Mercer County (town not stated) · filed 2026-06-16
- [SALDO review, 55 Ray Road](https://plannednearby.com/x/mercer-2026-04-saldo-review-55-ray-road) — same area · other · Mercer County (town not stated) · filed 2026-04-21

[See everything nearby on a map →](https://plannednearby.com/near#41.39258,-80.21538,Perry%20Township)

---

Source page: https://plannednearby.com/x/mercer-solar-facility-off-mccartney-road-5-arra-e2a28f

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.