Mercer County · Perry Township · #2025-09-solar-facility-off-small-road-3-arrays · Solar farms tracker
Solar facility off Small Road (3 arrays)
Small Road, Perry Township, PA · other · 24.0 acres
In short: Solar facility off Small Road (3 arrays) is a development project in Perry Township, Mercer County, PA. The site is 24.0 acres. As of November 24, 2026, it is in review. Latest record: Preliminary land development reviewed at a meeting of the county planning commission (September 16, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
Encore Renewables proposes a solar energy facility off Small Road with 3 solar arrays and a 3 MW AC ground-mounted system. The project would disturb approximately 24 acres.
- Applicant
- Encore Renewables
- Plan type
- Preliminary land development
- Land use
- other
Project history
- 2025-09-16 · #2025-09-solar-facility-off-small-road-3-arrays · Preliminary land development
Map pin is approximate.
The full picture AI research · Nov 9, 2026
Encore Renewables has filed a plan for a ground-mounted solar energy facility off Small Road in Perry Township, Mercer County. It would have three separate solar arrays and produce about 3 megawatts of alternating-current power, which is a small, community-scale system.
The county records say construction would disturb about 24 acres. That is the area where the ground would be worked, not the total size of the property. The records don't give the full parcel size.
The county planning commission reviewed the preliminary land development plan in September 2025. The same developer also had a separate five-array solar plan on McCartney Road (Perry and Fairview townships) on that agenda. No news coverage, developer project page, construction notice or sign of an operating facility was found for the Small Road site.
What it could mean nearby
- Solar facilities generate very little traffic once built. Most trips come during construction.
- About 24 acres of ground would be disturbed, so stormwater and erosion controls would matter.
- The records show no new homes, and nothing found points to a school impact.
Where it stands
The county planning commission has reviewed the preliminary land development plan, which is an advisory step, and the minutes suggest the motion carried. The township's own approval and any state stormwater permits would normally follow before construction starts. No source found shows those steps have happened.
- Sep 23, 2025 County planning commission meeting minutes record the Small Road preliminary land development review
- Sep 16, 2025 Latest county filing date for the project
Who's behind it
Encore Renewables · A solar developer; Encore Renewable Energy, a Vermont-based company that builds community-scale solar, may be the same firm, but the sources found did not confirm this.
Around the web
- 9-23-2025 MinutesMercer County Regional Planning Commission · Sep 23, 2025Records the Small Road solar plan review with 3 arrays and about 24 acres of disturbance.
- September Agenda RevisedMercer County Regional Planning Commission · Sep 23, 2025The agenda lists two Encore Renewables preliminary land development items in Perry Township.
Planning terms explained
- Preliminary land development plan
- An early formal site plan that local officials review before giving final approval to build.
- Solar array
- A group of solar panels installed together on one part of a site.
- 3 MW AC
- The system's rated electrical output is about 3 megawatts of alternating current, which is enough for several hundred homes.
- Acres of disturbance
- The amount of ground that will be graded or worked during construction, which is not necessarily the whole property.
- County planning commission
- A county body that reviews local development plans and gives advice, but the township makes the final local decision.
Researched by AI from public sources on Nov 9, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Perry Township supervisors and planning or zoning officials make the local land development decision, so residents can raise comments at their public meetings or with the township office.
In Pennsylvania, Perry Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Perry Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Perry Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Perry Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Solar facility off McCartney Road (5 arrays)same area · other · Perry Township · filed 2025-09-16
- Encore Renewables solar project on Small Rdsame area · other · Perry Township · filed 2025-09-23
- Brazen Contracting: stormwater basin and two warehousessame area · warehouse & storage · New Vernon Township · filed 2026-07-21
- Sunrise Solar (Forrester Rd.) screening removal requestsame area · other · Fairview Township · filed 2025-08-19
- Minor SALDO adjustment (easement) at 55 Ray Rdsame area · lot line change · Mercer County (town not stated) · filed 2026-06-16
- SALDO review, 55 Ray Roadsame area · other · Mercer County (town not stated) · filed 2026-04-21