PlannedNearby

Bergen County · Edgewater Borough · #0213-23-0001.1 · Large housing developments (100+ homes) tracker

194-unit multi-use development with hotel and restaurant

163 & 135 Old River Road, Edgewater Borough, NJ · 194 homes, mixed use

In short: 194-unit multi-use development with hotel and restaurant is a mixed-use development at 163 & 135 Old River Road in Edgewater Borough, Bergen County, NJ. It would add 194 homes. Its estimated construction value is about $46.6M, a rough estimate from its size. As of November 24, 2026, it is approved according to web research. Latest record: A commercial listing calls the 143-room hotel at 163 Old River Road fully approved, and the NJDEP flood hazard permit was approved on 2025-06-26 in the county… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved A commercial listing calls the 143-room hotel at 163 Old River Road fully approved, and the NJDEP flood hazard permit was approved on 2025-06-26 in the county records. · web research checked Nov 10, 2026 · source AI research
  1. Proposed
  2. In reviewJun 2023
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

A multi-use development at 163 and 135 Old River Road in Edgewater Borough would include 194 residential units, a 143-room hotel, and a 230-seat restaurant.

Official description: A multi-use development is proposed with 194 residential units, a 143-room hotel, and a 230-seat restaurant.

Applicant
Three Y LLC
Plan type
State environmental permit application (NJDEP)
Land use
Mixed use
Status
approved

Project history

  • 2025-06-26 · #0213-23-0001.1 · State environmental permit application (NJDEP) · 194 lots/units
  • 2025-06-26 · NJDEP flood hazard permit 0213-23-0001.1: approved · source
  • 2023-06-27 · NJDEP flood hazard permit 0213-23-0001.1: application filed · source

County plan review office →

The full picture AI research · Nov 10, 2026

The plan covers the Old River Road and River Road waterfront area in Edgewater. It is a single mixed-use project with 194 apartments, a 143-room hotel and a 230-seat restaurant. A 2023 borough planning memo describes it as a 13-story building. The county record lists the addresses as 163 and 135 Old River Road.

The borough's zoning board first approved an earlier version in July 2021. That version had about 150 homes, 170 hotel rooms and a rooftop restaurant with a pool. The developer later amended the plan to the current mix. A nearby business owner sued to block the 2021 approval. No result for that case was found.

A commercial listing markets the hotel portion as fully approved and available to buy. No sign of construction was found.

What it could mean nearby

Where it stands

The project has local zoning approval, and the state flood hazard permit was approved on 2025-06-26. No building permits or construction were found. Next steps usually include final site plan compliance, building permits and then construction. Note: The 2021 approval described by local news had about 150 homes and 170 hotel rooms, while the county record and a 2023 borough memo show 194 homes and 143 rooms, which looks like a later amended plan.

Who's behind it

Three Y LLC · The company is named as the applicant in local news coverage of the 2021 approval. Nothing was found about its other projects.

Around the web

Planning terms explained
Zoning Board of Adjustment
A local board that can grant exceptions to zoning rules, such as extra height or a use not normally allowed.
Flood hazard permit
A state permit that allows building in or near flood-prone areas, such as along a river.
Mixed use
A project combining different uses, such as homes, a hotel and a restaurant.
Amended site plan
A revised version of a plan that was already approved.

Researched by AI from public sources on Nov 10, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Edgewater's land use boards decide local questions, and residents can raise concerns at public meetings. No upcoming hearing on this project was found.

In New Jersey, the Edgewater Borough planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Edgewater Borough's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $46.6M

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →