Bergen County · Hackensack City · #0223-25-0004.1

7-story mixed-use building

132-148 Main Street, Hackensack City, NJ · mixed use

In short: 7-story mixed-use building is a mixed-use development at 132-148 Main Street in Hackensack City, Bergen County, NJ. As of November 24, 2026, it is approved according to web research. Latest record: Local coverage reports the Hackensack planning board approved the seven-story plan, and the county record shows the state flood permit approved on 2025-08-28. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved Local coverage reports the Hackensack planning board approved the seven-story plan, and the county record shows the state flood permit approved on 2025-08-28. · web research checked Nov 11, 2026 · source AI research
  1. Proposed
  2. In reviewMay 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

A 7-story mixed-use building at 132-148 Main Street in Hackensack, partly within the tidal flood plain of the Hackensack River.

Official description: Constructs a 7-story mixed-use building partially located in the tidal flood plain of the Hackensack River.

Applicant
The Sapphire Ure LLC
Plan type
State environmental permit application (NJDEP)
Land use
Mixed use
Status
approved

Project history

  • 2025-08-28 · #0223-25-0004.1 · State environmental permit application (NJDEP)
  • 2025-08-28 · NJDEP flood hazard permit 0223-25-0004.1: approved · source
  • 2025-05-29 · NJDEP flood hazard permit 0223-25-0004.1: application filed · source

County plan review office →

The full picture AI research · Nov 11, 2026

The Sapphire is a proposed seven-story building at 132-148 Main Street in Hackensack, next to the bus terminal. Reports describe about 100 rental apartments, roughly 5,600 sq ft of ground-floor shops, restaurant space and about 7,800 sq ft of rooftop offices. The site is currently vacant land of about 36,500 sq ft.

The city planning board approved the plan in spring 2025. It replaced an earlier, much taller plan for 17 stories and 253 apartments. Part of the site lies in the tidal flood plain of the Hackensack River. The state environmental agency approved a flood hazard permit on 2025-08-28.

A commercial listing gives a 2027 completion date. It also still shows the older 253-unit figure, so it may be out of date. No source found shows construction has started.

What it could mean nearby

Where it stands

The city planning board approved the site plan in 2025, and the state flood hazard permit was approved on 2025-08-28. Building permits and construction usually follow, but no source found confirms either. Note: A LoopNet listing and flyer show 253 units and a summer 2027 completion, while news coverage of the approval describes a scaled-down plan of about 100 units.

Who's behind it

The Sapphire Urban Renewal LLC (Enburg Development); the county filing lists The Sapphire Ure LLC · Local coverage names Enburg Development as the developer, and a second report says the project shares ownership with the neighboring high-rise called the Brick.

Around the web

Planning terms explained
Flood hazard permit
A state environmental approval needed to build in or near a flood-prone area such as a river's flood plain.
Tidal flood plain
Low land beside a tidal river that can flood when high tides or storms raise the water.
Site plan approval
A planning board's approval of a project's layout, size, parking and design.
Urban renewal entity
A special-purpose company used for redevelopment projects, often tied to tax incentives.
Mixed-use
A building combining different uses, such as homes, shops and offices.

Researched by AI from public sources on Nov 11, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Hackensack Planning Board decides site-plan matters, and residents can comment at its public meetings. Contact the city clerk for agendas.

In New Jersey, the Hackensack City planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Hackensack City's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.