PlannedNearby

Bergen County · Palisades Park Borough · #0245-25-0002.1 · Large housing developments (100+ homes) tracker

510-unit mixed-use development

21 Grand Avenue, Palisades Park Borough, NJ · 510 homes, mixed use

In short: 510-unit mixed-use development is a mixed-use development at 21 Grand Avenue in Palisades Park Borough, Bergen County, NJ. It would add 510 homes. Its estimated construction value is about $122.4M, a rough estimate from its size. As of November 24, 2026, it is approved according to web research. Latest record: Jersey Digs reported on June 1, 2026 that the Palisades Park Planning Board approved the 510-unit Grandline project and that no construction timeline has been… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved Jersey Digs reported on June 1, 2026 that the Palisades Park Planning Board approved the 510-unit Grandline project and that no construction timeline has been announced. · web research checked Nov 19, 2026 · source AI research
  1. Proposed
  2. In reviewJun 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

A mixed-use development with ground-level retail and 510 residential units has been approved at 21 Grand Avenue in Palisades Park, along with a parking structure and site improvements.

Official description: Construction of a mixed-use development with ground-level retail, 510 residential units, a parking structure, utilities, stormwater improvements, sidewalks, and landscaping.

Applicant
Leem's Corp
Plan type
State environmental permit application (NJDEP)
Land use
Mixed use
Status
approved

Project history

  • 2026-02-20 · #0245-25-0002.1 · State environmental permit application (NJDEP) · 510 lots/units
  • 2026-02-20 · NJDEP flood hazard permit 0245-25-0002.1: approved · source
  • 2025-06-24 · NJDEP flood hazard permit 0245-25-0002.1: application filed · source

County plan review office →

The full picture AI research · Nov 19, 2026

The Grandline is a large mixed-use project approved for 21 Grand Avenue in Palisades Park. It would replace an existing shopping complex on a site of about 6.2 acres. The site sits between Grand Avenue, West Ruby Avenue and Route 46.

Plans described in news coverage call for two towers of 17 and 19 stories with 510 apartments, 102 of them set aside as affordable. They also call for roughly 175,000 square feet of shops and a plaza on two levels, plus a wellness center and rooftop amenity spaces. The county summary also mentions a parking structure, which the news coverage reviewed does not describe.

The Planning Board approved the project, according to coverage from early June 2026. No opposition was reported. As of this research, no groundbreaking or construction has been reported, and no construction timeline has been announced.

What it could mean nearby

Where it stands

The Planning Board has approved the project, and the flood hazard permit from NJDEP was approved in February 2026. No building permits, groundbreaking or construction have been reported. Detailed construction approvals and demolition permits usually come next. Note: Reports differ on the developer: Jersey Digs names LEEMS Corp as developer with March Associates as construction firm, while New York YIMBY lists March Associates as developer and LEEMS Corp as owner.

Who's behind it

Leem's Corp · Leem's Corp is the property owner and developer named in coverage of The Grandline; no company website or other projects were found.

Around the web

Planning terms explained
Site plan
A detailed drawing of how a property will be laid out, including buildings, parking, driveways and landscaping, which the Planning Board reviews.
Flood hazard permit
A state permit from NJDEP required for building in or near flood-prone areas or waterways.
Affordable units
Apartments with rents restricted so lower- and moderate-income households can afford them.
Builder's remedy
A legal settlement route in New Jersey that lets a developer build at higher density if a town has not met its affordable housing obligations.
Planning Board
The local body that reviews development plans and decides whether to approve them.

Researched by AI from public sources on Nov 19, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Palisades Park Planning Board has already approved the project; questions about later construction steps can go to the borough's Building Department.

In New Jersey, the Palisades Park Borough planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Palisades Park Borough's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $122.4M

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →