Burlington County · Pemberton Township · #0329-21-0001.1 · Warehouses and distribution centers tracker

Two warehouse buildings

2554 Highway 206, Pemberton Township, NJ · 486,850 sq ft non-residential, warehouse & storage

In short: Two warehouse buildings is a warehouse and storage development at 2554 Highway 206 in Pemberton Township, Burlington County, NJ. It would add 486,850 sq ft of non-residential space. Its estimated construction value is about $63.3M, a rough estimate from its size. As of November 24, 2026, it is approved according to web research. Latest record: The NJDEP wetlands permit was approved on 2025-03-12, and a January 2026 trade article says the project is being marketed with no construction timeline… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved The NJDEP wetlands permit was approved on 2025-03-12, and a January 2026 trade article says the project is being marketed with no construction timeline announced. · web research checked Nov 11, 2026 · source AI research
  1. Proposed
  2. In reviewJul 2023
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

Two warehouses with footprints of 115,500 and 371,350 square feet have been approved at 2554 Highway 206 in Pemberton Township, with paved parking, landscaping, lighting, and stormwater management.

Official description: Construction of two warehouses with footprints of 115,500 SF and 371,350 SF, plus paved parking, landscaping, lighting, and stormwater management.

Applicant
Rockefeller Group Development Corporation
Plan type
State environmental permit application (NJDEP)
Land use
Warehouse & storage
Status
approved

Project history

  • 2025-03-12 · #0329-21-0001.1 · State environmental permit application (NJDEP)
  • 2025-03-12 · NJDEP freshwater wetlands permit 0329-21-0001.1: approved · source
  • 2023-07-18 · NJDEP freshwater wetlands permit 0329-21-0001.1: application filed · source

County plan review office →

The full picture AI research · Nov 11, 2026

Rockefeller Group Development Corporation plans two warehouse buildings at 2554 Highway 206 (Route 206) in Pemberton Township. One would be about 115,500 square feet and the other about 371,350 square feet, for roughly 486,850 square feet in all. The site is about 100 acres. Plans include paved parking, landscaping, lighting and stormwater controls.

The project is branded 206 Logistics Center. A January 2026 trade article said it is being marketed for lease, sale or build-to-suit, with no tenant named and no construction timeline announced. Commercial listing sites show both buildings as available for lease. Those listings describe planned buildings with high ceilings and many loading docks. No source found shows that construction has started.

What it could mean nearby

Where it stands

The state freshwater wetlands permit was approved on 2025-03-12, and the project is being marketed to tenants and buyers. Construction would normally follow once a user is found and remaining building permits are issued, but no start has been announced.

Who's behind it

Rockefeller Group Development Corporation · A New York-based real estate developer that builds industrial and logistics projects, including other warehouse sites along Route 206 in Burlington County.

Around the web

Planning terms explained
Freshwater wetlands permit
A state environmental permit that allows limited work in or near protected wetlands.
Stormwater management
Systems such as basins that control rain runoff from roofs and pavement.
Build-to-suit
A building designed and built to a specific tenant's needs.
Class A warehouse
A modern, high-quality warehouse with tall ceilings and many loading docks.

Researched by AI from public sources on Nov 11, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: No pending public hearing was found; questions can go to Pemberton Township's land use officials, and any future site changes would go before the township planning board.

In New Jersey, the Pemberton Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Pemberton Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $63.3M