In short: 532-unit apartment and townhouse development is an apartment development at Chews Landing Rd & Sicklerville Rd in Winslow Township, Camden County, NJ. It would add 532 homes. Its estimated construction value is about $127.7M, a rough estimate from its size. As of November 24, 2026, it is permitted (building or site permits issued) according to web research. Latest record: The county record shows the state freshwater wetlands permit was approved on 2025-03-04, which is the latest event found. What usually happens next: site work and construction.
Usually next: site work and construction.
About this project
An outfall structure and minor grading for a residential development in Winslow Township at Chews Landing Road and Sicklerville Road, including 276 apartment units and 256 townhouse units.
Official description: Construct an outfall structure and minor grading for a residential development of 276 apartment units and 256 townhouse units.
- Plan type
- State environmental permit application (NJDEP)
- Land use
- Apartments
- Status
- approved
The full picture AI research · Nov 10, 2026
The county record describes a residential development in Winslow Township, Camden County, at Chews Landing Road and Sicklerville Road. It would hold 532 homes: 276 apartments and 256 townhouses. The county filing covers only an outfall structure, which is a drainage outlet that carries stormwater away from the site, and minor grading.
The state environmental department (NJDEP) approved a freshwater wetlands permit for the work on 2025-03-04. The application was filed on 2024-03-27.
No news coverage, developer page, township agenda or minutes, listing, or construction notice was found for this exact site. The plan's current use, owner and developer could not be confirmed. The page below the record link could not be opened because of a security check, so the county facts are the only ones used here.
What it could mean nearby
- Adding 532 homes would likely increase traffic on Chews Landing Road and Sicklerville Road, though no traffic study was found.
- The outfall and grading work suggest stormwater drainage and nearby wetlands are a design concern, and the wetlands permit addresses that.
- School, utility and job effects could not be assessed because no sources give details.
Where it stands
The only approval found is the state wetlands permit for the outfall and grading, issued 2025-03-04. Township site-plan approval, construction permits and any start of building were not found, and these usually come next.
- Mar 4, 2025 NJDEP freshwater wetlands permit 0436-04-0002.10 approved
- Mar 27, 2024 Wetlands permit application filed
Around the web
- NJDEP freshwater wetlands permit 0436-04-0002.10New Jersey State Library · Mar 4, 2025This is the county-listed record of the wetlands permit application and approval (the page itself could not be opened).
Planning terms explained
- Outfall structure
- A built outlet, such as a pipe end or channel, where stormwater leaves a site and flows into a stream or basin.
- Freshwater wetlands permit
- A state approval needed to build in or near protected wetlands.
- Grading
- Reshaping the land's surface so it drains properly and is ready for building.
- Site plan approval
- A local board's approval of a project's layout, including buildings, roads, parking and drainage.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 10, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Winslow Township Planning Board normally hears site plans for projects like this, and residents can comment at its public meetings, but no hearing for this project was found.
In New Jersey, the Winslow Township planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.
- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.
Find Winslow Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $127.7M
- ~3,192 roofing squares
- ~532 HVAC systems
- ~532 kitchens / 1,064+ bathrooms
- ~532,000 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Business building in Monroe Township1.7 mi · 11,107 sq ft non-residential, office · Monroe Township · filed 2026-07-07
- Residential and commercial subdivision with 349 homes1.9 mi · 349 homes, mixed use · Monroe Township · filed 2025-04-04
- Black Horse Pike site, Monroe Township2.7 mi · 9,916 sq ft non-residential, office · Monroe Township · filed 2025-08-14
- 53 North Route 732.9 mi · 10,140 sq ft non-residential, office · Winslow Township · filed 2026-06-10
- 105 North Route 733.0 mi · 18,146 sq ft non-residential, warehouse & storage · Winslow Township · filed 2024-11-04
- 125 Virginia Ave4.0 mi · 14,839 sq ft non-residential, office · Monroe Township · filed 2026-01-14