Cumberland County · Bridgeton City · #0600-05-0001.3 · Large housing developments (100+ homes) tracker
242-unit apartment and commercial development
61 Cornwell Dr, Bridgeton City, NJ · 242 homes, mixed use
In short: 242-unit apartment and commercial development is a mixed-use development at 61 Cornwell Dr in Bridgeton City, Cumberland County, NJ. It would add 242 homes. Its estimated construction value is about $58.1M, a rough estimate from its size. As of November 24, 2026, it is approved according to web research. Latest record: A summary of the Upper Deerfield Planning Board's June 15, 2026 minutes says the board found good cause and extended the earlier final approval and variances… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
An extension of site development at 61 Cornwell Drive in Bridgeton proposes 242 apartment units along with a self-storage facility, a package goods store and a sports bar.
Official description: Proposes an extension of site development with 242 apartment units plus a self-storage facility, package goods store and sports bar.
- Plan type
- State environmental permit application (NJDEP)
- Land use
- Mixed use
- Status
- application
Project history
- 2026-06-03 · #0600-05-0001.3 · State environmental permit application (NJDEP) · 242 lots/units
- 2026-06-03 · NJDEP flood hazard permit 0600-05-0001.3: application filed · source
The full picture AI research · Nov 18, 2026
The county records describe an extension of site development at 61 Cornwell Drive. The plan is 242 apartments, a self-storage facility, a package goods store and a sports bar. The site is known as Bristol Ponds. Township records place it in Upper Deerfield Township, though the county lists it under Bridgeton's mailing address. A broker listing describes about 240 apartments, 18,000 sq ft of retail and 27,000 sq ft of self-storage on roughly 51 acres.
Upper Deerfield's planning board took up the owner's request for a two-year extension of its earlier final subdivision approval, with variances, on June 15, 2026. A search summary of the minutes says the extension was granted, retroactive from May 16, 2026 to May 15, 2028. The board's own PDFs could not be read directly. The latest county filing is an application to the state for a flood hazard permit.
No listings, leasing pages, news of construction or business openings turned up. A property database still labels the address a warehouse, so the site appears to be undeveloped or not yet built out.
What it could mean nearby
- Left turns from Cornwell Drive, a county road, onto Ponds Road were raised in earlier board discussion, so traffic and access are likely issues.
- About 240 new apartments, plus retail, a bar and storage, would add housing and some local jobs.
- The flood hazard permit filing suggests parts of the site are near regulated flood areas or waterways.
Where it stands
The site has had local approvals since about 2021 and was granted an extension to May 2028, according to a summary of the June 2026 minutes. The state flood hazard permit is still under review, and building permits and construction would normally follow. Note: County records place the project in Bridgeton City, but township planning records show it was reviewed by the Upper Deerfield Township Planning Board, and the broker listing gives 240 apartments rather than 242.
- Jun 15, 2026 Upper Deerfield Planning Board took up the request to extend the Bristol Ponds approval to May 2028 (application P-4-2026); extension reported as granted
- Jun 3, 2026 State flood hazard permit application filed
- May 16, 2026 Previous approval extension expired
- 2023 Earlier extension granted under Resolution 6-2023
- Mar 2021 Planning board hearing on Bristol Ponds subdivision and site plan with variances
Who's behind it
AB Bridgeton, LLC · The planning board agenda names it as the owner of part of the Bristol Ponds site, and no company website or other projects were found.
Around the web
- 06 15 26 MinutesUpper Deerfield Township · Jun 15, 2026Minutes of the planning board meeting that covered the Bristol Ponds extension request; the outcome comes from a search summary because the PDF could not be read.
- June 15 2026 AgendaUpper Deerfield Township · Jun 15, 2026Agenda lists application P-4-2026 for Bristol Ponds at 61 Cornwell Drive, requesting an extension of final approval with variances.
- March 15 2021 meetingUpper Deerfield Township · Mar 15, 2021Records the earlier hearing on the Bristol Ponds subdivision and site plan, including the variances and the Cornwell Drive access issues.
- Bristol Ponds listingRevere CREBroker listing for the site describing about 240 apartments, retail and self-storage on roughly 51 acres, per search summary.
- Property Record 61 Cornwell DrLoopNetProperty database record lists the address as a warehouse on about 4 acres, with no sign of new apartments.
Planning terms explained
- Final major subdivision approval
- The board's last sign-off on dividing land into lots and the plan for building on them.
- Variance
- Permission to depart from a local zoning rule, such as a minimum lot frontage.
- Flood hazard permit
- A state permit for building in or near flood-prone areas or waterways.
- Approval extension
- More time for a developer to start work before an approval expires.
- PILOT
- A payment in lieu of taxes, a negotiated payment that replaces regular property taxes.
Researched by AI from public sources on Nov 18, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Upper Deerfield Township Planning Board handled the approvals and meets publicly, so comments would go to the township. The state environmental agency runs the flood hazard permit review.
In New Jersey, the Bridgeton City planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.
- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.
Find Bridgeton City's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $58.1M
- ~1,452 roofing squares
- ~242 HVAC systems
- ~242 kitchens / 484+ bathrooms
- ~242,000 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- 1147 Highway 771.0 mi · 80,179 sq ft non-residential, industrial · Upper Deerfield Township · filed 2025-03-28
- 1274 and 1276 Highway 77 storage building1.9 mi · 24,000 sq ft non-residential, warehouse & storage · Upper Deerfield Township · filed 2024-07-24
- Building permit (new construction) in Upper Deerfield Township2.1 mi · 249,107 sq ft non-residential, warehouse & storage · Upper Deerfield Township · filed 2024-08-09
- 64-unit senior living building2.3 mi · 64 homes, senior living · Bridgeton City · filed 2026-06-29
- Accessory structures at 46 Shoemaker Rd2.5 mi · 21,600 sq ft non-residential, other · Hopewell Township · filed 2025-05-14
- 1019 Parsonage Rd storage building2.6 mi · 201,600 sq ft non-residential, warehouse & storage · Upper Deerfield Township · filed 2026-06-16