Hudson County · Bayonne City · #0901-04-0001.2 · Large housing developments (100+ homes) tracker
299-unit residential buildings with retail
35 Avenue A, Bayonne City, NJ · 299 homes, mixed use
In short: 299-unit residential buildings with retail is a mixed-use development at 35 Avenue A in Bayonne City, Hudson County, NJ. It would add 299 homes. Its estimated construction value is about $71.8M, a rough estimate from its size. As of November 24, 2026, it is approved according to web research. Latest record: A Jersey Digs article from March 2024 reports the Planning Board approved the two-building, 299-apartment plan, and the county record shows the state… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
Two six-story residential buildings with 299 units, an integrated parking garage, and retail space at 35 Avenue A in Bayonne, located in a regulatory flood hazard area.
Official description: Two six-story residential buildings with 299 units, an integrated parking garage, and retail space, located in the regulatory flood hazard area.
- Plan type
- State environmental permit application (NJDEP)
- Land use
- Mixed use
- Status
- approved
The full picture AI research · Nov 10, 2026
The developer plans two six-story apartment buildings with 299 homes at 35 Avenue A in Bayonne. The site is the former Caschem chemical plant, near the Bayonne Bridge. The buildings would be linked by an indoor pool that spans Gertrude Street. One building would have 177 apartments and a restaurant space. The other would have 122 apartments and a ground-floor coffee shop.
The plans also show about 224 parking spaces, roof terraces and amenity space. The site is in a flood hazard area, so the state environmental agency had to approve a waterfront development permit. That permit was approved on 2025-09-17.
Bayonne's Planning Board approved the project in early 2024. Local coverage also describes the City Council approving a 25-year tax agreement (a PILOT) for it. No news of a groundbreaking, construction or leasing was found.
What it could mean nearby
- The 299 new apartments would add housing on a former industrial site.
- Restaurant and coffee-shop space on the ground floor would add local retail.
- About 224 parking spaces are planned in the garage, which is fewer than one per apartment, so street parking could be a concern.
- The site is in a flood hazard area, so the state permit review covered building there.
Where it stands
The Planning Board approved the project in 2024, and the state waterfront permit was approved on 2025-09-17. No source shows construction started. Building permits and construction usually come next.
- Sep 17, 2025 State waterfront development permit approved
- Nov 7, 2024 State waterfront development permit application filed
- Mar 14, 2024 Jersey Digs reports the Bayonne Planning Board approval of the 299-unit plan
Who's behind it
The Gamal Group · A locally owned Bayonne developer that also owns a large part of the former Caschem property along the Hudson River.
Around the web
- Bayonne Approves Two-Building Complex at Former Caschem SiteJersey Digs · Mar 14, 2024Describes the two six-story buildings with 299 apartments, the developer and the Planning Board approval, and says no construction timeline had been announced.
- 35 Avenue A tag pageJersey DigsLists the coverage of this site.
Planning terms explained
- PILOT
- A payment-in-lieu-of-taxes agreement, where a developer pays the city an agreed amount instead of regular property taxes.
- Waterfront development permit
- A state environmental permit for building near tidal waters or in areas covered by coastal rules.
- Flood hazard area
- A mapped zone where state rules limit and regulate construction because of flood risk.
- Redevelopment plan
- A city-adopted plan that sets the rules for rebuilding a specific site.
Researched by AI from public sources on Nov 10, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: Planning Board approval is already granted, so remaining steps are mostly permits; residents can raise concerns at Bayonne City Council or Planning Board public meetings.
In New Jersey, the Bayonne City planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.
- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.
Find Bayonne City's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $71.8M
- ~1,794 roofing squares
- ~299 HVAC systems
- ~299 kitchens / 598+ bathrooms
- ~299,000 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- 23 Evergreen St accessory structures0.9 mi · 13,834 sq ft non-residential, other · Bayonne City · filed 2025-07-25
- 7 Oak Court West new construction1.0 mi · single-family homes · Bayonne City · filed 2025-07-28
- 90-102 Avenue E1.2 mi · apartments · Bayonne City · filed 2024-02-08
- 197 Avenue E1.4 mi · apartments · Bayonne City · filed 2025-09-30
- Multi-unit residential building1.5 mi · apartments · Bayonne City · filed 2026-09-02
- New residential construction, 111 Avenue F1.6 mi · single-family homes · Bayonne City · filed 2025-12-08