PlannedNearby

Hudson County · Jersey City · #0906-26-0010.1 · Large housing developments (100+ homes) tracker

17-story mixed-use tower, 344 apartments

597 Marin Blvd, Jersey City, NJ · 344 homes, mixed use

In short: 17-story mixed-use tower, 344 apartments is a mixed-use development at 597 Marin Blvd in Jersey City, Hudson County, NJ. It would add 344 homes. Its estimated construction value is about $82.6M, a rough estimate from its size. As of November 24, 2026, it is approved according to web research. Latest record: Local news reports say the Jersey City Planning Board voted 8-1 on July 28, 2026 to approve the project, and no construction timeline has been announced. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved Local news reports say the Jersey City Planning Board voted 8-1 on July 28, 2026 to approve the project, and no construction timeline has been announced. · web research checked Nov 19, 2026 · source AI research
  1. Proposed
  2. In reviewApr 2026
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

A 17-story mixed-use building with retail space, 344 apartments, and 371 hotel units has been approved at 597 Marin Boulevard in Jersey City.

Official description: A 17-story multiuse building with retail space, 344 residential units, and 371 hotel units is proposed.

Plan type
State environmental permit application (NJDEP)
Land use
Mixed use
Status
application

Project history

  • 2026-04-29 · #0906-26-0010.1 · State environmental permit application (NJDEP) · 344 lots/units
  • 2026-04-29 · NJDEP flood hazard permit 0906-26-0010.1: application filed · source

County plan review office →

The full picture AI research · Nov 19, 2026

The proposal is a 17-story building at 597 Marin Boulevard, also addressed as 166 14th Street, near the Holland Tunnel and light rail. It would hold 344 apartments, about 371 hotel rooms and roughly 4,270 square feet of ground-floor shops. About 15% of the apartments would be affordable.

The site now has a gas station and a U-Haul rental facility. The developer is The Namdar Group. It was designated as the site's redeveloper by the Jersey City Redevelopment Agency.

The Planning Board approved the project 8-1 on July 28, 2026. The board granted variances for height, street trees, building overhangs and bike-lane details. The building would have no parking. One board member objected that the affordable share was too low. Others raised concerns about parking, bike safety and flooding. The developer described the hotel as aimed at stays of about two weeks to a month.

What it could mean nearby

Where it stands

The Planning Board approved the project on July 28, 2026. Nothing found shows construction permits or a start date. Typical next steps are final plan sign-off, building permits and a construction start. Note: Sources differ on the affordable unit count (52 in one report, 57 in another); this does not affect the county facts of 344 apartments and 371 hotel units.

Who's behind it

The Namdar Group · A real estate developer that has built mostly in Jersey City, especially Journal Square, and has also bought development sites in Miami.

Around the web

Planning terms explained
Redevelopment plan
A set of city rules for a specific area that can set its own height, use and parking limits.
Redeveloper
The company the city's redevelopment agency has chosen to build on a site under a redevelopment plan.
Variance
Permission to depart from a zoning or plan rule, such as a height limit.
Affordable housing overlay
A rule that allows extra height in exchange for including income-restricted apartments.
Flood hazard permit
A state permit required for building in or near flood-prone areas.

Researched by AI from public sources on Nov 19, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Planning Board has already voted; residents can still raise concerns with the Jersey City Planning Division and with the state environmental agency, which is reviewing the flood and stormwater permit.

In New Jersey, the Jersey City planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Jersey City's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $82.6M

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →