PlannedNearby

Hudson County · Secaucus Town · #0909-12-0001.1

Chick-fil-A restaurant with drive-thru

450 Harmon Meadow Blvd, Secaucus Town, NJ · restaurant

In short: Chick-fil-A restaurant with drive-thru is a restaurant project at 450 Harmon Meadow Blvd in Secaucus Town, Hudson County, NJ. As of November 24, 2026, it is in review. Latest record: NJDEP flood hazard permit 0909-12-0001.1: approved (August 27, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Named in the records: Chick-fil-A

In review NJDEP flood hazard permit 0909-12-0001.1: approved · Aug 27, 2025 · source
  1. Proposed
  2. In reviewMar 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: a planning commission recommendation, then a vote by the town's governing body.

About this project

A Chick-fil-A restaurant with a dual-lane drive-thru at 450 Harmon Meadow Boulevard in Secaucus, replacing an existing Red Robin restaurant and its parking, within a flood fringe area.

Official description: Removes the existing Red Robin restaurant and parking to construct a Chick-fil-A restaurant with a dual-lane drive-thru, meal order/delivery canopies and associated parking within a flood fringe area.

Applicant
Hartz Mountain Industries Inc
Plan type
State environmental permit application (NJDEP)
Land use
Restaurant
Status
approved

Project history

  • 2025-08-27 · #0909-12-0001.1 · State environmental permit application (NJDEP)
  • 2025-08-27 · NJDEP flood hazard permit 0909-12-0001.1: approved · source
  • 2025-03-10 · NJDEP flood hazard permit 0909-12-0001.1: application filed · source

County plan review office →

The full picture AI research · Nov 11, 2026

Chick-fil-A is proposed to replace the closed Red Robin at 450 Harmon Meadow Boulevard in Secaucus. The new restaurant would have a drive-thru with two lanes. The site is in a flood fringe area, which is land that can flood in a major storm. The site's parking would be rebuilt as part of the work.

The state environmental agency approved a flood hazard permit for the site on 2025-08-27. Local news from February 2026 says the state's Meadowlands land-use agency had approved the plan. It also says the restaurant still needed approval from the Town of Secaucus Zoning Board, and that the mayor expected the town to support it. Town Zoning Board agendas for May and June 2026 list this address for loading-space and sign variances, which are exceptions to the zoning rules. No outcome for those hearings was found. No source shows demolition, construction or an opening.

What it could mean nearby

Where it stands

The state flood hazard permit was approved on 2025-08-27. Town Zoning Board agendas from May and June 2026 list loading and sign variance requests for this address, but no decision or construction was found. A building permit and construction would usually follow local approval.

Who's behind it

Hartz Mountain Industries Inc · Hartz Mountain Industries is the company named on the county filing, and a Patch report names it as the landowner. It is a New Jersey real estate developer with other projects in Secaucus, including a proposed warehouse.

Around the web

Planning terms explained
Flood fringe
Land outside the main floodway that can still flood in a major storm, where building needs a state permit.
Variance
Permission to depart from a zoning rule, such as the required number of loading spaces.
Zoning Board of Adjustment
The town board that decides requests for exceptions to zoning rules.
NJSEA
The New Jersey Sports and Exposition Authority, the state agency that controls land use in the Meadowlands, including Harmon Meadow.

Researched by AI from public sources on Nov 11, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Secaucus Zoning Board of Adjustment hears the variance requests at public meetings, and residents can attend and comment there.

In New Jersey, the Secaucus Town planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Secaucus Town's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →