[Hudson County](https://plannednearby.com/c/hudson-nj/) · [Secaucus Town](https://plannednearby.com/c/hudson-nj/secaucus-town) · #0909-12-0001.1

# Chick-fil-A restaurant with drive-thru

450 Harmon Meadow Blvd, Secaucus Town, NJ · restaurant

In short: **Chick-fil-A restaurant with drive-thru** is a restaurant project at 450 Harmon Meadow Blvd in Secaucus Town, Hudson County, NJ. As of November 24, 2026, it is in review. Latest record: NJDEP flood hazard permit 0909-12-0001.1: approved (August 27, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Named in the records: **Chick-fil-A**

Stage: In review · NJDEP flood hazard permit 0909-12-0001.1: approved · Aug 27, 2025 · [source](https://dspace.njstatelib.org/items/77368cdb-8f2d-47ed-a31f-80f0acec9b6e)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

A Chick-fil-A restaurant with a dual-lane drive-thru at 450 Harmon Meadow Boulevard in Secaucus, replacing an existing Red Robin restaurant and its parking, within a flood fringe area.

Official description: Removes the existing Red Robin restaurant and parking to construct a Chick-fil-A restaurant with a dual-lane drive-thru, meal order/delivery canopies and associated parking within a flood fringe area.

- **Applicant:** [Hartz Mountain Industries Inc](https://plannednearby.com/f/hartz-mountain-industries-inc)
- **Plan type:** State environmental permit application (NJDEP)
- **Land use:** Restaurant
- **Status:** approved

## Project history

- **2025-08-27** · #0909-12-0001.1 · State environmental permit application (NJDEP)
- **2025-08-27** · NJDEP flood hazard permit 0909-12-0001.1: approved · [source](https://dspace.njstatelib.org/items/77368cdb-8f2d-47ed-a31f-80f0acec9b6e)
- **2025-03-10** · NJDEP flood hazard permit 0909-12-0001.1: application filed · [source](https://dspace.njstatelib.org/items/77368cdb-8f2d-47ed-a31f-80f0acec9b6e)

[County plan review office →](https://dspace.njstatelib.org/items/77368cdb-8f2d-47ed-a31f-80f0acec9b6e)

## The full picture AI research · Nov 11, 2026

Chick-fil-A is proposed to replace the closed Red Robin at 450 Harmon Meadow Boulevard in Secaucus. The new restaurant would have a drive-thru with two lanes. The site is in a flood fringe area, which is land that can flood in a major storm. The site's parking would be rebuilt as part of the work.

The state environmental agency approved a flood hazard permit for the site on 2025-08-27. Local news from February 2026 says the state's Meadowlands land-use agency had approved the plan. It also says the restaurant still needed approval from the Town of Secaucus Zoning Board, and that the mayor expected the town to support it. Town Zoning Board agendas for May and June 2026 list this address for loading-space and sign variances, which are exceptions to the zoning rules. No outcome for those hearings was found. No source shows demolition, construction or an opening.

### What it could mean nearby

- The drive-thru could add car traffic and queuing at Harmon Meadow. The town agendas show loading-space questions, but no traffic study was found.
- Building in a flood fringe area is why the state flood permit was needed.
- The site is an existing restaurant lot, so the project reuses developed land instead of building on open space.

### Where it stands

The state flood hazard permit was approved on 2025-08-27. Town Zoning Board agendas from May and June 2026 list loading and sign variance requests for this address, but no decision or construction was found. A building permit and construction would usually follow local approval.

- **Jun 8, 2026** Secaucus Zoning Board agenda lists loading and sign variance requests for 450 Harmon Meadow Blvd (outcome not found)
- **May 11, 2026** The same address appears on the Zoning Board agenda for a loading variance
- **Feb 20, 2026** Patch reports that Chick-fil-A plans to replace the closed Red Robin
- **Aug 27, 2025** State flood hazard permit approved
- **Mar 10, 2025** State flood hazard permit application filed

### Who's behind it

Hartz Mountain Industries Inc · Hartz Mountain Industries is the company named on the county filing, and a Patch report names it as the landowner. It is a New Jersey real estate developer with other projects in Secaucus, including a proposed warehouse.

### Around the web

- [Chick-fil-A proposed to open in Secaucus](https://patch.com/new-jersey/secaucus/chick-fil-proposed-open-secaucus) — Patch · Feb 20, 2026Reports that Chick-fil-A would replace the closed Red Robin with a drive-thru, that the NJSEA had approved it, and that it still needed town approval.
- [Chick-fil-A Plans to Replace Red Robin in Secaucus](https://wmtram.com/2026/02/24/chick-fil-a-plans-to-replace-red-robin-in-secaucus/) — WMTR AM · Feb 24, 2026Repeats the plan to replace the Red Robin and says the Zoning Board had not yet approved it.

Planning terms explained

- **Flood fringe:** Land outside the main floodway that can still flood in a major storm, where building needs a state permit.
- **Variance:** Permission to depart from a zoning rule, such as the required number of loading spaces.
- **Zoning Board of Adjustment:** The town board that decides requests for exceptions to zoning rules.
- **NJSEA:** The New Jersey Sports and Exposition Authority, the state agency that controls land use in the Meadowlands, including Harmon Meadow.

Researched by AI from public sources on Nov 11, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Secaucus Zoning Board of Adjustment hears the variance requests at public meetings, and residents can attend and comment there.

In New Jersey, the Secaucus Town planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.

[Find Secaucus Town's meeting agendas →](https://www.google.com/search?q=Secaucus+Town+NJ+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Data center redevelopment](https://plannednearby.com/x/njb-0909-20-0002) — 0.3 mi · data center · Secaucus Town · filed 2025-12-18
- [123,225-sq-ft data center building](https://plannednearby.com/x/njb-0909-26-0003) — 0.5 mi · 123,225 sq ft non-residential, data center · Secaucus Town · filed 2026-10-19
- [Multifamily building, 720 8th St](https://plannednearby.com/x/njp-0910-42-9) — 1.9 mi · apartments · Union City · filed 2024-04-26
- [1406 Summit Ave](https://plannednearby.com/x/njp-0910-70-20) — 1.9 mi · apartments · Union City · filed 2025-04-07
- [460-unit mixed-use building](https://plannednearby.com/x/njb-0906-15-0019) — 2.0 mi · 460 homes, mixed use · Jersey City · filed 2025-08-29
- [Building permit (new construction) in Lyndhurst Township](https://plannednearby.com/x/njp-0232-233-10) — 2.0 mi · 1,731,024 sq ft non-residential, office · Lyndhurst Township · filed 2024-08-07

[See everything nearby on a map →](https://plannednearby.com/near#40.77022,-74.07547,Secaucus%20Town)

---

Source page: https://plannednearby.com/x/njb-0909-12-0001

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.