# 123,225-sq-ft data center building

215 County Avenue, Secaucus Town, NJ · 123,225 sq ft non-residential, data center

In short: **123,225-sq-ft data center building** is a data center project at 215 County Avenue in Secaucus Town, Hudson County, NJ. It would add 123,225 sq ft of non-residential space. Its estimated construction value is about $86.3M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: NJDEP flood hazard permit 0909-26-0003.1: approved (October 19, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · NJDEP flood hazard permit 0909-26-0003.1: approved · Oct 19, 2026 · [source](https://dspace.njstatelib.org/items/544a1d9d-5ae9-4e84-9110-1e87a0e1902a)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

The existing building at 215 County Avenue in Secaucus Town, Hudson County, would be demolished and replaced with a new four-story data center with a 123,225 sq ft footprint, plus parking, loading, and stormwater upgrades.

Official description: Demolish the existing building and construct a new four-story data center with a 123,225 sq ft footprint, along with parking, loading, and stormwater upgrades.

- **Plan type:** State environmental permit application (NJDEP)
- **Land use:** Data center
- **Status:** approved

## Project history

- **2026-10-19** · #0909-26-0003.1 · State environmental permit application (NJDEP) · 123,225 sq ft
- **2026-10-19** · NJDEP flood hazard permit 0909-26-0003.1: approved · [source](https://dspace.njstatelib.org/items/544a1d9d-5ae9-4e84-9110-1e87a0e1902a)
- **2026-07-17** · NJDEP flood hazard permit 0909-26-0003.1: application filed · [source](https://dspace.njstatelib.org/items/544a1d9d-5ae9-4e84-9110-1e87a0e1902a)

[County plan review office →](https://dspace.njstatelib.org/items/544a1d9d-5ae9-4e84-9110-1e87a0e1902a)

## The full picture AI research · Nov 20, 2026

CoreSite, a data center company, wants to tear down the existing industrial building at 215 County Avenue in Secaucus. It would replace the building with a four-story data center, which the project calls NY4. County records give a footprint of about 123,225 sq ft. A public notice describes the total building, with accessory offices, as about 446,761 sq ft. The plan also includes parking, loading areas and stormwater upgrades.

The site is in a light-industrial zone. The developer asked the Secaucus Zoning Board of Adjustment for site plan approval and for exceptions to the rules. It wants 70 parking spaces where 385 are normally required, 2 loading spaces where 3 are required, and relief on screening along the west side. A hearing was scheduled for May 11, 2026. The board's June 8, 2026 agenda also listed the site.

The state has approved a flood hazard permit for the site. No news coverage, opposition, or board decision was found. No sign of demolition or construction was found either.

### What it could mean nearby

- Parking would be far below the normal requirement (70 spaces versus 385), which is why the board must grant an exception. Data centers typically employ few people.
- Loading would be 2 bays instead of the 3 normally required.
- The state flood hazard permit points to a site that needs flood-related design and stormwater controls.

### Where it stands

The state approved the flood hazard permit on 2026-10-19. The local zoning board's decision on the site plan and exceptions was not found, so the project is treated as under review. If the board approves, demolition and building permits would normally follow.

- **Oct 19, 2026** NJDEP flood hazard permit approved
- **Jul 17, 2026** NJDEP flood hazard permit application filed
- **Jun 8, 2026** Zoning Board of Adjustment agenda lists 215 County Ave (outcome not found)
- **May 11, 2026** Zoning Board hearing scheduled on CoreSite's application
- **2022** CoreSite reportedly bought the site (per a data center directory)

### Who's behind it

[CoreSite Real Estate NY4 LLC (CoreSite)](https://www.coresite.com/) · CoreSite is a data center operator owned by American Tower. It already runs other Secaucus data centers, including NY2 and NY3.

### Around the web

- [Public hearing notice, Secaucus](https://www.noticeregistry.com/new-jersey/notice/public-hearing-secaucus-1687577) — Notice Registry · May 1, 2026Lists CoreSite's application for 215 County Ave: demolition, a roughly 446,761 sq ft data center, and variances for parking, loading and screening.
- [CoreSite: Secaucus NY4](https://baxtel.com/data-center/coresite-secaucus-ny4) — BaxtelA directory lists NY4 as a planned facility, says CoreSite bought a vacant industrial building in 2022, and gives a 2028 target.
- [CoreSite NY4](https://datacenterhawk.com/marketplace/providers/coresite/215-county-avenue/ny4) — datacenterHawkA directory entry whose status is contradictory, and it does not show an operating facility.

Planning terms explained

- **Zoning Board of Adjustment:** A local board that decides requests to depart from zoning rules and reviews certain site plans.
- **Bulk variance:** Permission to depart from numeric rules such as the required number of parking spaces.
- **Preliminary and final major site plan:** The board's approval of the building layout, parking, drainage and landscaping.
- **Flood hazard permit:** A state environmental permit for building in or near flood-prone areas.
- **Accessory office space:** Offices that support the main data center use.

Researched by AI from public sources on Nov 20, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Secaucus Zoning Board of Adjustment decides the site plan and exceptions, and residents can comment at its public hearings at Town Hall. Dates are on the town's website.

In New Jersey, the Secaucus Town planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.

[Find Secaucus Town's meeting agendas →](https://www.google.com/search?q=Secaucus+Town+NJ+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$86.3M**

- ~616 roofing squares (assumes 2 stories)
- ~308 tons of cooling (rule of thumb 400 sq ft/ton)

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Chick-fil-A restaurant with drive-thru](https://plannednearby.com/x/njb-0909-12-0001) — 0.5 mi · restaurant · Secaucus Town · filed 2025-08-27
- [Data center redevelopment](https://plannednearby.com/x/njb-0909-20-0002) — 0.6 mi · data center · Secaucus Town · filed 2025-12-18
- [1406 Summit Ave](https://plannednearby.com/x/njp-0910-70-20) — 1.5 mi · apartments · Union City · filed 2025-04-07
- [Multifamily building, 720 8th St](https://plannednearby.com/x/njp-0910-42-9) — 1.5 mi · apartments · Union City · filed 2024-04-26
- [Storage building north of Route 3, Secaucus](https://plannednearby.com/x/njp-0909-227-9) — 1.8 mi · 775,000 sq ft non-residential, warehouse & storage · Secaucus Town · filed 2026-09-22
- [531 32nd St multifamily building](https://plannednearby.com/x/njp-0910-170-15-01) — 1.9 mi · apartments · Union City · filed 2024-01-22

[See everything nearby on a map →](https://plannednearby.com/near#40.77182,-74.06549,Secaucus%20Town)

---

Source page: https://plannednearby.com/x/njb-0909-26-0003

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.