123-unit residential development with veterans apartments

23 Stangl Road, Flemington Borough, NJ · 123 homes, townhomes

In short: 123-unit residential development with veterans apartments is a townhome development at 23 Stangl Road in Flemington Borough, Hunterdon County, NJ. It would add 123 homes. Its estimated construction value is about $45.5M, a rough estimate from its size. As of November 24, 2026, it is permitted (building or site permits issued) according to web research. Latest record: The county records show the NJDEP flood hazard permit approved on 2026-01-12. No source found shows work under way, and no site plan approval was found. What usually happens next: site work and construction.

Permitted The county records show the NJDEP flood hazard permit approved on 2026-01-12. No source found shows work under way, and no site plan approval was found. · web research checked Nov 18, 2026 · source AI research
  1. Proposed
  2. In reviewDec 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: site work and construction.

About this project

The former Liberty Village Mall at 23 Stangl Road in Flemington Borough would be demolished for 111 townhouses, 104 market rate and 7 affordable. Two six-unit affordable veterans apartment buildings are also planned, along with land donations and a well facility expansion.

Official description: The former Liberty Village Mall would be demolished to build 111 townhouses (104 market rate, 7 affordable) and two six-unit affordable veterans apartment buildings, along with land donations and well facility expansion.

Plan type
State environmental permit application (NJDEP)
Land use
Townhomes
Status
approved

Project history

  • 2026-01-12 · #1009-23-0001.1 · State environmental permit application (NJDEP) · 123 lots/units
  • 2026-01-12 · NJDEP flood hazard permit 1009-23-0001.1: approved · source
  • 2025-12-04 · NJDEP flood hazard permit 1009-23-0001.1: application filed · source

County plan review office →

The full picture AI research · Nov 18, 2026

The former Liberty Village outlet mall at 23 Stangl Road in Flemington Borough would be demolished and replaced with housing. County records describe 111 townhouses (104 at market rate, 7 affordable) and two six-unit affordable apartment buildings for veterans. That is 123 homes in all. The plan also includes land donations and an expansion of a well facility.

The site is the former outlet center, which is a polluted "brownfield" site and partly in a flood zone. News coverage from December 2023 says the borough's redevelopment plan was scaled back. Townhomes dropped from 160 to 111, and a plan for 225 apartments became the two veterans buildings. The developer is HBC Liberty Village, which is tied to Hoboken Brownstone Co. It also agreed to donate $2 million for infrastructure anywhere in the borough.

The state flood hazard permit for the site was approved on 2026-01-12. No evidence was found that demolition or construction has started.

What it could mean nearby

Where it stands

The state environmental agency approved the flood hazard permit on 2026-01-12. No later borough site plan approval, building permit or construction start was found. Site plan approval by the borough Planning Board, then building permits, would usually come next. Note: A December 2023 news report described the plan as 111 townhomes plus 12 veterans apartments, which matches the county's 123 homes. Earlier reports cited larger counts, but those were superseded.

Who's behind it

HBC Liberty Village LLC · A company tied to Hoboken Brownstone Co., the redeveloper designated by Flemington Borough for the Liberty Village site.

Around the web

Planning terms explained
Redevelopment plan
A borough-adopted plan that sets the rules for rebuilding a designated area and can override normal zoning.
Redeveloper
The company the borough designates to carry out a redevelopment plan.
Flood hazard permit
A state environmental permit required to build in or near flood-prone areas.
Site plan approval
Planning Board approval of the detailed layout of buildings, roads and drainage before construction.
PILOT
A payment in lieu of taxes, a negotiated payment that replaces standard property taxes on a project.

Researched by AI from public sources on Nov 18, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Flemington Borough Planning Board would hear any site plan application at public meetings, and the Borough Council oversees the redevelopment agreement. Check the borough's website for agendas.

In New Jersey, the Flemington Borough planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

Find Flemington Borough's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $45.5M

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →