[Monmouth County](https://plannednearby.com/c/monmouth-nj/) · [Eatontown Borough](https://plannednearby.com/c/monmouth-nj/eatontown-borough) · #1300-09-0002.1

# Netflix studio campus, Phase 1B/2A

Various Locations, Former Fort Monmouth, Eatontown Borough, NJ · industrial · 197.0 acres

In short: **Netflix studio campus, Phase 1B/2A** is an industrial development at Various Locations in Eatontown Borough, Monmouth County, NJ. The site is 197.0 acres. As of November 24, 2026, it is under construction according to web research. Latest record: NJBIZ reported on June 23, 2026 that Netflix topped off Stages 3 and 4, had begun Stages 7 and 8, and was preparing future phases at the Fort Monmouth campus. What usually happens next: completion and occupancy.

Stage: Under construction · NJBIZ reported on June 23, 2026 that Netflix topped off Stages 3 and 4, had begun Stages 7 and 8, and was preparing future phases at the Fort Monmouth campus. · web research checked Nov 11, 2026 · [source](https://njbiz.com/netflix-tops-off-first-stages-at-fort-monmouth-studio-photos/) AI research

Usually next: completion and occupancy.

## About this project

Phase 1B/2A of a film and television studio campus on the former Fort Monmouth site in Eatontown Borough, covering about 197 acres, with multiple production buildings, parking, utilities, a perimeter wall, and offsite utility and roadway work.

Official description: Phase 1B/2A of a studio campus on the former Fort Monmouth base, with multiple buildings for film, television and broadcast production, plus parking, utilities, a perimeter wall, and offsite utilities and roadway widening.

- **Plan type:** State environmental permit application (NJDEP)
- **Land use:** Industrial
- **Status:** 30-day public comment period

## Project history

- **2025-09-03** · #1300-09-0002.1 · State environmental permit application (NJDEP)
- **2025-09-03** · NJDEP coastal (CAFRA) permit 1300-09-0002.1: 30-day public comment period · [source](https://dspace.njstatelib.org/items/e9bfca0b-6673-482e-ae30-1a9cf66698a8)
- **2025-07-21** · NJDEP coastal (CAFRA) permit 1300-09-0002.1: application filed · [source](https://dspace.njstatelib.org/items/e9bfca0b-6673-482e-ae30-1a9cf66698a8)
- **2025-07-17** · NJDEP coastal (CAFRA) permit 1300-09-0002.10: application filed · [source](https://dspace.njstatelib.org/items/73e03d8f-74b4-4e0e-92cf-110a77f9e25f)

[County plan review office →](https://dspace.njstatelib.org/items/e9bfca0b-6673-482e-ae30-1a9cf66698a8)

## The full picture AI research · Nov 11, 2026

Netflix is building a film and TV studio campus on the former Fort Monmouth Army base. The county record covers one stage of it, Phase 1B/2A. That stage is about 197 acres in Eatontown. It includes several production buildings, parking, utilities, a perimeter wall, and utility and road work off the site. The whole campus is about 290 acres across Eatontown and Oceanport. Plans call for 12 soundstages and roughly $1 billion of investment.

The site was an Army base that has been mostly cleared of old buildings. The county's last filing is a state coastal permit (CAFRA) application, which was open for public comment in September 2025. News reports show the campus is already under construction. Netflix began work in May 2025. In June 2026 it marked the topping-off of Stages 3 and 4, and work had begun on Stages 7 and 8. Netflix gives summer 2027 for the first phase and fall 2028 for the next one.

### What it could mean nearby

- Neighbors in Oceanport raised concerns about traffic, noise, night lighting and the wall. Netflix agreed to some landscaping buffers and to coordinate with the county on road and signal improvements.
- Netflix projects about 3,500 construction jobs and about 1,400 permanent jobs. These are Netflix's own figures.
- The Eatontown road reconstruction (Nicodemus and Wilson Avenues) was in the bidding and contract stage in late 2025.
- The site must obtain a state permit waiver for any work in wetland transition areas, so environmental review applies.

### Where it stands

Construction of the wider campus is under way, with the first soundstages framed. The state coastal permit for this Phase 1B/2A stage was last shown in public comment in September 2025. No source found shows the permit decision or the exact start of Phase 1B/2A work. Note: Sources give the whole campus as about 289 to 292 acres, while the county record gives 197 acres for this phase; this is probably a difference in scope rather than a true conflict.

- **Jun 23, 2026** Netflix marked topping-off of Stages 3 and 4 and said work had begun on Stages 7 and 8
- **Jan 2026** Netflix closed its roughly $55 million purchase of the site
- **Sep 3, 2025** 30-day public comment period opened on the state coastal (CAFRA) permit
- **Jul 21, 2025** CAFRA permit application filed for permit 1300-09-0002.1
- **Jul 17, 2025** CAFRA permit application filed for permit 1300-09-0002.10
- **May 13, 2025** Groundbreaking ceremony for the studio campus

### Who's behind it

Netflix, Inc. · Netflix is a streaming and entertainment company that is building a large East Coast production campus at Fort Monmouth.

### Around the web

- [Netflix tops off first stages at Fort Monmouth studio](https://njbiz.com/netflix-tops-off-first-stages-at-fort-monmouth-studio-photos/) — NJBIZ · Jun 23, 2026Stages 3 and 4 were topped off, work had started on Stages 7 and 8, and Phase 1A is on track for summer 2027 and Phase 1B for fall 2028.
- [Netflix Fort Monmouth posts first jobs at $1B studio](https://njbiz.com/netflix-fort-monmouth-first-jobs-1b-studio/) — NJBIZ · Feb 2026Netflix posted its first jobs for the studio, with the full 12-stage complex expected in 2028.
- [Officials mark closing of Netflix Fort Monmouth deal](https://njbiz.com/officials-mark-netflix-fort-monmouth-deal-closing/) — NJBIZ · Jan 2026The land purchase for the site closed.
- [Netflix Breaks Ground on Major N.J. Production Facility](https://www.tvtechnology.com/news/netflix-breaks-ground-on-major-n-j-production-facility) — TV Technology · May 13, 2025Netflix broke ground on a campus of 12 soundstages.
- [Netflix Gets Approval to Demolish 47 Buildings for Final Phase of NJ Mega-Studio](https://thedigestonline.com/news/netflix-final-approval-fort-monmouth-demolition-nj-studio/) — The DigestThe Oceanport board approved the last phase, and Eatontown had approved Phase Two in September.

Planning terms explained

- **CAFRA:** The Coastal Area Facility Review Act, a New Jersey law that requires a state permit for larger developments near the coast.
- **Topping out:** The point when the last structural beam of a building is placed.
- **Soundstage:** A large, soundproofed building used to film movies and TV shows.
- **FMERA:** The Fort Monmouth Economic Revitalization Authority, the state body that oversees redevelopment of the former base.
- **Transition area waiver:** State permission to disturb the buffer around a freshwater wetland.

Researched by AI from public sources on Nov 11, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The comment period on the state coastal permit ran 30 days from 2025-09-03 and has closed. The state environmental agency (NJDEP) decides that permit, and the Fort Monmouth redevelopment authority board meets monthly with public comment.

In New Jersey, the Eatontown Borough planning board or zoning board of adjustment decides at a public hearing. Nearby property owners are notified by mail, and the hearing is advertised.

- Speaking at the hearing carries the most weight: anyone can testify or ask the applicant's experts questions, and it all goes on the record.
- You can also write to the board secretary before the hearing, though boards decide mainly on the testimony given at the hearing.

[Find Eatontown Borough's meeting agendas →](https://www.google.com/search?q=Eatontown+Borough+NJ+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Block 2201, Lot 1.04 apartments](https://plannednearby.com/x/njp-1311-2201-1-04) — 0.6 mi · apartments · Eatontown Borough · filed 2025-11-17
- [Multi-family and dormitory building, Eatontown](https://plannednearby.com/x/njp-1311-2201-2) — 0.7 mi · apartments · Eatontown Borough · filed 2025-08-12
- [Block 2201, Lot 1.02 apartments](https://plannednearby.com/x/njp-1311-2201-1-02) — 0.8 mi · apartments · Eatontown Borough · filed 2025-11-17
- [Accessory structures, Block 601, Lot 1.02](https://plannednearby.com/x/njp-1311-601-1-02) — 0.8 mi · 1,837 sq ft non-residential, other · Eatontown Borough · filed 2025-08-07
- [145-lot subdivision with self-storage and dealership](https://plannednearby.com/x/njb-1300-13-0010) — 1.0 mi · mixed use · Eatontown Borough · filed 2025-07-21
- [Low-hazard storage building, Tinton Falls](https://plannednearby.com/x/njp-1336-109-04-3) — 1.1 mi · 10,500 sq ft non-residential, warehouse & storage · Tinton Falls Borough · filed 2024-06-11

[See everything nearby on a map →](https://plannednearby.com/near#40.28532,-74.07000,Eatontown%20Borough)

---

Source page: https://plannednearby.com/x/njb-1300-09-0002

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
